One or two parameter out of First piece Wire size wise numbering to Control at the time of tool
Wrong tool used M 1 NR 30.07.17 Production
spec inspection be provided on tools issuing (BCL No wise)
External Production delay, leading to Minimum stock level Monitoring of stock level on
Tools not available H 2 Critical tools list Continuous Stores Re-order level to be defined
issues delay in delivery of tools regular / defined basis
Compatible other
Proper induction training
Breakdown M 2 OJT machine / Training of machines Continuous Production
programme for operators
Outsource
Internal All plants having Capacity planning inline with Re-evaluation of capacities
2 Marketing Low capacity Business loss H 1 Feasibility study 30.09.17 S&M
issues similar facilities business plan through lean concept
Productivity enhancement
Create spare capacity 30.09.17 PPC
through kaizens
Can be sale to spare Alternate customer for same Market base can be
Over inventory M 2 PPC 30.09.17 S&M
market product increased
Occurrence 0-25% 1
25-50% 2
50-75% 3
75-100% 4
Recommended actions Target date Resp
Risk & Opportunities Assessment for individual process
Wrong crimping blade crimp height & width not First piece Min Spare stock to be Check feasibility of
M 1 Not Required Continuous Maint.
use as per specification inspection decided. pokayoke
First piece
External Prpoer training
Unskilled man power used Rejection of products L 1 inspection & ON Job Multiskilling product training Continuous Production
Issue programme for operator.
training
Occurrence 0-25% 1
25-50% 2
50-75% 3
75-100% 4