November 2023

James Dealtry-Smith
Senior Associate
Leonard Design Architects
We are Leonard Design Architects

We listen, create and articulate to shape


inspiring, responsive and experience
led places where people want to
be. We support our clients along the
collaborative design journey from
concept to delivery and beyond. We
work globally, regionally and locally.

Established in 2006, Leonard Design deliver award-


winning projects ranging from £1m to 350m including
bespoke commercial units, major new build, mixed-use
regeneration and bespoke interior design. We have
been helping drive the change in our town centres,
working with developers, entrepreneurs, brands, funds,
authorities and stakeholders to create modern, exciting,
experience-led environments.

Leonard Design has a wealth of experience in


completing large, international projects that combine
retail, residential and business requirements. Through
this knowledge, the Leonard Design team is adept at
navigating the complexities of these schemes, ensuring
only practical and deliverable projects are put forward.

Celebrating Five Years in the AJ100


Company Award. Published annually since 1995, the
AJ100 ranks the largest architectural practices in the
UK. It is largely regarded as a key measure of success
and the industry’s most authoritative list.

We are an AJ100 Practice Talented People Offices Countries Worked In Approximate Turnover

90 05 30+ £7m
02 Leonard Design Architects - Projects Summary
Recent Track Record
Grosvenor House (Completed)
Sheffield, UK
Type Of Project RIBA Stages 1-7 We were involved through all RIBA stages bringing a new level of inner offices to Sheffield. The main elements of the project brief derive from the requirements of a large UK
Office & Retail Lead Designer/Architect financial institution, who will be the main occupier of the office space. The building provides 150,000 sq ft of modern office space with ancillary functions across four office
Size floor plates, with good levels of natural daylight. It is located close to the existing commercial office core of the city with the main entrance well positioned on a key city street
160,000 sq ft intersection. The remainder of the street frontage will be activated through retail and leisure uses. The building has a basement service area with limited off-street car parking. The
Contractor / Contract design has been created to make a strong positive architectural statement within the city.
BAM
Two stage Design & Build
Value The project was delivered via a two stage Design and Build procurement route which saw us novated to main contractor BAM Construction. We took a highly collaborative
£65 million (approx) approach with BAM and the rest of the design and construction team to successfully deliver the project. This working relationship has seen BAM partner with us on two of their
Client
recently successful framework bids.
Sheffield City Council
Completion
January 2019

Laycock House (Completed)


Sheffield, UK
Type Of Project RIBA Stages 1-7 Laycock House will form the next phase of the Heart of the City II Masterplan and build upon the success of the first phase, Grosvenor House. Located at the edge of the
Residential Lead Designer/Architect city centre conservation area, they will transform the surrounding area into a dynamic and mixed-use district, whilst respecting some of Sheffield’s key historic buildings and
Size streetscapes.
70,000 sq ft
Contractor / Contract ‘Laycock House’ is one such asset, and forms part of a prominent late Victorian Townscape along Pinstone Street to the east and Charles Street to the west. It will be sensitively
Galliford Try refurbished and integrated into the development with its historic retail frontages and townhouses refurbished whilst improving access.
Two Stage Design & Build
Value The new build elements will include up to four retail and food and beverage units at ground level and 52 (studio, 1, 2 and 3 bedroom) apartments arranged over the 7 levels above
£35 million (approx)
in ‘Burgess House’. The scheme also includes a striking 3 storey boutique office at the corner of Pinstone Street which will be known as ‘Athol House’. It will be accessed via an
Client
Sheffield City Council
enhanced shared courtyard facing Cross Burgess Street
Completion
June 2022

Isaac’s House (Completed)


Sheffield, UK
Type Of Project RIBA Stages 1-7 Isaacs House, along with Block B will form the next phase of the Heart of the City II Masterplan and build upon the success of the first phase, Grosvenor House. Located at the
Office & Retail Lead Designer/Architect edge of the city centre conservation area, they will transform the surrounding area into a dynamic and mixed-use district whilst respecting some of Sheffield’s key historic buildings
Size and streetscapes.
65,000 sq ft
Contractor / Contract The proposal retains and integrates the historic late Victorian Pinstone Street façade, whilst creating a high quality 65,000 sqft redevelopment of new, grade A offices above five
Galliford Try ground level retail units. The new development steps from four to eight storeys to respect the scale and context of the historic Pinstone Street townscape.
Two Stage Design & Build
Value
£30 million (approx)
Client
Sheffield City Council
Completion
June 2022

Lower Parliament Street (On-site)


Nottingham, UK
Type Of Project RIBA Stages 1-7 Further to the below Sneinton Market project, Leonard Design were appointed by iQ Student Accommodation to design a purpose built student accommodation (PBSA) facility
Student Residential Lead Designer/Architect opposite the Arena front Lower Parliament Street. The PBSA provided a total of 215 student beds across 6 levels of accommodation with communal and independent F&B offering
Size on the Ground Floor.
55,000 sq ft
Contractor / Contract Use of materials have been considered, with brick being the preferred facade option to ensure longevity and a quality finish, whilst also remaining in keeping with the surrounding
Galliford Try context. Leonard Design were novated to contractor, Galliford Tr,y to deliver the scheme which is on course to be delivered for the September ’23 student intake.
Single Stage Design & Build
Value
£20 million (approx)
Client
iQ Student Accommodation
Completion
July 2023

03 Leonard Design Architects - Projects Summary


Track Record
Waterside Apartments (Completed)
Nottingham, UK
Type Of Project RIBA Stages 1-7 121 high end apartments including the reuse of an existing iconic building situated in a prominent location on the River Trent. We utilised the view of the River Trent and orientated
Residential & Commercial Lead Designer/Architect each of the apartments, so they all had a river view. This meant that all of the 121 apartments could share the same living experience regardless of unit type.
Size
1.45 Acres (0.59 hectares) Leonard Design Architects were engaged by the client to deliver RIBA stages 1-4. The project gained planning consent by delegated powers without the need for planning
Contractor / Contract committee which for a scheme of this size and nature is extremely rare.
JA Ball
Two stage Design & Build Leonard Design Architects were novated across to JA Ball and engaged to deliver RIBA stages 4-7 – full construction co-ordination through to completion.
Value Leonard Design Architects were also signed up to deliver interior design concept layouts and finishes for all apartment types and communal areas.
£25 million (approx)
Client
Harmony Bridge
Completion
June 2020

Waltham Cross (On-site)


Sheffield, UK
Type Of Project RIBA Stages 1-7 Sunset Waltham Cross Studios, a new 21-stage film complex has received planning committee approval to develop a world-class facility. It is a huge honour for Leonard Design to
Leisure, Office & Commercial Lead Designer/ work with the amazing teams at Blackstone, Hudson Pacific and Sunset Studios.
Size Architect
1.2m sq ft This project marks the first Sunset Studios operation outside of the US, where the owners, funds managed by Blackstone and Hudson Pacific Properties, a unique provider of
@mikebeardphoto
Contractor / Contract end-to-end real estate solutions for tech and media tenants – run four studios. The 91-acre site is to be transformed into a state-of-the-art, 1.2 million square-foot film & tv studio
ISG
complex. With a total of 21 sound stages, workshops, mill space, production offices and support space the scheme will be one of the UK’s largest film and television production
Two Stage Design & Build
locations.
Value
£700 million (approx) The aspirational scheme is also setting the bar for green credentials, targeting a LEED Gold certification and BREEAM Excellent rating. With energy efficiency and biodiversity
Client central to its design, the new film studio will give productions an opportunity to lower their carbon impact.
Sunset Studios
Completion Once complete the Studios will significantly benefit the community, anticipated to create over 4,800 jobs and contribute more than £300 million annually to the local economy.
2025 Preliminary site works are due to start later this year with a target of a 2025 opening date

Beeston Social (Completed)


Nottingham, UK
Type Of Project RIBA Stages 1-7 Fletcher Gate Industries, the creative minds behind Magic Garden, Penny Lane and Hockley Arts Club, had a vision of bringing the buzz back to the night-time economy of
Leisure Mixed-use Lead Designer/ Beeston Town Centre. Our challenge was to design a space which delivered this vision whilst creating an environment and offer that will become the heart of a diverse local
Size Interior Design community.
9,365 sq ft
Contractor / Contract The project is located within a commercial shell unit designed by Leonard Design Architects for Broxtowe Borough Council as part of the wider mixed-use town centre revitalisation
Bowmer & Kirkland project. A coffee shop, two bars, kitchen, lounge seating, DJ booth, games arcade and mezzanine bar provide day-to-night amenity. Taking influence from mid-century modern
Design & Build
design, the interior features teak panelling, retro concrete blocks, quarry tiles, textured finishes, graphic artwork, and real planting to create a relaxed welcoming atmosphere that
Value
appeals to a diverse local community. Flexible lounge spaces with loose furniture and mobile shelving dividers allow the space to be reconfigured to suit a range of scenarios
£1 million (approx)
Client and evolve over time. The design utilises the split level shell to create a screened mezzanine bar that can open/ close to meet peaks in demand and provide private hire space. A
Broxtowe Borough Council double height, floor to ceiling, operable glazed facades opens up to connect to the developments new high quality hard and soft landscaping which creates a vibrant setting for
Completion outdoor dining and drinks, forming a new arrival point to the town centre.
June 2022

The Light (Completed)


Banbury, UK
Type Of Project RIBA Stages 1-7 The latest offer 51k ft² premium cinema-centric leisure offer by The Light opened at the Castle Quay Waterfront Banbury, Oxfordshire. The scheme comprises a restaurant, bar,
Cinema. Leisure & F&B Lead Designer/ arcade, 10 lane bowling alley, pool hall, interactive darts, mini-golf course, karaoke club, climbing center outdoor dining terrace and a 7-screen cinema complex.
Size Interior Design
55,000 sq ft The Light Cinema’s UPS revolves around an exclusive customer experience which is evident through the premium seating in the cinema auditoriums while offering a variety of high-
Contract end food offer in various restaurant and concession areas.
Single Stage Design & Build
Value
£3.5 million (approx)
Client
The Light Cinema
Completion
June 2022

04 Leonard Design Architects - Projects Summary


77 Talbot Street

Architect: Leonard Design Architects


Client: McLaren Property
Contractor: McLaren Construction
Structural Engineer: Howard Ward Associates
M&E: Chord Consult
Project Manager: Pulse Consult

05 Leonard Design Architects - Projects Summary


77 Talbot Street

The proposed scheme has undergone several iterations of design evolution over the pre-application consultation. During the
consultation period several clear design principles emerged. The current team had also taken into account the advice from the
previous Associated Architects scheme to inform the design of the final proposal.
The design principles that informed the design development are:

Demolition of the existing D&G building. Reuse of the existing building for student accommodation has been
assessed and deemed unworkable and inefficient.

Improve the environment of the conservation area with a high


quality and sustainable new building.

Respect the building heights of neighboring developments along Talbot St and Wollaton St. Upper floors to be
set back in line with adjacent Sandhills and Nova student developments.

Maximize daylight opportunity into the courtyard to Nova development with a clear physical break between the
façade along Wollaton St.

Spilt Talbot St and Wollaton St frontages to be more sympathetic to the pattern along the streets.

Ensure the views of the site are respectful of the heritage buildings on Derby Road.

Create entrances along Talbot St and Wollaton St.

Consider adaptability of current scheme for future use.

06 Leonard Design Architects - Projects Summary


77 Talbot Street

Key items:

7 Storeys on Talbot Street & 9 levels on Wollaton Street

The building is over 18m so Regulation 7 is applicable

The building is a RC frame, with SFS and full brick facade

The are 3 cores, one serving the lower to levels and then 2 cores serving the remaining levels

Mix of studios and cluster bedrooms with associated communal space

07 Leonard Design Architects - Projects Summary


77 Talbot Street
Dimensions to be verified on site.
Use figured dimensions only. Do not work from reduced scale drawings.
Please refer to scale and sheet size as indicated.

This drawing is the property of LEONARD DESIGN ARCHITECTS LTD. 

Copyright is reserved by them and the drawing is issued on the condition that it
is not copied, reproduced, retained or disclosed to any unauthorised person
without the prior consent in writing of Leonard Design Architects Ltd. All rights
reserved.
DO NOT SCALE

Orientation

1 2 3 4 5 6 7 8 9 10 11 12

31 100 22 050 26 051


Key Plan

1 1 1
44045 1
N 340183299 1 Key
21 001
E 456625934 21 004
3020 5075 2560 2830 5645 5630 5655 2790 2590 5075 3175
1200
Measured from face of structure
A
1000

1000
1
B 1200
Measured from finish face
22 056

Structural element
(awaiting updates)

Pipe 'from above'


6015

6015
(FA)
300 RWP Rain water pipe
31 105 1 Core 3
RWP 4E
13.9 m²
RWP 6C M&ERWO Rain water
CO-ORDINATION outlet
NOTES
RWP 6A 1.CONFIRMATION
DR REQUIRED
Dry riser FROM MCL FOR
OPEN RISERS
22 055 1 MECH. SS Mechanical smoke shaft

WG-ID001
C

1277
Flat 1 Cluster Corridor

1234
1305

1305
WG-ID038 RWP 4D WG-ID039 15.9 m²
DR 1A WG-ID041 WG-ID046 WG-ID047 WG-ID052
D 1
RWP 2A
Main Corridor
WG-ID040
WG-ID042 WG-ID045 WG-ID048 WG-ID051 D
21 020 38.8 m²
RWP 8
DR ABOVE RED HATCH = SURVEY POINTS OF NOVA
WG-ID043 WG-ID044 WG-ID049 WG-ID050
65000 WALL BY MCL

2140
Lift 1A
66320 RWP
RWP 7A 7 (FA) 1 22 054
ABOVE
Tank Room RWP 9

200
33.3 m² Flat 1 KLD
WG-ID008
5865

5865
1 N 340170724 WG-ID037 RISER 48.8 m² Flat 1 - Room 1 Flat 1 - Room 2 Flat 1 - Room 3 Flat 1 - Room 4 1 31 104
E 456626252 1510 13.3 m² 13.5 m² 13.4 m² 13.5 m²
Store 1.
66320

2144
21 003 Retaining
wall below 3.8 m²
24806

WG-ID036 RISER 2
RAILING
WG-ID009 90 010
WG-ID004
65000

1337
RWP 10
WG-ID007
E

1286
WG-ID003
PLATFORM

300
1509 RWP
LIFT Communal Kitchen
RWP 25 Retaining ABOVE
1560
2150

2150
47.2 m²
N 340166471 wall below

Difference
E 456626149 WG-ID006
RWP 11 WG-ID005 65000

CIRCUIT
WASHER

STACK
DRYER
Cycle Store
40.3 m²
Double stacked bike
storage for 62 bikes 66320 F
CIRCUIT
WASHER

STACK
DRYER

Difference
WG-ED008 RWO 26 RWO 27
Laundry 300
RWP 24
2
2250

2250
14.2 m²
CIRCUIT
WASHER

STACK
DRYER

DIS WC
6.1 m² 21 002
248 Landscaped
STACK

1 WG-ID002
DRYER WASHER DRYER
WASHER CIRCUIT CIRCUIT
CIRCUIT

G 21 005
WG-ID010
Landscaped Courtyard
G Courtyard

151.5 m²
WG-ID011
Retaining RWP 12A RWP

40394
RWP 24A wall below ABOVE
WG-ED001

RWP 22 This drawing is still undergoing Structural and


66320 The Den
M&E co-ordination - internal wall details,
6221

68.3 m²
Retaining especially on upper levels, still need fine tuning
wall below RWP 21A
in line with recent Structural and M&E
RWP 23 RWP 13A coordination

65000 RWP
ABOVE WG-ID014
Sub-Station
Gym MECH. Lift 125
83.9 m² S.S 2

t
(FF)

shaf
1600
RWP 19A

rnal
WG-ID016 1810 Flat 2 - Room 1

inte
inte 14.1 m²
WG-ED007 rnal
Gaming shaf
t Main Corridor
Booth WG-ID015
5748
65000 41.3 m²
Flat 2 - Room 2
RWP
RWP 18A 14.1 m²
H P03 13/10/23 Coordination updates EN JDS

CAPE
Automatic ABOVE RWP 14
RWP Flat 2 - Room 3 P02 17/08/23 For Information EN LH
opening DR 2
ABOVE 13.9 m² P01 16/11/22 Issue for Tender LH JDS

/ ES
door
WG-ID017
WG-ID020 Rev. Date Revision By Checked

ANCE
4220
Entertainment Room Cluster Corridor
RWP 20 Cycle Store 2.9 m²
13
19.7 m²

ENTR
Ref
leonard design architects
44.8 m² WG-ID019
WG-ID023

21809
WG-ID018
11 WG-ID021
RWP 15
4th floor, Albion House
5275 WG-ID022

T
SHAF
16 010 Double stacked bike WG-ID026 5-13 Canal Street
14 storage for 66 bikes
Flat 2 Cluster Corridor
11.8 m² WG-ID024 Existing
Nottingham. NG1 7EG. United Kingdom

OKE
WG-ID034
WG-ID025
retaining wall t. +44 (0) 115 945 0080

AL SM

5735
WG-ID033 WG-ID027 e. office@leonarddesignarchitects.com
5275 WG-ID031
WG-ID030
IC

15 Client
HAN

RWP 17
WG-ID032 WG-ID028
McLaren
MEC

RWP 16
12
5275
Flat 2 KLD
28.7 m² WG-ID029
J
16 4672
2 Project
Unco

WO 16 010
Flat 2 - Room 5
Spac vered
e 77 Talbot Street,
LLA 4875 13.4 m²

TON 1 17
STR
Flat 2 - Room 4
1 15.4 m²
EET

or
erat
5275 Drawing Title

Gen
22 051 1 18 GA Wollaton St Ground

7410
31 101 90 011 4
26 035 WG-ED002
Floor Plan
5565
2
21 001
19
4 Project Number Suitability
1430 S2
26 033 5214
Drawn by Checked by
1 20 L LH JDS
21 002 Scale @A1 Date
As indicated 07/19/22
File Identifier Revision

TAL - LDA - XX - WG - DR - A - 20 010 P03


Purpose of Issue
Wollaton St Ground - GA Plan
1 : 100
STAGE APPROVAL
Project Status
1:100 0m 1m 2m 4m 6m 8m 10m
STAGE 4
08 Leonard Design Architects - Projects Summary
1:1 0mm 10mm 20mm 40mm 60mm 80mm 100mm
77 Talbot Street
Dimensions to be verified on site.
Use figured dimensions only. Do not work from reduced scale drawings.
Please refer to scale and sheet size as indicated.

This drawing is the property of LEONARD DESIGN ARCHITECTS LTD. 

Copyright is reserved by them and the drawing is issued on the condition that it
is not copied, reproduced, retained or disclosed to any unauthorised person
without the prior consent in writing of Leonard Design Architects Ltd. All rights
reserved.
DO NOT SCALE

Orientation

1 2 3 4 5 6 7 8 9 10 11 12
1 1 2
21 004 2 21 001 21 004
4 31 100 22 050 26 051
90 011 Key Plan
26 032

16 011 1 1 1
44045
8 Key
3020 8 no. sheffield bike hoops5075 2560 2830 26 032 5645 5630 5655 2790 2590 5075 3175
2 1200
Measured from face of structure
A
1000

1000
70925
B 1
00-ED001
B 1200
Measured from finish face
22 056
Meeting Room Study Space Escape Corridor
71300 13.2 m² 33.6 m² 10.1 m²
71300 Flat 13
Structural element
Flat 15
18.1 m²
Flat 14
18.1 m² (awaiting updates)
18.0 m² Flat 16 - Room 3 Flat 16 - Room 4
Flat 16 - Room 2 13.7 m² 14.5 m²
Pipe 'from above'
6015

6015
Flat 16 - Room 1
13.3 m² 13.5 m² (FA)
00-ID002 1.1 (FA) 00-ID013 00-ID012 4 (FA)
1200 RWP Rain water pipe
31 105 1
Social Space 00-ID009 Rain water outlet
95.0 m² Core 3 RWO
Lobby & Amenity 14.0 m²
00-ID003
55.9 m²
00-ID014
DR Dry riser
00-ID017 00-ID020 00-ID024 00-ID027 00-ID030 00-ID033
22 055 1 2 (FA) DR 3 RWP 4E RWP 6C
MECH. SS Mechanical smoke shaft
RWP 6A
00-ID015 00-ID016 00-ID018 00-ID019 00-ID022 00-ID023 00-ID025 00-ID026 00-ID028 00-ID029 00-ID031 00-ID032 00-ID034 C
2740
1305

1305
Cluster Corridor 00-ID021 Flat 16 Cluster Corridor
00-ID010 00-ID048
Core 1 7.1 m² 14.0 m²
00-ID011
D
21.6 m² 00-ID047 00-ID046 00-ID044 00-ID043 00-ID041 00-ID040 00-ID039 00-ID037 00-ID035
1
Main Corridor RWP 4D
RWP 2A 3 (FA)
21 020 48.9 m² DR 1 MECH.
WC SS 00-ID045 00-ID042 00-ID038 00-ID036
RWP 3A 3.8 m²
00-ID008 Lift 1A
71300 RWP 7 1 22 054
00-ID004 RWP 8 Flat 16 KLD
MECH. 35.8 m²
RWP 9 SS
00-ID005
Reception Parcel Store
5865

5865
1 23.8 m² 00-ID117 RISER Flat 16 - Room 8 Flat 16 - Room 7 Flat 16 - Room 6 Flat 16 - Room 5
1 31 104
13.4 m² 13.4 m² 13.4 m² 14.2 m²
21 003 Office 00-ID007
Lift 1B
24806

00-ID006 (FF) 00-ID049


RISER

00-ID050
00-ID116
00-ID051
00-ID052
Flat 17
18.6 m²
E
00-ED003 00-ID115
RWP 25 RWP 10
2150

2150
Flat 25
00-ID053
20.1 m² 00-ID114

RWP 11 00-ID054
F
[ROOF BELOW]
00-ID113
2
2250

2250
Flat 24 00-ID055
18.4 m² 00-ID112 Flat 18
21 002 00-ID056
1 18.5 m²

G 21 005 00-ID111
G
3 00-ID057 Flat 19
18.5 m²
00-ID058
90 010 RWP 12

40394
Amenity Roof Terrace 00-ID059
81.2 m²
Flat 23
26.7 m² This drawing is still undergoing Structural and
RWP 22 00-ID110
M&E co-ordination - internal wall details,
6221

00-ID107
00-ID060 especially on upper levels, still need fine tuning
Flat 20
20.2 m²
in line with recent Structural and M&E
00-ID061
Flat 22 KLD 00-ID108 RWP 21 RWP 13A coordination
25.5 m² 00-ID105
RWP 23 00-ID109
00-ID104 00-ID062
00-ID106 Flat 22 Cluster Corridor
00-ID102
18.2 m²
00-ID095 MECH. Lift
00-ID101 S.S 2
00-ID103 (FF) 00-ID064
00-ID063
700

00-ID099 Riser

1216
00-ID098
00-ID100
00-ID096
00-ID094 RWP 19
Flat 22 - Room 6 Flat 21 - Room 1
00-ID097 00-ID065 Core 2 14.1 m²
5748 13.3 m² 00-ID092

00-ID093
00-ID091
14.7 m²
RWP 14
Flat 21 - Room 2
14.1 m² H P03 13/10/23 Coordination updates
P02 17/08/23 For Information
EN
EN
JDS
LH
Flat 22 - Room 5 00-ID089 DR 2
13.3 m² 00-ID066 P01 16/11/22 Issue for Tender LH JDS
Flat 21 - Room 3
Flat 22 - Room 4 13.9 m²
4220 00-ID090 Rev. Date Revision By Checked
RWP 20 13.3 m² Flat 21 Cluster Corridor 00-ID068
RWP 18 00-ID088
13
15.3 m²
Flat 22 - Room 3
leonard design architects

0
00-ID067

122
Flat 22 - Room 2

21809
13.4 m² 00-ID071
13.3 m² 00-ID087 00-ID069 RWP 15
4th floor, Albion House
5275 00-ID070
00-ID085 5-13 Canal Street

1
00-ID074
14

125
1220
00-ID084 00-ID072 Nottingham. NG1 7EG. United Kingdom
00-ID086 00-ID073
Flat 22 - Room 1 00-ID082
13.3 m² RWP 16 t. +44 (0) 115 945 0080

5735
Flat 21 KLD 00-ID081 00-ID075
00-ID083
e. office@leonarddesignarchitects.com
5275 28.8 m²
00-ID079

15 RWP 17
00-ID080
00-ID078
Client

Flat 21 - Room 7
00-ID076

J McLaren
00-ID077
5275
12.9 m²

16 4672
2
Flat 21 - Room 6
13.3 m²
Project

4875 Flat 21 - Room 5


77 Talbot Street,
13.3 m²

1 17 Flat 21 - Room 4
13.2 m²
1
5275 Drawing Title
22 051
18 GA Ground Floor Plan

7410
31 101

2 5565

21 001 19
Project Number Suitability
1430 S4
5214
Drawn by Checked by
1 20 L LH JDS
21 002 Scale @A1 Date
As indicated 07/19/22
File Identifier Revision

TAL - LDA - XX - 00 - DR - A - 20 012 P03


Purpose of Issue
Talbot St Ground Floor - GA Plan
1 : 100 STAGE APPROVAL
Project Status
1:100 0m 1m 2m 4m 6m 8m 10m
STAGE 4
09 Leonard Design Architects - Projects Summary
1:1 0mm 10mm 20mm 40mm 60mm 80mm 100mm
77 Talbot Street
Dimensions to be verified on site.

WORK IN PROGRESS
Use figured dimensions only. Do not work from reduced scale drawings.
Please refer to scale and sheet size as indicated.

This drawing is the property of LEONARD DESIGN ARCHITECTS LTD. 

Copyright is reserved by them and the drawing is issued on the condition that it
is not copied, reproduced, retained or disclosed to any unauthorised person
without the prior consent in writing of Leonard Design Architects Ltd. All rights
reserved.
DO NOT SCALE

Orientation

1 2 3 4 5 6 7 8 9 10 11 12

1 1 2
31 100 22 050 26 051
21 004 21 001 21 004 Key Plan

31 050 1 1 1
44045
Key
3020 5075 2560 2830 5645 5630 5655 2790 2590 5075 3175
3 1200
Measured from face of structure
A
1000

1000
RWP 1

B 1200
Measured from finish face
Flat 99
18.1 m²
Flat 92
18.0 m² Flat 93 Flat 94 Flat 97 Flat 98 Structural element
Flat 95 Flat 96
Flat 91 - Room 4 Flat 91 - Room 5 Flat 91 - Room 6 Flat 91 - Room 7 17.9 m² 18.0 m² 18.0 m² 18.0 m² Flat 100 - Room 2 Flat 100 - Room 3 Flat 100 - Room 4
18.0 m² 17.6 m² Flat 100 - Room 1
14.8 m² 13.8 m² 13.8 m² 13.6 m² 13.6 m² 13.7 m² 14.1 m²
13.4 m²
6015

6015
RWP 5
RWP 4
31 105 1

04-ID005 04-ID008 04-ID011 04-ID015 04-ID018 04-ID021 04-ID024 04-ID027 04-ID030 04-ID033 04-ID036 04-ID040 04-ID043 04-ID046 04-ID049
22 055 1

C
04-ID038 RWP 6B RWP 6A
04-ID001 04-ID003 04-ID004 04-ID006 04-ID007 04-ID009 04-ID010 04-ID012 04-ID014 04-ID016 04-ID017 04-ID019 04-ID020 04-ID022 04-ID023 04-ID025 04-ID026 04-ID028 04-ID029 04-ID031 04-ID032 04-ID034 04-ID035 04-ID039 04-ID041 04-ID042 04-ID044 04-ID045 04-ID047 04-ID048 04-ID050
Flat 91 Flat 100 Cluster Corridor
1305

1305
RWP 2 04-ID013 RWP 3 04-ID037
12.4 m² 14.2 m²
04-ID143 04-ID141 04-ID140 04-ID138 04-ID137 04-ID135 04-ID133 04-ID062 04-ID060 04-ID059 04-ID057 04-ID056 04-ID054 04-ID053 04-ID051
D
04-ID134 Main Corridor 04-ID063
1
2 68.7 m²
DR 1
21 022
50 020 Cleaners Cbd Core 1 MECH.

Cleaners Lobby
4.2 m² 04-ID064
04-ID139 04-ID136 13.4 m² SS 04-ID061 04-ID058 04-ID055 04-ID052 GENERAL CO-ORDINATION

2.6 m²
Flat 91 KLD
RWP 7 22 054 EAI 03 - ACC. STUDIO NOW VERY TIGHT WITH
33.6 m² 1
04-ID132 RWP 8 Flat 100 KLD FURNITURE - WILL REQUIRE REMOVAL OF
MECH.
SS
35.9 m² BLADE WALL AT END OF KITCHEN.
RWP 9
5865

5865
1 04-ID144 RISER 1 31 104 WARDROBES NO LONGER FIT AT ENDS OF
Flat 91 - Room 3 Flat 91 - Room 2 Flat 91 - Room 1 Flat 100 - Room 8 Flat 100 - Room 7 Flat 100 - Room 6 Flat 100 - Room 5 BEDS MAKING THEIR NEW LOCATION LESS
21 003 15.7 m² 13.5 m² 13.8 m² Lift 2 04-ID065 13.4 m² 13.5 m² 13.5 m² 14.0 m² THAN IDEAL
24806

(FF)
RISER

04-ID131
04-ID066

Flat 90
04-ID067
04-ID068
Flat 82
18.6 m²
E
25.5 m² RWP 10
2150

2150
04-ID130 04-ID069

RWP 11 04-ID070
F
Flat 89 04-ID128
18.5 m² 2
2250

2250
04-ID071
04-ID129
04-ID072 Flat 83 21 002
18.6 m²
04-ID127
G
04-ID073
Flat 84
04-ID074 18.6 m²
RWP 12

40394
04-ID075

RWP 22 Flat 88 This drawing is undergoing Structural and M&E


26.8 m²
co-ordination and is issued for information
6221

04-ID123 04-ID126
04-ID076 purposes only
04-ID122
04-ID077 RWP 13
04-ID120 Flat 85
RWP 21
20.2 m²
REV: P02
04-ID125
Flat 87 KLD 04-ID119 • Updated layouts to amenity spaces and new
26.7 m² 04-ID121
04-ID117
04-ID078 cluster bedrooms on GL-E
04-ID116 MECH.
04-ID124
S.S
Lift
1 • Updates to wall thickness, SVP/RWP boxing,
04-ID118 Flat 87 Cluster Corridor (FF) 04-ID080
04-ID114 18.2 m² 04-ID079
Riser
sheer wall alignment
04-ID113 • Updates to furniture sizes in bedrooms - note
04-ID115 04-ID111 blue dots where these items are too tight/no
04-ID110
RWP 19 04-ID081 longer fit. Further co-ordination required.
Flat 87 - Room 6 Core 2 Flat 86 - Room 1
04-ID112 04-ID108
5748 14.1 m² 13.2 m² 14.6 m²
Flat 87 - Room 5
13.3 m² 04-ID109
04-ID107
04-ID105
04-ID082 Flat 86 - Room 2
H P02 17/08/23 For Information EN LH
14.1 m²
Flat 87 - Room 4 P01 16/11/22 Issue for Tender LH JDS
Flat 86 Cluster Corridor Flat 86 - Room 3
14.1 m² 04-ID106 RWP 18
4220 16.4 m² 14.0 m² Rev. Date Revision By Checked
DR 2 04-ID084
04-ID104
RWP 20 RWP 14
13
Flat 87 - Room 3
14.2 m² 04-ID083
leonard design architects

21809
04-ID103 04-ID087
04-ID101 04-ID085 4th floor, Albion House
5275 Flat 87 - Room 2 04-ID086
04-ID100 RWP 15 04-ID090 5-13 Canal Street
14 14.2 m²
Flat 87 - Room 1
13.3 m²
04-ID102 04-ID098
04-ID088 Nottingham. NG1 7EG. United Kingdom
04-ID089
Flat 86 KLD
04-ID097 t. +44 (0) 115 945 0080

5735
04-ID091 e. office@leonarddesignarchitects.com
31.7 m² 04-ID099 04-ID095
5275
04-ID094
15 RWP 17
RWP 16
04-ID096 04-ID093
Client

J McLaren
04-ID092
5275 Flat 86 - Room 7

16
13.8 m²
4672 Flat 86 - Room 6 Project
2
13.3 m²

4875 Flat 86 - Room 5


77 Talbot Street,
13.9 m²

1 17 Flat 86 - Room 4
15.4 m²
1
5275 Drawing Title
22 051
18 GA Fourth Floor Plan

7410
31 101

2 5565

21 001 19
Project Number Suitability
1430 S2
5214
Drawn by Checked by
1 20 L LH JDS
21 002 Scale @A1 Date
As indicated 07/19/22
File Identifier Revision

TAL - LDA - XX - 04 - DR - A - 20 016 P02


Purpose of Issue
1 Fourth Floor - GA Plan
1 : 100 INFORMATION
Project Status
1:100 0m 1m 2m 4m 6m 8m 10m
STAGE 4
10 Leonard Design Architects - Projects Summary
1:1 0mm 10mm 20mm 40mm 60mm 80mm 100mm
77 Talbot Street
Dimensions to be verified on site.

WORK IN PROGRESS
Use figured dimensions only. Do not work from reduced scale drawings.
Please refer to scale and sheet size as indicated.

This drawing is the property of LEONARD DESIGN ARCHITECTS LTD. 

Copyright is reserved by them and the drawing is issued on the condition that it
is not copied, reproduced, retained or disclosed to any unauthorised person
without the prior consent in writing of Leonard Design Architects Ltd. All rights
reserved.
DO NOT SCALE

Orientation

1 2 3 4 5 6 7 8 9 10 11 12

1 2
31 100 22 050 26 051 21 001 21 004 Key Plan

1 31 050 1 1 1
44045
21 004 Key
3020 5075 2560 2830 5645 5630 5655 2790 2590 5075 3175
3 1200
Measured from face of structure
A
1000

1000
RWO 1

B 1200
Measured from finish face

Structural element

Flat 144 - Room 4 Flat 144 - Room 5 Flat 144 - Room 6 Flat 144 - Room 7 Flat 145 Flat 146
RWO 5
6015

6015
15.7 m² 13.4 m² 13.7 m² 13.7 m² 19.2 m² 19.2 m²

RWO 4
31 105 1

07-ID005 07-ID008 07-ID012 07-ID015 07-ID018


22 055 1

C
RWP 6B RWP 6A
07-ID001 07-ID002 07-ID004 07-ID006 07-ID007 07-ID00907-ID010 07-ID011 07-ID014 07-ID016 07-ID017 07-ID019
Plant Corridor
1305

1305
RWP 2 07-ID013 07-ID020 3.6 m² 07-ID021 07-ED001
07-ID045
D
07-ID056 07-ID054 07-ID053 07-ID051 07-ID050 07-ID048
1
2
21 022
50 020
Main Corridor DR 1
1. MECH.
STRUCTURAL CO-ORDINATION NOTES
52.4 m²
07-ID052 07-ID049
07-ID022 Core 1 SS 1. RC WALL TO CONTINUE UP AS PER LOWER
07-ID046 13.4 m² ASHP LEVELS?
RWO 7 enclosure 1 22 054
RWO 8
MECH.
Flat 144 KLD
RWP 9 SS
31.9 m²
Mech Plant Room
5865

5865
1
Flat 144 - Room 3 Flat 144 - Room 2 Flat 144 - Room 1 07-ID057
RISER 51.8 m² 1 31 104
15.2 m² 14.0 m² 14.2 m²
21 003 Lift 2
24806

(FF) 07-ID023
RISER
07-ID024

07-ID025
07-ID026
Flat 138
18.2 m² E
RWP 10
2150

2150
Flat 143 07-ID044 07-ID027
25.4 m²
07-ID043

RWO 11

07-ID028
F
2
2250

2250
07-ID029
Flat 139
07-ID030 18.6 m² 21 002

G
07-ID041 07-ID031 Flat 140
18.6 m²
RWP 12 07-ID032

40394
07-ID040
07-ID033

07-ID039
Flat 142 This drawing is undergoing Structural and M&E
22.8 m² co-ordination and is issued for information
6221

07-ID034
purposes only
07-ID035
RWP 13
Flat 141 REV: P02
19.5 m²
• Updated layouts to amenity spaces and new
07-ID036 cluster bedrooms on GL-E
RWO 21
MECH.
S.S
Lift
1 • Updates to wall thickness, SVP/RWP boxing,
07-ED002 (FF)
Riser
sheer wall alignment
• Updates to furniture sizes in bedrooms - note
blue dots where these items are too tight/no
longer fit. Further co-ordination required.
Core 2
RWO 19 16.1 m²
5748
07-ID038 RWP 14
DR 2 H P02 17/08/23 For Information EN LH
RWO 18
UP P01 16/11/22 Issue for Tender LH JDS
4220 Rev. Date Revision By Checked

13 leonard design architects

21809
4th floor, Albion House
5275
5-13 Canal Street
14 Nottingham. NG1 7EG. United Kingdom

t. +44 (0) 115 945 0080

5735
e. office@leonarddesignarchitects.com
5275

15 Client

J McLaren
5275

16 4672
2 Project

4875
77 Talbot Street,
1 17
1
5275 Drawing Title
22 051
18 GA Seventh Floor Plan

7410
31 101

2 5565
21 001
19
Project Number Suitability
1430 S2
5214
Drawn by Checked by
1 20 L LH JDS
21 002 Scale @A1 Date
As indicated 07/19/22
File Identifier Revision

TAL - LDA - XX - 07 - DR - A - 20 019 P02


Purpose of Issue
1 Seventh Floor - GA Plan
1 : 100 INFORMATION
Project Status
1:100 0m 1m 2m 4m 6m 8m 10m
STAGE 4
11 Leonard Design Architects - Projects Summary
1:1 0mm 10mm 20mm 40mm 60mm 80mm 100mm
77 Talbot Street

1. Structure (with a focus on load paths for dead and live loads, and bracing for frames)

2. Enclosure (with a focus on dealing with water- rain, groundwater,


and internal water vapour)

3. Services (the main issue being horizontal & vertical distribution-


allowing enough space!)

4. Sustainability (with a focus on embedded carbon)

5. Regulations (with a focus on fire and accessibility)

6. Performance (with a focus on acoustics


and reducing energy-in-use)

12 Leonard Design Architects - Projects Summary


77 Talbot Street

Structure (with a focus on load paths for dead and live loads, and bracing for frames)

Different types of Structure - Pro’s & Con’s


Bracing
Downstand Beams v’s flat slabs
Slab openings and penetrations
Always aim for vertical alignment
Try to avoid transfer slabs & beams
Educate the client on process; - the importance of SI
Less is more - but not always
Understanding deflection and the impacts

13 Leonard Design Architects - Projects Summary


77 Talbot Street

14 Leonard Design Architects - Projects Summary


77 Talbot Street

15 Leonard Design Architects - Projects Summary


77 Talbot Street

16 Leonard Design Architects - Projects Summary


77 Talbot Street

Enclosure (with a focus on dealing with water- rain, groundwater, and internal water vapour)

Understanding Ground Conditions (SI)


Use the experts
Aim for 2 lines of defence
de-risk wherever possible

17 Leonard Design Architects - Projects Summary


77 Talbot Street

Enclosure (with a focus on dealing with water- rain, groundwater, and internal water vapour)

Understanding Ground Conditions (SI)


Use the experts
Aim for 2 lines of defence
de-risk wherever possible

18 Leonard Design Architects - Projects Summary


77 Talbot Street

19 Leonard Design Architects - Projects Summary


77 Talbot Street

Services (the main issue being horizontal & vertical distribution - allowing enough space!)

Different uses require different services zones


Different frame types will impact on services zones
Floor to Floors should always work to brick dimensions

20 Leonard Design Architects - Projects Summary


77 Talbot Street

Amendment 2: prohibit the routing of electrical services within protected escape routes, unless they are associated

with the route itself (similar to firefighting shafts).

21 Leonard Design Architects - Projects Summary


77 Talbot Street

Sustainability (with a focus on embedded carbon)

Carbon footprint can be used to express the carbon of operating a building, running a car or operating
a laptop, embodied carbon cannot. Embodied carbon would instead tell you the carbon footprint of
constructing the building, producing the car or manufacturing the laptop

22 Leonard Design Architects - Projects Summary


77 Talbot Street

23 Leonard Design Architects - Projects Summary


77 Talbot Street

https://arup-carbon-insights.appspot.com/#/typ-library-buildings

24 Leonard Design Architects - Projects Summary


77 Talbot Street

https://arup-carbon-insights.appspot.com/#/typ-library-buildings

25 Leonard Design Architects - Projects Summary


77 Talbot Street

Regulations (with a focus on fire and accessibility)

12 11 10 9 8 7 6 5 4 3 2 1

Regulation 7
Building Safety Act 7 8 10 12 6 13 7 12 9 3 6 13 3 7 10 6 13 7 8 14 19 11

Building Safety Regulator 1


21 001
3
Golden Thread
1
1 1 4
27 005 22 056 1
27 002 31 051 21 004 22 056

96.26

Roof 1 2
95618 22 056 2
22 056 1
26 030
1 1 19-W13- 5.3 19-W12- 5.3 19-W11- 5.3
27 002 94.15
19-W16- 5.1 27 003 19-W15- 5.1 19-W14- 5.2
31 052

Seventh
1
92900
27 003 2
3000

26 030
3000

18-W28- 6.2 18-W27- 6.2 18-W26- 6.2 18-W23- 5.2


90.84 18-W22- 3.2 18-W21- 3.2 18-W20- 3.2 18-W19- 3.2 18-W18- 7
18-W17- 1 18-W16- 1 18-W15- 1
18-W25- 6.2 18-W24- 12.1

Sixth
1275

89900 2
1
1 26 070
26 070
3000

26 030
2400

87.88 17-W30- 7 17-W29- 3.2 17-W28- 3.2 17-W27- 3.2 17-W26- 7 17-W25- 3.2 17-W24- 3.2 17-W23- 3.2 17-W22- 3.2 17-W21- 7
17-W33- 1 17-W32- 1 17-W31- 1 17-W20- 1 17-W19- 1 17-W18- 1

Fifth
600

86900 2
1 1
26 070 26 070 26 020
3000

2400

16-W32- 7 16-W31- 3.2 16-W30- 3.2 16-W29- 3.2 16-W28- 7 16-W23- 7


16-W35- 1 16-W34- 1 16-W33- 1 16-W27- 1.1 16-W26- 1.1 16-W25- 1.1 16-W24- 1.1 16-W22- 1 16-W21- 1 16-W20- 1

Fourth
600

83900 3
26 031
3000

2400

15-W32- 7 15-W28- 7 15-W27- 3.2 15-W26- 3.2 15-W25- 3.2 15-W24- 3.2 15-W23- 7
15-W35- 1 15-W34- 1 15-W33- 1 15-W31- 1.1 15-W30- 1.1 15-W29- 1.1 15-W22- 1 15-W21- 1 15-W20- 1

Third
600

80900
3000

2400

14-W32- 7 14-W31- 3.2 14-W30- 3.2 14-W29- 3.2 14-W28- 7 14-W23- 7


14-W35- 1 14-W34- 1 14-W33- 1 14-W27- 1.1 14-W26- 1.1 14-W25- 1.1 14-W24- 1.1 14-W22- 1 14-W21- 1 14-W20- 1

Second
600

77900 3
26 032
3000

01-CWW03- L
2400

13-W28- 7 13-W24- 7 13-W23- 3.2 13-W22- 3.2 13-W21- 3.2 13-W20- 3.2
13-W31- 1 13-W30- 1 13-W29- 1 13-W27- 1.1 13-W26- 1.1 13-W25- 1.1 3
Vegetati
26 032
First CW01
74900
900

1
3600

CW02 26 000
12-W18- 5.2 12-W17- 5.2 12-W16- 5.2
2700

12-W22- 3 12-W21- 3 12-W20- 3 12-W19- 7

Talbot St Ground
71300
3150

3150

26 Leonard Design Architects - Projects Summary 1


Talbot St LG 26 032
68150
77 Talbot Street

Regulation 7

External fire spread


B4. (1) The external walls of the building shall adequately resist the spread of fire over the walls and from one
building to another having regard to the height, use and position of the building, achieving a Classification of
A1 or A2-s1

(2) The roof of the building shall adequately resist the spread of fire over the roof and from one building to
another, having regard to the use and position of the building.

27 Leonard Design Architects - Projects Summary


77 Talbot Street
Dimensions to be verified on site.
Use figured dimensions only. Do not work from reduced scale drawings.
Please refer to scale and sheet size as indicated.

This drawing is the property of LEONARD DESIGN ARCHITECTS LTD. 

Copyright is reserved by them and the drawing is issued on the condition that it
is not copied, reproduced, retained or disclosed to any unauthorised person

Performance (with a focus on acoustics and reducing energy-in-use


without the prior consent in writing of Leonard Design Architects Ltd. All rights
reserved.
DO NOT SCALE

Orientation

1 2 3 4 5 6 7 8 9 10 11 12

31 100 22 050 26 051


Key Plan

1 1 1
44045 1
N 340183299 1 Key
21 001
E 456625934 21 004
3020 5075 2560 2830 5645 5630 5655 2790 2590 5075 3175
1200
Measured from face of structure
A
1000

1000
1
B 1200
Measured from finish face
22 056

Structural element
(awaiting updates)

Pipe 'from above'


6015

6015
(FA)
300 RWP Rain water pipe
31 105 1 Core 3
RWP 4E
13.9 m²
RWP 6C M&ERWO Rain water
CO-ORDINATION outlet
NOTES
RWP 6A 1.CONFIRMATION
DR REQUIRED
Dry riser FROM MCL FOR
OPEN RISERS
22 055 1 MECH. SS Mechanical smoke shaft

WG-ID001
C

1277
Flat 1 Cluster Corridor

1234
1305

1305
WG-ID038 RWP 4D WG-ID039 15.9 m²
DR 1A WG-ID041 WG-ID046 WG-ID047 WG-ID052
D 1
RWP 2A
Main Corridor
WG-ID040
WG-ID042 WG-ID045 WG-ID048 WG-ID051 D
21 020 38.8 m²
RWP 8
DR ABOVE RED HATCH = SURVEY POINTS OF NOVA
WG-ID043 WG-ID044 WG-ID049 WG-ID050
65000 WALL BY MCL

2140
Lift 1A
66320 RWP
RWP 7A 7 (FA) 1 22 054
ABOVE
Tank Room RWP 9

200
33.3 m² Flat 1 KLD
WG-ID008
5865

5865
1 N 340170724 WG-ID037 RISER 48.8 m² Flat 1 - Room 1 Flat 1 - Room 2 Flat 1 - Room 3 Flat 1 - Room 4 1 31 104
E 456626252 1510 13.3 m² 13.5 m² 13.4 m² 13.5 m²
Store 1.
66320

2144
21 003 Retaining
wall below 3.8 m²
24806

WG-ID036 RISER 2
RAILING
WG-ID009 90 010
WG-ID004
65000

1337
RWP 10
WG-ID007
E

1286
WG-ID003
PLATFORM

300
1509 RWP
LIFT Communal Kitchen
RWP 25 Retaining ABOVE
1560
2150

2150
47.2 m²
N 340166471 wall below

Difference
E 456626149 WG-ID006
RWP 11 WG-ID005 65000

CIRCUIT
WASHER

STACK
DRYER
Cycle Store
40.3 m²
Double stacked bike
storage for 62 bikes 66320 F
CIRCUIT
WASHER

STACK
DRYER

Difference
WG-ED008 RWO 26 RWO 27
Laundry 300
RWP 24
2
2250

2250
14.2 m²
CIRCUIT
WASHER

STACK
DRYER

DIS WC
6.1 m² 21 002
248 Landscaped
STACK

1 WG-ID002
DRYER WASHER DRYER
WASHER CIRCUIT CIRCUIT
CIRCUIT

G 21 005
WG-ID010
Landscaped Courtyard
G Courtyard

151.5 m²
WG-ID011
Retaining RWP 12A RWP

40394
RWP 24A wall below ABOVE
WG-ED001

RWP 22 This drawing is still undergoing Structural and


66320 The Den
M&E co-ordination - internal wall details,
6221

68.3 m²
Retaining especially on upper levels, still need fine tuning
wall below RWP 21A
in line with recent Structural and M&E
RWP 23 RWP 13A coordination

65000 RWP
ABOVE WG-ID014
Sub-Station
Gym MECH. Lift 125
83.9 m² S.S 2

t
(FF)

shaf
1600
RWP 19A

rnal
WG-ID016 1810 Flat 2 - Room 1

inte
inte 14.1 m²
WG-ED007 rnal
Gaming shaf
t Main Corridor
Booth WG-ID015
5748
65000 41.3 m²
Flat 2 - Room 2
RWP
RWP 18A 14.1 m²
H P03 13/10/23 Coordination updates EN JDS

CAPE
Automatic ABOVE RWP 14
RWP Flat 2 - Room 3 P02 17/08/23 For Information EN LH
opening DR 2
ABOVE 13.9 m² P01 16/11/22 Issue for Tender LH JDS

/ ES
door
WG-ID017
WG-ID020 Rev. Date Revision By Checked

ANCE
4220
Entertainment Room Cluster Corridor
RWP 20 Cycle Store 2.9 m²
13
19.7 m²

ENTR
Ref
leonard design architects
44.8 m² WG-ID019
WG-ID023

21809
WG-ID018
11 WG-ID021
RWP 15
4th floor, Albion House
5275 WG-ID022

T
SHAF
16 010 Double stacked bike WG-ID026 5-13 Canal Street
14 storage for 66 bikes
Flat 2 Cluster Corridor
11.8 m² WG-ID024 Existing
Nottingham. NG1 7EG. United Kingdom

OKE
WG-ID034
WG-ID025
retaining wall t. +44 (0) 115 945 0080

AL SM

5735
WG-ID033 WG-ID027 e. office@leonarddesignarchitects.com
5275 WG-ID031
WG-ID030
IC

15 Client
HAN

RWP 17
WG-ID032 WG-ID028
McLaren
MEC

RWP 16
12
5275
Flat 2 KLD
28.7 m² WG-ID029
J
16 4672
2 Project
Unco

WO 16 010
Flat 2 - Room 5
Spac vered
e 77 Talbot Street,
LLA 4875 13.4 m²

TON 1 17
STR
Flat 2 - Room 4
1 15.4 m²
EET

or
erat
5275 Drawing Title

Gen
22 051 1 18 GA Wollaton St Ground

7410
31 101 90 011 4
26 035 WG-ED002
Floor Plan
5565
2
21 001
19
4 Project Number Suitability
1430 S2
26 033 5214
Drawn by Checked by
1 20 L LH JDS
21 002 Scale @A1 Date
As indicated 07/19/22
File Identifier Revision

TAL - LDA - XX - WG - DR - A - 20 010 P03


Purpose of Issue
Wollaton St Ground - GA Plan
1 : 100
STAGE APPROVAL
Project Status
1:100 0m 1m 2m 4m 6m 8m 10m
STAGE 4
28 Leonard Design Architects - Projects Summary
1:1 0mm 10mm 20mm 40mm 60mm 80mm 100mm
77 Talbot Street

Performance (with a focus on acoustics and reducing energy-in-use)

Regulation 7
Building Safety Act
Building Safety Regulator
Golden Thread

29 Leonard Design Architects - Projects Summary


www.leonard.design

Nottingham UK

Albion House
5-13 Canal Street
Nottingham
NG1 7EG

+44 (0) 115 945 0080

London UK

Baird House
15-17 St Cross Street
London
EC1N 8UW

+44 (0) 207 440 9960

Berlin

2nd Floor
Charlottenstraße 62
10117 Berlin
Germany

Kuala Lumpur

Unit 11-01A
Vida Bukit Ceylon
Jalan Ceylon
50200 Kuala Lumpur

+60 (0)3 2022 2105

Sydney

Level 1, 60 Miller St
North Sydney
NSW 2060

+61 (0) 498 323 080

You might also like