BVI-HSE Daily Report 2023-11-10
INSPECTION
REPORT B&I Department
BV Job No.:
PROJECT: Bogor E-Commerce Hub Date Of Inspection: November 10th, 2023
Description: Description :
On November 10th, 2023 time 09:42 AM while BVI-
HSE Performed daily site inspection, found unsafe
condition the protruding rebar was not cut immediately,
potentially causing someone to be slashed by the rebar
Location: Outbound 2nd floor
Findings 2
Description: Description :
On November 10th, 2023 time 09:43 AM while BVI-
HSE Performed daily site inspection, found unsafe dismantled formwork materials have been taken
condition the dismantled formwork material was not down
taken down immediately, potentially fall down and hit
the workers below
Location: Outbound 1st floor
INSP 001 - Inspection Report rev.0 Page 1 of 3 Copyright Bureau Veritas, December 18th, 2020
DAILY
INSPECTION
REPORT B&I Department
BV Job No.:
Findings 3
Description: Description :
On November 10th, 2023 time 14:55 PM while BVI-
HSE Performed daily site inspection, found unsafe piles of garbage have been picked up
condition many piles of garbage were not removed
immediately
Location: Outbound 1st floor
Findings 4
Description: Description :
On November 10th, 2023 time 15:34 PM while BVI-
HSE Performed daily site inspection, found unsafe
condition temporary power cables were not hung up
properly and were left embedded in the ground
Location: Outbound (Site plan)
INSP 001 - Inspection Report rev.0 Page 2 of 3 Copyright Bureau Veritas, December 18th, 2020
DAILY
INSPECTION
REPORT B&I Department
BV Job No.:
Findings 5
Description: Description :
On November 10th, 2023 time 15:42 PM while BVI-
HSE Performed daily site inspection, found unsafe
condition the protruding rebar was not cut immediately,
potentially causing someone to stumble
Location: Outbound
INSP 001 - Inspection Report rev.0 Page 3 of 3 Copyright Bureau Veritas, December 18th, 2020