Professional Documents
Culture Documents
Сonclusion
Сonclusion
As a result of the diagnosis and inspection of the 2x ATL FUEL CELL, mechanical damage in
WORK the form of deep scratches was found.
DESCRIPTION
At the same time, ATL FUEL CELL is technically new
ADDITIONAL ATL FUEL ELEMENT parts require painting, which will violate the integrity of the new
COMMENTS product, or need to be replaced
SERVICE & LABOR DESCRIPTION HOURS RATE AMOUNT
Diagnostics 1.20 $ 0.0 $ 0.0
Wizard works $ 30.0 $ 0.0
$ $
$ $
$ $
$ $
LABOR TOTAL $ 0.0
PARTS & MATERIALS DESCRIPTION QUANTITY PRICE PER UNIT AMOUNT
Paints and varnishes $ 98.50 $ 0.0
$ $
$ $
$ $
$ $
$ $
MATERIAL TOTAL
WORK ORDER
Jeff Metersen
COMPILED BY
APPROVING
PARTY
SIGNATURE
DATE OF
02/25/2021
APPROVAL