MATERIALS APPLICATION - UNSATURATE GAS PLANTS

JUNE 1990 PAGE 1 OF 10 EGE 55-B-7 — 1990

TABLE OF CONTENTS

1. Scope 6. Corrosion Control Methods


2. References 6.1 Plants Handling TCC Streams,
3. General Delayed Coker Streams, or Both
4. Major Materials and Corrosion 6.2 Plants Handling FCC Gas
Considerations Streams
5. Construction Materials 7. Materials Considerations During
Fabrication

1. SCOPE

This Guide provides information for the selection and use of materials in unsaturate gas plants.

2. REFERENCES

The following Mobil Engineering Guides form a part of this Guide. In each case, use the latest edition.

Mobil Engineering Guides

EGE 00-B-20 Pressure Casting Inspection


EGE 00-B-21 Pressure-Containing Equipment — Welding and Inspection
EGE 00-B-22 Pressure Equipment and Tanks — Impact Test Requirements
EGE 11-B-1 Direct Fired Process Heaters — Design and Fabrication
EGE 12-B-1 Pressure Vessels — Design and Fabrication
EGE 12-B-2 Pressure Vessels for Special Service — Design and Fabrication
EGE 12-B-21 Fractionating Tower Trays and Internals
EGE 13-B-10 Shell-and-Tube Heat Exchangers — Design and Construction
EGE 13-B-15 Air-Cooled Heat Exchangers — Design and Construction
EGE 15-B-1 Centrifugal Pumps for General Refinery Services
EGE 15-B-2 Positive Displacement Pumps — Rotary
EGE 16-B-30 Piping — Selection and Application of Piping Components and Materials (With Classification
Sheets and Appendix)
EGE 16-B-40 Piping — Fabrication, Erection, Inspection, and Testing

3. GENERAL

3.1 This Guide shall be used for Mobil projects specifying construction materials for unsaturate gas
plants.

3.2 The purpose of the unsaturate gas plant is to recover light hydrocarbons from cracked gases for
subsequent processing.
MOBIL ENGINEERING GUIDE

EGE 55-B-7 — 1990 PAGE 2 OF 10 JUNE 1990

3.3 One representative unsaturate gas plant is shown in Figure 1. Since each refinery charges different
stocks and has specific product slate requirements, this general scheme usually is modified for the various
refinery installations.

In catalytic cracking units, wet gas streams from overhead accumulators or fractionation receivers are
compressed, amine treated to remove hydrogen sulfide, and charged to the fractionating absorber. In the
absorption section, hydrocarbons are assimilated by the lean oil (debutanized gasoline) flowing
countercurrent with the gas. In the fractionation section, the light boiling fractions of the liquid and the
saturated lean oil are separated by heat supplied through a reboiling action. The fractionating absorber
offgas is routed to a sponge absorber for recovery of low-molecular-weight lean oil carryover. Either a TCC
syntower or an FCC main column sidestream may be used as the absorption medium in the sponge
absorber.

The fractionating absorber bottoms are charged to the debutanizer, which also serves as a lean oil still. The
hydrocarbon (C3/C4) overhead usually is used as alkylation unit feed. A portion of debutanized gasoline is
returned to the top of the fractionating absorber. The net debutanizer bottoms are sent to the gasoline
splitter for separation into light and heavy gasoline and further treating.

Another common variation of this process flow involves removal of hydrogen sulfide subsequent to the
absorption step.

4. MAJOR MATERIALS AND CORROSION CONSIDERATIONS

4.1 In gas plants handling TCC or delay coker streams, corrosion problems are caused by hydrogen
sulfide and underdeposit attack from ammonium compounds. Carbon steel equipment has performed
satisfactorily in such plants; however, the use of filming amine inhibitors and water slugging has been
necessary in some units.

4.2 In gas plants handling FCC streams, corrosion problems are caused by hydrogen sulfide and
cyanides. Carbon steel exposed to moist hydrogen sulfide and cyanides may corrode, hydrogen blister or
stress crack. In this service, killed carbon steel generally is used with a water wash and addition of
corrosion inhibitors. Equipment in severe service usually is epoxy coated; for example, compressor
receivers or compressor suction knockout drums.

4.3 Killed carbon steel normally is used for equipment exposed to moist hydrogen sulfide (greater than
100 ppm H2S). Refer to Paragraph 7.2 for special requirements.

4.4 Copper alloy tubes generally are used in water coolers and condensers if the ammonia content in
the aqueous phases does not exceed 0.1 percent by weight. E-Brite 26-1, Type 430 stainless steel, or
carbon steel tubes are used where ammonia content is higher. However, the carbon steel tubes may be
subject to inherent fouling problems and may require frequent replacement. When tempered water is
available for cooling, all-carbon-steel exchangers may be used. Air coolers with carbon steel tubes have
performed satisfactorily.
MOBIL ENGINEERING GUIDE

JUNE 1990 PAGE 3 OF 10 EGE 55-B-7 — 1990


MOBIL ENGINEERING GUIDE

EGE 55-B-7 — 1990 PAGE 4 OF 10 JUNE 1990

4.5 The channel, tubesheets, and tubes in fractionating tower reboilers, which are heated with hot oil and
operate above 288ºC (550ºF), are constructed from 5 Cr-1/2Mo steel. E-Brite 26-1 tubes may be used as
an alternative.

5. CONSTRUCTION MATERIALS

Recommended construction materials are presented in Tables 1 through 3 for vessels, exchangers, piping,
and other equipment such as heaters and pumps. The materials and corrosion allowances shown are
minimum requirements selected to provide satisfactory service in units operating at standard design
conditions. Where deviations from standard design conditions require changes in materials selection,
consult Mobil Technology Company, Facilities Group.

For additional materials information such as design, fabrication, and inspection requirements, see EGE
00-B-20, 00-B-21, 00-B-22, 11-B-1, 12-B-1, 12-B-2, 12-B-21, 13-B-10, 13-B-15, 15-B-1, 15-B-2, 16-B-30,
and 16-B-40.

6. CORROSION CONTROL METHODS

6.1 Plants Handling TCC Streams, Delayed Coker Streams, or Both

6.1.1 Fouling and underdeposit corrosion may occur if high levels of ammonium hydrosulfide and
ammonium chloride are present in the gas streams. The principal problem area is the high-pressure section
of the gas compressors, where water is evaporated.

6.1.2 The gas stream from the low-pressure section should be water washed to remove ammonium
compounds and sulfides.

6.1.3 When necessary to mitigate fouling, antifoulants may be added in the high-pressure stages.

6.1.4 Filming amine corrosion inhibitors may be added to the gas stream feed or to overhead systems
of fractionating towers if high corrosion rates are experienced in carbon steel equipment.

6.2 Plants Handling FCC Gas Streams

6.2.1 Corrosion is generally due to the presence of moist hydrogen sulfide and cyanides. Fouling is
usually the result of ammonium compounds.

6.2.2 To remove cyanides, wash the gas stream with water (about 6.5 pH) or a combination of water and
ammonium polysulfide (an alkaline solution of pH 8 and higher).

6.2.3 Corrosion rates in areas where water condenses are not expected to be more than 50 µm (2 mil)
per year on carbon steel components. If extensive corrosion of carbon steel equipment is experienced, a
film-forming corrosion inhibitor should be injected into the incoming gas stream.

6.2.4 Retractable corrosometer probes shall be installed between the high-pressure coolers and the
high-pressure receiver and near the middle of the absorber tower.

6.2.5 Hydrogen activity shall be monitored to determine the effectiveness of controls. Hydrogen buildup
in the probes should not exceed 69 kPa gage (10 psig) per week at the following locations:

(a) High-pressure and interstage receiver:


MOBIL ENGINEERING GUIDE

JUNE 1990 PAGE 5 OF 10 EGE 55-B-7 — 1990

(1) Top of vessel.

(2) Side just above liquid level.

(b) Main absorber:

(1) Second manway from bottom.

(2) Third manway from bottom at liquid level.

(3) Second manway from top.

(c) Above top tray in stripper tower.

(d) Debutanizer overhead receiver:

(1) Bottom boot.

(2) Top of vessel.

6.2.6 Daily spot tests for cyanide and thiocyanate shall be made in water drawn from the high-pressure
receiver and debutanizer overhead accumulator.

7. MATERIALS CONSIDERATION DURING FABRICATION

7.1 In FCC unsaturate gas plants, the hardness of welds and heat-affected zones (HAZ) shall not exceed
225 HB (238 HV10).

7.2 Equipment exposed to wet hydrogen sulfide [aqueous phase with $100 ppm (weight) H2S] shall meet
the following special materials and fabrication requirements.

(a) The carbon steel plate materials for vessels and exchangers, in order of preference, are ASTM
A515 Grade 60, ASTM A515 Grade 70, ASTM A516 Grade 60, and ASTM A516 Grade 70. Sulfur and
phosphorus shall be limited to 0.005 and 0.010 percent by weight, respectively. Oxygen and nitrogen
shall be minimized by vacuum degassing. Elements such as tin, antimony, arsenic, oxygen, and
nitrogen shall be included in the certified materials test report.

The carbon equivalent shall not exceed 0.40 for Grade 60 steels and 0.42 for Grade 70 steels. Tramp
elements shall not exceed the following limits in percent by weight: chromium 0.40, copper 0.40,
molybdenum 0.15, nickel 0.40, and vanadium 0.05. The total of all five elements shall not exceed 1.00
percent. All plate materials shall be manufactured utilizing inclusion shape control melting practice and
shall be vacuum degassed. Any inclusions such as oxides and sulfides shall exhibit a rounded
morphology. All steel plates shall be normalized regardless of thickness.

(b) All welds shall receive postweld heat treatment. All welding and heat treating shall meet EGE
00-B-21 requirements. Hardness of welds and HAZ shall not exceed 225 HB (238 HV10).

(c) All plate materials shall undergo ultrasonic testing (UT) by the supplier as specified in ASTM A578.
Any discontinuity causing a total loss of back reflection that cannot be contained within a circle of 25.4
mm (1 in.) diameter shall be considered unacceptable.
MOBIL ENGINEERING GUIDE

EGE 55-B-7 — 1990 PAGE 6 OF 10 JUNE 1990

(d) All completed pressure-containing welds shall be 100 percent examined by radiography or UT and
wet fluorescent magnetic particle treatment (WFMT). All welds attaching nonpressure attachments to
the pressure envelope shall be WFMT examined. The WFMT shall be performed after the final PWHT.

7.3 Inhibited admiralty tubes and all other copper alloy tubes shall be annealed.
MOBIL ENGINEERING GUIDE

JUNE 1990 PAGE 7 OF 10 EGE 55-B-7 — 1990


MOBIL ENGINEERING GUIDE

EGE 55-B-7 — 1990 PAGE 8 OF 10 JUNE 1990


MOBIL ENGINEERING GUIDE

JUNE 1990 PAGE 9 OF 10 EGE 55-B-7 — 1990

TABLE 2 — Contd

NOTES:

1. See Paragraph 7.2 for special materials and fabrication requirements for equipment in wet H2S service.

2. May be part of the catalytic cracking unit.

3. Ferrous tube bundles may be required under conditions where ammonia concentrations may build up (over 1000 ppm) in stagnant
areas.

4. Depending on the quality of available cooling water, seamless carbon steel tubes may be substituted for E-Brite 26-1.

5. Use killed carbon steel in plants handling FCC streams.

6. If metal temperatures of channels or tubes exceed 288ºC (550 ºF), replace carbon steel with 5 Cr-½ Mo steel.