PROJECT : DC-02-Part Design and Construction of elevated

Viaduct from Chainage 0.0 m to 12098.52 M of Majilis


Park - Maujpur Corridor of Delhi MRTS Phase-IV

CLIENT - DELHI METRO RAIL CORPORATION LTD.

CONTRACTOR - LONGJIAN - KEC (JV)

Report on Initial Vertical Load Test for Pile No.- TP-07

Rev. Date Purpose of Issue Prepared Checked ITD Cem Client


by by

R0 14/9/2020 For Submission

NG SNK

ITD Cem Project No. : CF048820

Output Record No. : ITDC/DivIII/CF048820/R0


ITD CEMENTATION INDIA LIMITED

DC-02-Part Design and Construction of elevated Viaduct from Chainage 0.0 m to 12098.5
Project : Delhi MRTS Phase-IV

Subject: Report on Initial Vertical Load Test for Pile No.- TP-07

TABLE 2: LOAD VS SET

1.69 2.74

LVDT-1 - LVDT-0-
Increment No.
Upper Lower

0 1.69 0 2.74 0

1 2.19 0.5 3.18 0.44

2 2.29 0.6 3.29 0.55

3 2.45 0.76 3.45 0.71

4 2.56 0.87 3.57 0.83

5 2.65 0.96 3.65 0.91

6 2.68 0.99 3.69 0.95

7 2.81 1.12 3.8 1.06

8 3.1 1.41 4.07 1.33

9 3.26 1.57 4.21 1.47

10 3.45 1.76 4.39 1.65

11 3.82 2.13 4.71 1.97

12 3.97 2.28 4.85 2.11

13 4.25 2.56 5.11 2.37

12 4.24 2.55 5.1 2.36

11 4.22 2.53 5.08 2.34

10 4.19 2.5 5.05 2.31

9 4.17 2.48 5.01 2.27

8 4.16 2.47 4.99 2.25

7 4.15 2.46 4.98 2.24

6 4.13 2.44 4.95 2.21


5 4 2.31 4.9 2.16

4 4 2.31 4.9 2.16

3 3.98 2.29 4.88 2.14

2 3.96 2.27 4.87 2.13

1 3.95 2.26 4.86 2.12

0 3.94 2.25 4.85 2.11


vated Viaduct from Chainage 0.0 m to 12098.52 M of Majilis Park - Maujpur Corridor of

No.- TP-07

TABLE 2: LOAD VS SETTLEMENT DATA FOR 1ST CYCLE

Displacement
Applied Load (MT)
in mm

0.00 0.00

1.06 0.63

1.59 0.71

2.12 0.87

2.65 0.96

3.18 1.07

3.71 1.08

4.24 1.25

5.30 1.58

5.83 1.79

6.36 2.00

6.89 2.48

7.42 2.65

7.95 2.97

7.42 2.96

6.89 2.94

6.36 2.91

5.83 2.94

5.30 2.95

4.24 2.94

3.71 2.94
3.18 2.64

2.65 2.64

2.12 2.62

1.59 2.57

1.06 2.56

0.00 2.55

Gross Settlement = 2.97

Net Settlement = 2.55

Rebound = 0.42
ITD CEMENTATION INDIA LIMITED

DC-02-Part Design and Construction of elevated Viaduct from Chainage 0.0 m to


Project :
12098.52 M of Majilis Park - Maujpur Corridor of Delhi MRTS Phase-IV

Subject : Report on Initial Vertical Load Test for Pile No.- TP-07

FIG. 1: Load vs Displacement Curve

Applied Load (MT)


0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
0

4 85 MT

8
Settlement (mm)

10

12

14

16

18

20

22

24

26

28
30 mm
30

32
om Chainage 0.0 m to
S Phase-IV

120 130 140 150 Load on Pile Head (MT)


0 2 4 6 8 10 12 14
0

2
834.2 5.42 850 5.7
Pile Head Displacement (mm)

3 918.42 7 Err:509 Err:509

4
1040 9.7 5.83 1.786667

5 mm 1100 11.2 6.36 1.998333


5
7.42 2.476667
6
7.95 2.648333

7 Err:509 Err:509

Err:509 2.971667
8
7.42 2.961667
9
6.89 2.941667

10 Err:509 Err:509