Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

General Notes

1. Do not scale drawings. Dimensions govern.


2. All dimensions are in millimetres unless noted otherwise.
3. All levels are in metres unless noted otherwise.
4. All dimensions shall be verified on site before proceeding with the work.
5. Foster + Partners shall be notified in writing of any discrepancies.
6. Any areas indicated on this sheet are approximate and indicative only.
6210
WET LOUNGE STEAM ROOM REQUIREMENTS WET LOUNGE SAUNA REQUIREMENTS WET LOUNGE EXPERIENCE SHOWER
1040 1670 840 1610 1060
POWER SUPPLY POWER SUPPLY POWER SUPPLY
WET LOUNGE SAUNA
TEMP = 70°C - 95°C
THE MEP CONTRACTOR IS REQUIRED TO SUPPLY THE FOLLOWING CABLE INTO THE MEP CONTRACTOR IS REQUIRED TO SUPPLY THE FOLLOWING CABLE INTO THE MEP CONTRACTOR IS REQUIRED TO SUPPLY THE FOLLOWING CABLE INTO
HUMIDITY = 5 - 15%
THE SPA CONTRACTOR CONTROL PANEL THE SPA CONTRACTOR CONTROL PANEL THE SPA CONTRACTOR CONTROL PANEL
AIR CHANGE QUANTITY:
U/B LED STRIP LIGHT =384-480m3/hr.
CP01 - 3+N+PE x 200A ISOLATOR TO CONTROL PANEL SHOULD BE PROVIDED BY CP01 - 3+N+PE X 200A ISOLATOR TO CONTROL PANEL SHOULD BE PROVIDED BY CP01 - 3+N+PE X 200A ISOLATOR TO CONTROL PANEL SHOULD BE PROVIDED BY
CABIN VOLUME = 48m3
MEP CONTRACTOR IN PLANT ROOM. (COMBINED WITH EXPERIENCE MEP CONTRACTOR IN PLANT ROOM (COMBINED WITH STEAM, ICE MEP CONTRACTOR IN PLANT ROOM (COMBINED WITH STEAM, ICE
SHOWER, ICE FOUNTAIN AND SAUNA) FOUNTAIN AND EXPERIENCE SHOWER) FOUNTAIN AND SAUNA)

SAFETY GRILLE FULL ALARMS ALARMS DRAINAGE DATA


BACKREST LED
LENGTH ABOVE HEATER
780
STRIP LIGHT WET LOUNGE PANIC BUTTON - WIRING FROM EMERGENCY STOP IN THERMAL CABIN TO PANIC BUTTON - WIRING FROM EMERGENCY STOP IN THERMAL CABIN TO ALL DRAINAGE POINTS TO BE PROVIDED BY THE MEP CONTRACTOR ALL POINTS
4x WOODEN FUNNEL SAUNA 4x HEAD REST TS02 CONTROL PANEL BY SPA CONTRACTOR, FROM CONTROL PANEL VOLT FREE CONTROL PANEL BY SPA CONTRACTOR, FROM CONTROL PANEL VOLT FREE TO HAVE SUITABLE TRAPS FITTED FOR CONNECTION OF WASTE WATER PIPE
THERMO HYGROMETER CONTACT TO ALARM SYSTEM (BMS) BY MEP CONTRACTOR. WHEN PANIC CONTACT TO ALARM SYSTEM (BMS) BY MEP CONTRACTOR. WHEN PANIC WORK.
BUTTON IS PRESSED ALL MAIN EQUIPMENT SHOULD SWITCH OFF + EXTRACT BUTTON IS PRESSED ALL MAIN EQUIPMENT SHOULD SWITCH OFF + EXTRACT
SH02a
HOUR GLASS FAN SHOULD RUN UNTIL ALARM IS RESET. NO STAND ALONE ALARM SYSTEM IS FAN SHOULD RUN UNTIL ALARM IS RESET. NO STAND ALONE ALARM SYSTEM IS DRAINAGE POINTS PROVIDED MUST BE SUITABLE OF DRAINING THE SHOWER

550

550
DESIGNED. DESIGNED. FLOW RATE.

SH01b
1180

THERMO ASPEN WOOD AV SUPPLY AV SUPPLY LD03 - LINEAR DRAIN WITH SMELL TRAP AND 1% SLOPE AT SHOWER ROOM
FOR BENCH & BACKREST CAPABLE OF 80 L/MIN FLOW
SH01a SPA CONTRACTOR WILL WIRE FROM THE SPEAKER INSIDE THE STEAM ROOM SPA CONTRACTOR WILL WIRE FROM THE SPEAKER INSIDE THE SAUNA BACK TO LD04 - LINEAR DRAIN WITH SMELL TRAP AND 1% SLOPE AT SHOWER ROOM AT

630

630
HEAT RESISTANT PANELS U/B SPEAKER 2x U/B CLEANING LIGHT BACK TO THE ELECTRICAL CONTROL PANEL, LOCATED IN THE PLANT ROOM. IT THE ELECTRICAL CONTROL PANEL, LOCATED IN THE PLANT ROOM. IT IS THE ROOM ENTRANCE RECOMMENDED

30

R1
IS THE MEP CONTRACTOR'S RESPONSIBILITY TO WIRE FROM THEIR MEP CONTRACTOR'S RESPONSIBILITY TO WIRE FROM THEIR AMPLIFIER/SOUND FD02 - DN40 FIXED DRAIN CONNECTION FOR WATER SUPPLY UNIT AT CEILING

R1

30
AMPLIFIER/SOUND SYSTEM TO THE TERMINALS LEFT INSIDE THE ELECTRICAL SYSTEM TO THE TERMINALS LEFT INSIDE THE ELECTRICAL CONTROL PANEL. VOID
SH01b CONTROL PANEL. PLEASE NOTE THAT THE SPEAKER PROVIDED WORKS ON A 4 PLEASE NOTE THAT THE SPEAKER PROVIDED WORKS ON A 4 OHM INPUT
220

PANIC
BUTTON OHM INPUT IMPEDANCE. IT IS THE MEP CONTRACTOR'S RESPONSIBILITY TO IMPEDANCE. IT IS THE MEP CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE WATER SUPPLIES
EXTRACT AIR PROVIDE THE CORRECT SUPPLY TO PLAY THE REQUIRED MUSIC WITHIN THE CORRECT SUPPLY TO PLAY THE REQUIRED MUSIC WITHIN THE SAUNA.
STEAM ROOM. HWS01 - 3/4" VALVED HOT WATER SUPPLY AT 3 BAR PRESSURE RECOMMENDED
4 x SUPPLY AIR POSITION 815 DRAINAGE FLOW-54 L/MIN FOR WATER SUPPLY UNIT AT CEILING VOID 3.0M FROM
THERMO ASPEN WOOD FFL. (LOOP SUPPLY REQUIRED TO ENSURE HOT WATER ON DEMAND IS
110/54 + 180 MM ABOVE FFL 835 VERTICAL PANELS FOR DRAINAGE AS THE SAUNA IS A HOT AND DRY ROOM IT DOES NOT REQUIRE A FLOOR AVAILABLE NO DEAD LEGS)

800
WALLS & CEILING (TBC BY ID) DRAIN.
REMOVE BLOCK WORK PUSH BUTTON ALL DRAINAGE POINTS TO BE PROVIDED BY THE MEP CONTRACTOR ALL POINTS CWS03 - 3/4" VALVED COLD COOLED WATER SUPPLY AT 3 BAR PRESSURE,
LD04 TO HAVE SUITABLE TRAPS FITTED FOR CONNECTION OF WASTE WATER PIPE WATER SUPPLIES RECOMMENDED FLOW-26 L/MIN MINIMUM TEMPERATURE MUST BE
10mm TEMPERED CLEAR
SAFETY GLASS DOOR WITH WORK. BELOW 18°C REQUIRED FOR WATER SUPPLY UNIT AT CEILING VOID 02 22/09/23 REVISED 100% DESIGN MBA
BRUSHED ALUMINUM FRAME STRUCTURE = BY CIVIL/STRUCTURAL FACADE WATER SUPPLY NOT REQUIRED 3.0M FROM FFL (LOOP SUPPLY REQUIRED TO ENSURE COLD WATER ON DEVELOPMENT
WET LOUNGE & WATER PROOFING CONTRACTOR LD01 - LINEAR DRAIN WITH SMELL TRAP AND 1% SLOPE AT DOOR FOR STEAM DEMAND IS AVAILABLE NO DEAD LEGS)
EXPERIENCE SHOWER 01 28/07/23 100% DESIGN DEVELOPMENT MBA
ROOM RECOMMENDED SAUNA VENTILATION
VENTILATION (BY HVAC CONTRACTOR) 00 25/05/21 SCHEMATIC DESIGN JS
300 x 300mm ACCESS
HATCH FOR MAINTENANCE FD03 LD02 - 2 x LINEAR DRAIN WITH SMELL TRAP AND 1% SLOPE BELOW THE SEAT SPA CONTRACTOR WILL PROVIDE THE FAN+CONTROLS AND THE AIR OUTLET Rev. Date Reason For Issue Drn.
OF STEAM ROOM PIPE (PVC 110MM) UP TO THE PLANT ROOM FROM THERE TO ATMOSPHERE BY STRUCTURE OF EXPERIENCE SHOWER
WET LOUNGE ICE FOUNTAIN PEDESTAL THE CUSTOMER. RECOMMEND MOTORIZED OR MANUAL DAMPER ON THE MEP DESIGN DEVELOPMENT
ICE FOUNTAIN (FINAL DESIGN TBC BY ID) FD01 - DN40 FIXED CONNECTION AT STEAM GENERATOR FOR HOT WATER 90°C EXTRACT DUCT TO ENSURE CORRECT FLOW IS MAINTAINED AS STATED. WALLS, FLOOR & CEILING AS PER ID DESIGN
FG03 Key Plan.
1810 ICE COLLECTION BOWL AIR QUANTITY 8-10 AIR CHANGES 384-480M³/HR FLOW REQUIRED
490 840 490 (SIZE+TYPE TBC BY ID) FG01 - CENTER FLOOR DRAIN WITH SMELL TRAP AND 1% SLOPE FOR STEAM
ROOM FRESH AIR TO SAUNA IS DRAWN FROM SURROUNDING AREA OF THE SAUNA CARIBBEAN STORM SHOWER PROGRAMME
815 CABIN, AN OPENING OF 110x54mm IS PROVIDED IN THE SAUNA WALL BEHIND
FG02 - CENTRAL FLOOR DRAIN FOR CLEANING AND MAINTENANCE IN PLANT THE SAUNA HEATER. THUS SURROUNDING AREA OF THE SAUNA CABIN NEEDS DETAILS OF PUSH BUTTON PLATE (SHOWER CONTROLLER)
10mm TEMPERED FROSTED LD03
ROOM TO BE VENTILATED. STANDBY MODE: ILLUMINATION WHITE
SAFETY GLASS DOOR WITH
BRUSHED ALUMINUM FRAME PROGRAMME 1: (BUTTON-TROPICAL RAIN)
WATER SUPPLIES FLOOR
REMOVE BLOCK WORK - WARM TROPICAL RAIN WITH AROMA TROPICAL RAIN

890

890
CWS01 - 2 x 3/4"COLD WATER SUPPLY FOR KNEIPP SHOWERS AT 2 BAR AT 3.0M THE SAUNA IS BUILT ON THE TOP OF THE FINISHES - ILLUMINATION : RED
R 78
0 R2 FROM FFL. KNEIPP SHOWER TO BE FLUSHED AND DRAINED BEFORE FLOOR. THERE IS NO MECHANICAL FIXINGS TO THE FLOOR. - SOUND : BIRD TWEETING
00 00 R 780 WET LOUNGE STEAM ROOM
R2 SPA OPENS AND AFTER CLOSING EACH DAY.
LD01 TEMP = 40°C - 47°C COLD FOG Makkah
THE FLOOR INSIDE THE SAUNA MUST BE TILED ABSOLUTELY LEVEL. GROUTED PROGRAMME 2: (BUTTON-COLD FOG)
PANIC HUMIDITY = 100% - COLD FOG SHOWER
CWS02 - 3/4"COLD WATER SUPPLY FOR STEAM GENERATOR AT 2 BAR AT 500MM AND SEALED BEFORE THE INSTALLATION OF THE SAUNA BY MAIN
BUTTON AIR CHANGE QUANTITY: - ILLUMINATION : BLUE N
2x KNEIPP SHOWER FROM FFL ON WALL WITH CORNER VALVE CONTRACTOR.
=96-168m3/hr. - SOUND : WAVES AND SEA WATERFALL
(TYPE TBC BY ID) TS01 CABIN VOLUME = 24m3
580 580 VENTILATION - STEAM ROOM ALL FLOOR TILES COMING TOWARDS THE SAUNA ENTRANCE MUST SLOPE
2960

2960
AWAY FROM THE ENTRANCE TO ENSURE NO EGRESS OF WATER INTO THE PROGRAMME 3: (BUTTON-WATERFALL)
LD02a LD02b - TWO WARM WATERFALL

1490
WET LOUNGE 80mm THK EPS WALL FRESH AIR FROM THE PLANT ROOM IS EXTRACTED INTO THE STEAM ROOM CABIN (BY FIT OUT CONTRACTOR) CARRIBEAN STORM
WALLS + BENCH + FLOOR STEAM ROOM - ILLUMINATION : GREEN
ELECTRICALLY HEATED WITH A FAN THROUGH THE STEAM INLET. THEREFORE FRESH AIR SUPPLY WITH
FINISH AS PER ID DESIGN - SOUND : ALPINE CREEK
BENCH WITH BACK REST POSITIVE PRESSURE IN THE PLANT ROOM IS REQUIRED. MAX PLANT ROOM FINISHES
CONDENSATE DRAIN FG01 TEMPERATURE IS 25C. HUMIDITY MAX 65%.
POINT WITH COVER U/B LED STRIP LIGHT BENCH - THERMO ASPEN WOOD WITH SUPIWAX (TBC BY ID) PROGRAMME 4: CARRIBEAN STORM (BUTTON-CARRIBEAN STROM)
STEP 1:
0

R2

AIR OUTLET TO THE ATMOSPHERE OR TO CUSTOMER SUPPLIED VENTILATION WALL - THERMO ASPEN WOOD WITH SUPIMAX (TBC BY ID)
20

00
R

SYSTEM IS PROVIDED. AIR QUANTITY 4-7AIR CHANGES [96-168M³/HR] CEILING - THERMO ASPEN WOOD WITH SUPIMAX (TBC BY ID) - WARM WATERFALLS
FLOOR - FINISH SPECIFICATION BY ID DESIGN - ILLUMINATION : GREEN
0

R 78
R 78

SPA CONTRACTOR WILL PROVIDE THE FAN+CONTROLS AND THE AIR OUTLET - SOUND : ALPINE CREEK
0

580
PODIUM TYPE STEAM INLET STEP 2:
PIPE (PVC 110MM) UP TO THE PLANT ROOM FROM THERE TO ATMOSPHERE BY
THE CUSTOMER. RECOMMEND MOTORIZED OR MANUAL DAMPER ON THE HVAC - WARM TROPICAL RAIN AROMA
42mm STEAM INLET PIPE FROM - ILLUMINATION : FLASHLIGHT
EXTRACT DUCT TO ENSURE CORRECT FLOW IS MAINTAINED AS STATED. NOTE:
PLANT ROOM TO STEAM ROOM HIGH - SOUND : ROLL OF THUNDERSTORM
110mm FRESH AIR PIPE FROM RECOMMENDED ST/ST OR PLASTIC DUCTING IS USED, BECAUSE THE AIR FROM SUPIWAX PROTECTION REQUIRED FOR ALL WOOD
LEVEL STEAM PIPE TO HAVE FIBER STEP 3:
PLANT ROOM TO STEAM ROOM THE STEAM ROOM HAS 100% HUMIDITY AND AROMA (BY MEP CONTRACTOR)
GLASS INSULATION FROM STEAM - WARM WATERFALLS + COLD FOG SHOWER
GENERATOR TO STEAM ROOM - ILLUMINATION BLUE-GREEN COLOUR CHANGE,
WATERPROOFING
- SOUND : ALPINE CREEK
3590 1ST LAYER FLOOR WATERPROOFING BY CIVIL/STRUCTURAL/FACADE &
WATERPROOFING CONTRACTOR.
2ND LAYER FLOOR WATERPROOF BY SPA CONTRACTOR + WALLS AND WET LOUNGE ICE FOUNTAIN REQUIREMENTS
4040
BENCHES WATERPROOFING BY SPA CONTRACTOR.
TYPE - DRY ASK (WATERPROOFING) + DRY DB (SEALING TAPE) POWER SUPPLY

FINISHES THE MEP CONTRACTOR IS REQUIRED TO SUPPLY THE FOLLOWING CABLE INTO
THE SPA CONTRACTOR CONTROL PANEL
WEIGHT OF ADHESIVE AND FINISH ON WALLS MUST NOT EXCEED 50KG/m².
CP01 - 3+N+PE X 200A ISOLATOR TO CONTROL PANEL SHOULD BE PROVIDED BY
WALL, FLOOR AND BENCH FINISH SPECIFICATION BY ID DESIGN. MEP CONTRACTOR IN PLANT ROOM (COMBINED WITH STEAM, SAUNA
ELECTRICAL CABLE TRUNKING AND EXPERIENCE SHOWER)
CEILING - PLASTER & WATERPROOF PAINT STIPPLE EFFECT CEILING FINISH TO
MINIMIZE LARGE WATER DROPLETS BY SPA CONTRACTOR DRAINAGE

ALL DRAINAGE POINTS TO BE PROVIDED BY THE MEP CONTRACTOR ALL POINTS Spa Consultant
TO HAVE SUITABLE TRAPS FITTED FOR CONNECTION OF WASTE WATER
ESU01 FAF01 PIPEWORK.

FD03 - DN40 FIXED DRAIN CONNECTION A ICE FOUNTAIN AT FLOOR


EAF03 THIS IS COMBINED LOAD FOR ALL WET
SC01
LOUNGE SPA THERMAL CABINS, AND IS NOT FD04 - DN40 FIXED DRAIN CONNECTION AT ICE MACHINE IN CEILING VOID
TO BE ADDED TO ELECTRICAL LOADING PLANT
SC02 & SC03 EAF01 EQUIPMENT ITEM. FG03 - FLOOR DRAIN WITH SMELL TRAP AND 1% SLOPE IN FRONT OF THE ICE Executive Architect/ AOR
FOUNTAIN. Licence number - 1010348048
EAF02
WET LOUNGE PLANT ROOM ID
FD01 NOTE: LIGHT TYPE, QUANTITY & LOCATION WATER SUPPLIES Riyadh11481,KSA King Abdul Aziz
ID PLANT IDENTIFICATION KW TO FOLLOW AS PER LIGHTING District,Salah Al Din Al Ayobi Road
SG01 CONSULTANT. LIGHTS SHOWING IN T +966 11 477 8384
FG02 CP01 SPA CONTROL PANEL (COMBINED) 82 DRAWING INDICATIVE ONLY. F +966 11 477 9793
P01 CWS04 - FOR ICE PRODUCTION 3/4" COLD WATER SUPPLY MAX. 35°C. IN CEILING
Riyadh@khatibalami.com www.khatibalami.com
SG01 STEAM GENERATOR (OMEGA PRO 24) - (STEAM ROOM) 18.2 VOID LOCATED TO ICE MACHINE
CWS02 WET LOUNGE & Signature/Design Architect
HAMMAM PLANT CP04 P01 ESSENCE DOSING PUMP (STEAM ROOM) 0.05 NOTE: STEAM ROOM SUPPLY AND EXTRACT
AIR FLOW VOLUME : 830m³/hr
WS01 ROOM FANS / ESSENCE DOSING / TEMPERATURE
WS01 WATER SOFTENER (STEAM ROOM) N/A SENSOR / EMERGENCY STOP. TO BE
FINISHES Riverside, 22 Hester Road © Foster + Partners 2020
63A ISOLATOR BY TS01 TEMPERATURE SENSOR (STEAM ROOM) 0.05 CONTROLLED VIA PLC WITH
London SW11 4AN
ELECTRICAL CONTROL PANEL.
SGC01 MEP CONTRACTOR ICE FOUNTAIN PEDESTAL AND ICE CHUTE COVERING FINISH SPECIFICATION BY T +44(0)20 7738 0455
VENTILATION REQUIREMENTS IN PLANT SSG01 STARRY SKY GENERATOR (STEAM ROOM) 0.8 F +44(0)20 7738 1107
ID DESIGN.
ROO 4 TIMES AIR CHANGES PER HOUR. ELECTRICAL CABLE london@fosterandpartners.com www.fosterandpartners.com
SGD01 SGC01 STEAM GENERATOR CONTROLLER (STEAM ROOM) 0.05 SPA CONTRACTOR TO PROVIDE LIGHTING
TEMPERATURE REQUIRED NO HIGHER THAN TRUNKING IN LINE WITH THE LATEST TRSDC LIGHTING Client
25°C, HUMIDITY NO HIGHER THAN 65% SGD01 STEAM GENERATOR DISPLAY (STEAM ROOM) 0.05 DESIGN GUIDLINES AND DARK SKY
WHU01 FAF01 FRESH AIR FAN (STEAM ROOM) 0.05 GUIDELINES R00-00F51-CDL-RPT-SL-0037
CP01
EAF01 EXTRACT AIR FAN (STEAM ROOM) 0.05
NOTE: FLOOR + LINEAR
# HEATING CABLE - HEATED BENCH (STEAM ROOM) 1.9 DRAINS ARE NOT INCLUDED
200A ISOLATOR BY CWS13a
IN SPA CONTRACTOR SCOPE.
MEP CONTRACTOR SH01 2 x SAUNA HEATER - (46U XL15.0KW) (SAUNA) 30
Project
MANIFOLD SH02 2 x SAUNA HEATER - (46U 12.0KW) (SAUNA) 24 NOTE: SEE ID SCHEDULE
12 PARTS TS02 TEMPERATURE SENSOR (SAUNA) 0.05
FOR FINISHES. SHURAYRAH ISLAND
CABLETRAY FOR WARM SS01 SAFETY SENSOR (SAUNA) 0.05
PROGRAM 8
WATER HEATING PIPES
EAF02 EXTRACT AIR FAN (SAUNA) 0.05
HOTEL EAST 01
EAF03 EXTRACT AIR FAN (SAUNA) 0.05
Drawing Title
SC01 SAUNA CONTROLLER - ECON D4 (SAUNA) 0.05
WET LOUNGE
SC02 POWER EXTENSION FOR SC01 - LSG 36 (SAUNA) 0.05 GENERAL ARRANGEMENT
SC03 POWER EXTENSION FOR SC01 - LSG 36 (SAUNA) 0.05
ESU01 EXPERIENCE SHOWER CONTROL UNIT 0.10
IM01 ICE MACHINE (ICE FOUNTAIN) 2.1
Model File Reference
R08-HE1D07-BAR-15-ZZ-MOD-SP-90001
Drawn By Checked By Approved By
Plan View (Wet Lounge GA)
1 1 : 25 MBA GB JMC
Project No Issue Date Scale at ISO A0

HE1D07 05/21/23 As indicated


Drawing Number Revision
0.5 m 0 0.5 1.0 m
R08-HE1D07-BAR-15-GF-DWG-SP-12001 02

You might also like