SBU URB Platform

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

Drilling Equipment Plant, LLC

INN (Tax Identification Number) / KPP (Tax Registration Reason Code) 7451446182 / 745101001
Registered address: 454091, Russia, Chelyabinsk city, Ordzhonikidze, bld. 43, box 5
Telephone: +7 922 239 01 55, email: bst.romanov@gmail.com, website: www.drill-rig.com

Specifications:
Name of drilling rig SBU URB
Type of engine Diesel
Engine power, hp 120
Torque, N.m 4000
Frequency of rotation, rpm 0-307
Drilling depth, m 200
Rate of 1.5 m rod drilling, min 1
Drilling rig weight, kg from 5500 kg
Max. pull down force, kgf 5000
Max. pull up force, kgf 5500
QUOTATION
Self-propelled drilling rig SBU URB
August 14, 2023 Attn: Special Environmental Projects .CO
Ref. No. 0814/02 Mr. Musaab Mohamed
Tel.: +966138983937
Email: musaab@sa-sep.com

Item Quantity, Price per Total


Name Unit
No. pcs unit, $ amount, $
Drilling rig SBU URB Platform:
- Engine type: D 245, diesel, power 120 hp
- drilling rig frame,
- Mast of rig under the tool L = 3000 mm;
- Carriage drive - chain hoist due to hydraulic cylinder;
- Rotator 2D3, 3-speed (4000 N.m or 9000 N.m torque), elevator 4T;
- transfer gearbox with PSM hydraulic motors;
- Oil cooler;
- Hydraulic distributors;
- oil tank with installed: return filter, level indicator and hydraulic oil 77,000
1 temperature, filler neck; pcs 1 (discount 72,000
- Fuel tank; 5000)*
- High pressure hoses;
- Dashboard with hydraulic pressure control devices (pressure gauge),
internal combustion engine control devices (tachometer, engine temperature
indicator, engine oil pressure indicator, battery charge indicator, fuel level
indicator, hour meter);
- battery, battery box;
- professional drilling table with centering ring;
- hydraulic outriggers on the mast (set - 2 pcs)
- folding carriage
1.1 Hydraulic outriggers (set - 4 pcs) set 1 1800 1800
1.2 Oil cooler (additional second unit) pcs 1 1000 1000
1.3 Winch for auxiliary operations pcs 1 1400 1400
1.4 Hydraulic pipe grab (with clamps for drilling pipe and PVC pipe 125 mm) pcs 1 1400 1400
Drill pipe TBSU (conical thread, locks Z-50, structural steel 40 ХН, alloyed
with steel chrome-nickel alloy, designed for production of parts used under
2 conditions of increased vibration and dynamic load, heat treatment by HFC). pcs 34 180 6120
L = 3 meters, Ø 63.5 х 4.5 mm. Method of manufacturing is friction
welding
Drill pipe TBSU (conical thread, locks Z-50, structural steel 40 ХН, alloyed
with steel chrome-nickel alloy, designed for production of parts used under
3 conditions of increased vibration and dynamic load, heat treatment by HFC). pcs 2 130 260
L = 1 meters, Ø 63.5 х 4.5 mm. Method of manufacturing is friction
welding.
4 Knockout drilling wrench Ø 50 mm (for Z-50 locks) pcs 2 120 240
5 Fork Z-50 pcs 2 120 240
MUD DRILLING (for water boreholes)
6 Mud pump NB-4 pcs 1 8000 8000
7 Set of pressure and suction hoses for pump pcs 1 200 200
8 Three-blade bit for soft soil, Ø 200 mm pcs 2 250 500
Two-blade calibration bit reinforced with tungsten-carbide plates TC 8 Ø pcs
9 2 250 500
200 mm
10 Roller cone bit Ø 190 mm pcs 2 950 1900
12 PDC-3-190 bit, Ø 190 mm, Z-117 pcs 2 500 1000
13 Adaptor Z117/Z50 for PDC and roller cone bit pcs 2 200 400
CORE DRILLING
14 Drill crown Ø 76 mm, pobedit СА6 pcs 5 35 175
15 Drill crown Ø 76 mm, pobedit KT-2 pcs 5 30 150
16 Drill crown Ø 76 mm, (TK-10) pcs 5 70 350
17 Drill crown Ø 76 mm, diamond (9-10 category) pcs 5 220 1100
18 Drill crown Ø 93 mm, pobedit СА6 pcs 5 40 200
19 Drill crown Ø 93 mm, pobedit KT-2 pcs 5 35 175
20 Drill crown Ø 93 mm, (TK-10) pcs 5 70 350
21 Drill crown Ø 93 mm, diamond (9-10 category) pcs 5 280 1400
22 Core pipe Ø 146 mm, L=1.5 m pcs 5 120 600
23 Milling step for core pipe Ø 73 mm pcs 5 60 300
24 Milling step for core pipe Ø 89 mm pcs 5 70 350
25 Core breaker Ø 73 mm (set of 3 rings) pcs 5 160 800
26 Core breaker Ø 89 mm (set of 3 rings) pcs 5 170 850
27 Pipe grip KSH 73/89 mm pcs 2 140 280
28 System of mechanical core pushing from core pipe, Ø 89 mm pcs 1 390 390
29 Pipe clamp Ø 73 mm pcs 2 120 240
30 Pipe clamp Ø 89 mm pcs 2 130 260
SPARE PART KIT
31 Spare part kit for mud pump NB-4 set 1 960 960
Spare part kit:
1. Exchangeable fitting for elevator 4T – 1 pc
32 set 1 650 650
2. Hardened bolts for Exchangeable fitting – 8 pc
3. Filter for engine: fuel filter 1 pc and oil filter 1 pc
33 Spare parts kit for hydraulic system (hydraulic motor PSM) pcs 1 1000 1000
Spare parts kit for rotator (pump for rotator lubrication, oil to rotator, rotator
34 set 1 500 500
shaft bearings, external pipeline for oil supply)
35 Delivery cost, CIF Port of Dammam, Saudi Arabia pcs 1 12,000 12,000
TOTAL, $ 120,040
* The discount and gifts are valid until August 31, 2023
Optionally:
 Commissioning of the two drilling rigs on site of customer during
the period of one week by team of three people: drilling specialist
and hydraulic specialist, plus service of interpreter/project
10,000
supervisor,
36 pcs 1 (discount 8,500
 Drilling of one test borehole at each unit of drilling rigs;
1500)*
 Training of local staff;
 Not including expenses for traveling, accommodation, meals and
daily allowance
 Training of one or two persons from your company at BST factory
during the period of up to 1 month, including daily visits of real 2000
37 drilling sites (not including services of translators if they should be pcs 1 (discount 1000
used) 1000)*

* The discount and gifts are valid until August 31, 2023
SBU URB 2D3 on skid:
Dispatch of similar drilling rig platform to Guatemala in 20-feet container:
Payment conditions. Payment is made in two stages:

1. 50% advance payment for commencement of drilling rig manufacturing is made until August 31, 2023;
2. the remaining 50% of the drilling rig cost are paid upon drilling rig completion and readiness for shipment from the plant in
Chelyabinsk, Russia.
Mode of payment. Wire transfer of funds under invoice and supply contract.
Shipment cost. We perform shipment on CIF conditions per Incoterms. The shipment cost is 12,000 USD CIF Port of Dammam,
Saudi Arabia. Delivery period is approximately 2 months.
Time of manufacture. 45 calendar days after receipt of 50% advance payment and contract signing.

Below you can watch other videos with overview and testing of SBU URB and SBU URB MINI:

https://www.youtube.com/watch?v=eeVQRTgHHXc – Testing of new model SBU URB for customer from Austria

https://www.youtube.com/watch?v=7uuAByJr9Vc – Overview of SBU URB MINI for customer in UAE

https://www.youtube.com/watch?v=bhMP7PM9yAQ – Overview of SBU URB MINI for customer in Senegal

https://www.youtube.com/watch?v=yIKwTp-fsIg – Testing of SBU URB MINI for customer in UAE

https://www.youtube.com/watch?v=yjR2yo0ce5Q – Testing of SBU URB MINI for customer in Senegal

https://www.youtube.com/watch?v=3kKTAZFxY9I – Shipment of SBU URB MINI to UAE

We invite you to visit our manufacturing department located at: Russia, Chelyabinsk city, Ordzhonikidze, bld. 43
https://www.youtube.com/c/BSTDrillingEquipmentPlant
https://www.facebook.com/bstdrillrig/
Personal mobile phone: +7 922 239 01 55
E-mail: bst.romanov@gmail.com
Website: www.drill-rig.com

You might also like