Permit Hot Work
Permit Hot Work
Permit Hot Work
AFC/1706/HSE/01
(ISO 45001: 2018 & ISO 14001: 2015) Job code-1706
CONSTRUCTION OF MUMBAI – AHMEDABAD HIGH SPEED Rev. No:00
RAIL Package No: MAHSR – C 2
Date: 26.05.2023
Page:
3 Is Hot work operator is competent to perform the work and equipped with
communication device and protective equipment?
4 Is floor area under and at least 35 feet around the cutting and welding
operation is kept free from combustible and flammable materials or
protected from fire?
5 Is the area is cordoned off to prevent unauthorised access during hot work
activities?
9 Is fire wither is instructed to inspect area for at least 30minutes after all
hot work is ceased for the day or time.
10 are gas cylinders have been provided with flash back arrestors and gas
cylinders are kept vertical and secured to prevent fall