DAILY

INSPECTION
REPORT B&I Department
BV Job No.:
PROJECT: Bogor E-Commerce Hub Date Of Inspection: November 10th, 2023

BV Client: PT. Gudang SPE Indonesia Inspector by: Ibnu Awal H


On today, BVI HSE personnel perform HSE Inspection and found the following problems (unsafe act
and/or unsafe condition) which those put into “Pictures of Findings” table below. PT. Pulau Intan is
required to improve those findings and put the closed out’s evidence(s) in the “Pictures of Corrective
Action Taken” column below:

Pictures of Findings Pictures of Corrective Action Taken


Findings 1

Description: Description :
On November 10th, 2023 time 09:42 AM while BVI-
HSE Performed daily site inspection, found unsafe
condition the protruding rebar was not cut immediately,
potentially causing someone to be slashed by the rebar
Location: Outbound 2nd floor

Findings 2

Description: Description :
On November 10th, 2023 time 09:43 AM while BVI-
HSE Performed daily site inspection, found unsafe dismantled formwork materials have been taken
condition the dismantled formwork material was not down
taken down immediately, potentially fall down and hit
the workers below
Location: Outbound 1st floor

INSP 001 - Inspection Report rev.0 Page 1 of 3 Copyright Bureau Veritas, December 18th, 2020
DAILY
INSPECTION
REPORT B&I Department
BV Job No.:
Findings 3

Description: Description :
On November 10th, 2023 time 14:55 PM while BVI-
HSE Performed daily site inspection, found unsafe piles of garbage have been picked up
condition many piles of garbage were not removed
immediately
Location: Outbound 1st floor

Findings 4

Description: Description :
On November 10th, 2023 time 15:34 PM while BVI-
HSE Performed daily site inspection, found unsafe
condition temporary power cables were not hung up
properly and were left embedded in the ground
Location: Outbound (Site plan)

INSP 001 - Inspection Report rev.0 Page 2 of 3 Copyright Bureau Veritas, December 18th, 2020
DAILY
INSPECTION
REPORT B&I Department
BV Job No.:
Findings 5

Description: Description :
On November 10th, 2023 time 15:42 PM while BVI-
HSE Performed daily site inspection, found unsafe
condition the protruding rebar was not cut immediately,
potentially causing someone to stumble
Location: Outbound

INSP 001 - Inspection Report rev.0 Page 3 of 3 Copyright Bureau Veritas, December 18th, 2020