Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

RADIANT CONSTRUCTIO N

MATERIALS TESTING LABORATORY, INC.


DJ’S Commercial Stall Rentals, Brgy. Ambonao, Calasiao, Pangasinan
Contact No.: 09760363322
Email Add.: radiant.testinglaboratory@gmail.com DPWH-BRS Accredited

Field Test No.: FT-08-09-2023-01


Report Date: August 12, 2023
TEST REPORT ON CONFORMITY PULL TEST

Project : Construction of Slope Protection Structure (Rockfall Netting) along Panay East West Lateral Road Iloilo,
with Contract I.D. No. 23GO-0019
Kind of material : 32mmØ Soil Nail
Sample identification : Soil Nail - 1
Tested at : Sta. 1+180.00
Supplied by : Monolithic Construction & Concrete Products,Inc.
Proposed use : Soil Nail Rockfall Protection Works
Governing Spec's : DPWH Government Specifications (Item 522)
Date tested : August 09, 2023
Procedure : DPWH Slope Protection Manual 2019
Strength value (90%
Total time of Actual reading Loading Loading Anchor Bolt Settlement of
of YP, 345 Mpa
testing, (minutes) machine, (Psi) value, kN Cycle Displacement, (mm) Reaction Plate, (mm)
32mmØ), kN
96 176 10 0 61.23
85 352 20 0 72.12
70 528 30 0 75.64
54 704 40 0 76.53
34 880 50 0 77.89
15 1057 60 0 78.31
12 1233 70 0 78.87
9 1409 80 0 79.02
9 1585 90 0 79.54
9 1761 100 0 79.65
9 1938 110 0 79.87
9 2114 120 0 80.10
8 2290 130 0 80.56
8 2466 140 Strength value (90% of 0 80.65
8 2642 150 YP, 345 Mpa 32mmØ),
Single 0 80.71
kN
7 2818 160 0 80.89
254.30
7 2995 170 0 81.23
7 3171 180 0 81.35
6 3347 190 0 81.48
6 3523 200 0 81.52
5 3699 210 0 81.63
5 3876 220 0 81.74
4 4052 230 0 81.88
3 4228 240 0 81.92
3 4404 250 0 91.98
2 4580 260 0 82.05
2 4756 270 0 82.12
2 4993 280 0 82.19
2 5100 289 0 82.21
Note:
Machine Used : ENERPAC RCH-603*, Hollow Plunger Cylinders
Capacity : 10,000 Psi / 60 Tons
Cylinder Effective Area : 82.3 cm²
Nominal Area of Soil Na : 819 mm² (ASTM A615) NOT VALID WITHOUT SEAL

Witnessed by: Tested by: Attested by:


Gladys Ivy V. Tabera
DPWH-Regional Office VI Jeffrey G. Ganaden
Jezreel Flotilde / Gia Marie Gange Rafael Peña Nestor B. Caoile
MCCPI / JJ3 RCMTLI Field Technicians President / ME-II

This certificate is issue in accordance with the requirements of BRS-DPWH and may not be reproduce other than in full, except
with prior written approval of the Radiant Construction Materials Testing Laboratory, Inc.
RADIANT CONSTRUCTIO N
MATERIALS TESTING LABORATORY, INC.
DJ’S Commercial Stall Rentals, Brgy. Ambonao, Calasiao, Pangasinan
Contact No.: 09760363322
Email Add.: radiant.testinglaboratory@gmail.com DPWH-BRS Accredited

Field Test No.: FT-08-09-2023-02


Report Date: August 12, 2023
TEST REPORT ON CONFORMITY PULL TEST

Project : Construction of Slope Protection Structure (Rockfall Netting) along Panay East West Lateral Road Iloilo,
with Contract I.D. No. 23GO-0019
Kind of material : 32mmØ Soil Nail
Sample identification : Soil Nail - 2
Tested at : Sta. 1+200.00
Supplied by : Monolithic Construction & Concrete Products,Inc.
Proposed use : Soil Nail Rockfall Protection Works
Governing Spec's : DPWH Government Specifications (Item 522)
Date tested : August 09, 2023
Procedure : DPWH Slope Protection Manual 2019
Strength value (90%
Total time of Actual reading Loading Loading Anchor Bolt Settlement of
of YP, 345 Mpa
testing, (minutes) machine, (Psi) value, kN Cycle Displacement, (mm) Reaction Plate, (mm)
32mmØ), kN
261 176 10 0 83.65
212 352 20 0 84.56
115 528 30 0 85.24
90 704 40 0 85.35
72 880 50 0 85.42
43 1057 60 0 85.46
17 1233 70 0 85.54
9 1409 80 0 85.62
8 1585 90 0 85.68
8 1761 100 0 85.72
8 1938 110 0 85.76
7 2114 120 0 85.81
7 2290 130 0 85.98
7 2466 140 Strength value (90% of 0 86.12
7 2642 150 YP, 345 Mpa 32mmØ), 0 86.19
Single
kN
7 2818 160 254.30 0 86.25
6 2995 170 0 86.31
6 3171 180 0 86.35
6 3347 190 0 86.41
6 3523 200 0 86.50
5 3699 210 0 86.55
5 3876 220 0 86.63
5 4052 230 0 86.78
4 4228 240 0 86.82
3 4404 250 0 86.88
3 4580 260 0 86.92
2 4756 270 0 86.95
2 4993 280 0 86.99
2 5100 289 0 87.09
Note:
Machine Used : ENERPAC RCH-603*, Hollow Plunger Cylinders
Capacity : 10,000 Psi / 60 Tons
Cylinder Effective Area : 82.3 cm²
Nominal Area of Soil Na : 819 mm² (ASTM A615) NOT VALID WITHOUT SEAL

Witnessed by: Tested by: Attested by:


Gladys Ivy V. Tabera
DPWH-Regional Office VI Jeffrey G. Ganaden
Jezreel Flotilde / Gia Marie Gange Rafael Peña Nestor B. Caoile
MCCPI / JJ3 RCMTLI Field Technicians President / ME-II

This certificate is issue in accordance with the requirements of BRS-DPWH and may not be reproduce other than in full, except
with prior written approval of the Radiant Construction Materials Testing Laboratory, Inc.
RADIANT CONSTRUCTIO N
MATERIALS TESTING LABORATORY, INC.
DJ’S Commercial Stall Rentals, Brgy. Ambonao, Calasiao, Pangasinan
Contact No.: 09760363322
Email Add.: radiant.testinglaboratory@gmail.com DPWH-BRS Accredited

Field Test No.: FT-08-09-2023-03


Report Date: August 12, 2023
TEST REPORT ON CONFORMITY PULL TEST

pProject : Construction of Slope Protection Structure (Rockfall Netting) along Panay East West Lateral Road Iloilo,
with Contract I.D. No. 23GO-0019
Kind of material : 32mmØ Soil Nail
Sample identification : Soil Nail - 3
Tested at : Sta. 1+235.00
Supplied by : Monolithic Construction & Concrete Products,Inc.
Proposed use : Soil Nail Rockfall Protection Works
Governing Spec's : DPWH Government Specifications (Item 522)
Date tested : August 09, 2023
Procedure : DPWH Slope Protection Manual 2019
Strength value (90%
Total time of Actual reading Loading Loading Anchor Bolt Settlement of
of YP, 345 Mpa
testing, (minutes) machine, (Psi) value, kN Cycle Displacement, (mm) Reaction Plate, (mm)
32mmØ), kN
312 176 10 0 55.32
260 352 20 0 61.45
150 528 30 0 65.58
90 704 40 0 67.98
62 880 50 0 69.21
45 1057 60 0 71.45
21 1233 70 0 73.63
19 1409 80 0 74.21
15 1585 90 0 75.00
10 1761 100 0 76.11
10 1938 110 0 76.25
10 2114 120 0 76.34
9 2290 130 0 76.41
9 2466 140 Strength value (90% of 0 76.49
7 2642 150 YP, 345 Mpa 32mmØ), 0 76.58
Single
kN
7 2818 160 254.30 0 76.89
7 2995 170 0 77.02
7 3171 180 0 77.24
6 3347 190 0 77.35
6 3523 200 0 77.39
6 3699 210 0 77.44
5 3876 220 0 77.52
4 4052 230 0 77.59
4 4228 240 0 77.63
4 4404 250 0 77.69
3 4580 260 0 77.73
2 4756 270 0 77.79
2 4993 280 0 77.81
2 5100 289 0 77.83
Note:
Machine Used : ENERPAC RCH-603*, Hollow Plunger Cylinders
Capacity : 10,000 Psi / 60 Tons
Cylinder Effective Area : 82.3 cm²
Nominal Area of Soil Na : 819 mm² (ASTM A615) NOT VALID WITHOUT SEAL

Witnessed by: Tested by: Attested by:


Gladys Ivy V. Tabera
DPWH-Regional Office VI Jeffrey G. Ganaden
Jezreel Flotilde / Gia Marie Gange Rafael Peña Nestor B. Caoile
MCCPI / JJ3 RCMTLI Field Technicians President / ME-II

This certificate is issue in accordance with the requirements of BRS-DPWH and may not be reproduce other than in full, except
with prior written approval of the Radiant Construction Materials Testing Laboratory, Inc.