m0 iz0 jkT; fo|qr mRiknu fuxe fy0

¼mRrj izns’k ljdkj dk midze½


ifj;kstuk fu;kstu vuqJo.k ,oa izcU/ku bdkbZ
prqFkZ ry] TC/46V, foHkwrh [k.M
xkserh uxj] y[kuÅ A
UP RAJYA VIDYUT UTPADAN NIGAM LTD
(A UP GOVERNMENT UNDERTAKING)
Project Planning , Monitoring & Management Unit
4th Floor, TC/ 46 V, Vibhuti Khand Gomti Nagar, Lucknow
CIN : U40101UP1980SGC005065

No. : /PPMM/SE-I/Obra ‘C’ Date: Aug. , 2022

DOOSAN POWER SYSTEMS INDIA PVT. LTD.


4th Floor, Block A, Lemon Tree Hotel Complex,
Village Ullahwas, Urban Complex,
Golf Course Extn. Road, Sector 60,
Gurugram, Haryana-122011
Kind Attention: Mr. Jubong Hong, Director (Quality)
Sub: Regarding vendor approval for the supply of Vacuum pump for Ash Handling Systems of
Obra ‘C’ 2x660 MW TPP
Ref:
Dear Sir,
This has reference to the request of vendor approval of M/s Aeromatic Eng. Pvt. Ltd., Kheda,
Gujarat-387640 in place of M/s Vacunair Engg. Co. Ltd., Ahmedabad, 380023.

 Foremost, during verification of inspection dossier submitted by DPSI against MDCC letter
no.04376 dated 13-June-2022, it is found that DPSI has submitted all the documents of M/s
Aeromatic Eng. Pvt. Ltd., in place of M/s VACUNAIR Eng. Pvt. Ltd. Hence DPSI was
requested to submit credentials of Merger/Acquisition Certification/name change.
In response, DPSI has submitted NCLT order, claiming that two companies (Vacunair and
Aeromatic) were amalgamated.
However, vendor approval of M/s Vacunair, Ahmedabad which was accorded on 17.04.2018
and the NCLT order for amalgamation delivered dated Sept, 2020 and pumps are being
offered for inspection in May, 2022 and supplied in June, 2022.
Observing the aforementioned time span, it is evident that neither DPSI nor Indure has
information regarding the change in company status to expedite timely vendor approval of
M/s Aeromatic Eng. Pvt. Ltd.

 Anyhow, keeping in view of site urgency, we have referred DPSI request to consultant NTPC
for their urgent review and recommendation on this issue and to coordinate with NTPC for
faster disposal of the matter.
In response to DPSI submitted credentials for assessing the vendor name change, NTPC
stated that it is not a case of name change of company rather it is a case of shifting of
works. Also, proposed vendor is approved under site PO not corporate PO and
proposed for approval for vendor to be furnished.
 Further, in view of delay in vendor assessment, DPSI was requested to update with status, in
response DPSI has submitted survey report which is also not submitted timely along with
other documentation requisite for the vendor approval.
In addition to that NTPC recommended that M/s DPSI may be requested to submit vendor
proposal in our format F1 & F2(attached) along with their vendor assessment report, factory
license, supply experience, vendors QMS system, recent supply POs with inspection report
etc.
Again, DPSI has submitted unsatisfactory response to NTPC query excerpted below-
In sub vendor questionnaire
applicable cl for design has been Design Department is located at Rakhial Location, which is already
1.
crossed out. Whether desing is approved with NTPC since 2000 same is working for proposed plant also.
under scope of M/s DPSI? This location Design Dept. not available.

Why type test is not applicable? There is absolutely no change in the Design of Inspected Vacuum Pumps
2. while transferring production activities on 01/04/2022 from Rakhial to
Lasundra factory. This Pump Design is already well accepted in the NTPC
plants all over. So, there is no requirement of Type Test.
Since Supplies from Lasundra plant have started from 01/04/2022,
Customer feedback to be
Customer Feedback is not available. However, please note that
3. furnished.
respective NTPC stores have cleared the Inspection and have put the
Spares/assemblies in Operation smoothly.
4. ISO certification to be furnished. ISO certification is under process and can be furnished in 5-6 months.

Rating of Pump has not been Please note that our Vacuum Pumps having capacity of 1000-7000 m3/hr
5.
mentioned in proposal. with vacuum range 100-450 mmHg are already in Operation. We seek
approval for the same rating.

From above, it is apparent that DPSI has submitted unsatisfactory response in spite of
knowing the process of vendor approval and credential requisite for the vendor assessment.

In view of the aforementioned facts, it is certain that DPSI has kept hiding change in vendor or else
being negligent to provide timely intimation to the owner regarding the vendor change to process
timely approval of vendor and later on deliberately delaying the process of vendor approval.
Hence,

Thanking You,

Yours faithfully,

(ANURAG BAJPAI)
m0 iz0 jkT; fo|qr mRiknu fuxe fy0
¼mRrj izns’k ljdkj dk midze½
ifj;kstuk fu;kstu vuqJo.k ,oa izcU/ku bdkbZ
prqFkZ ry] TC/46V, foHkwrh [k.M
xkserh uxj] y[kuÅ A
UP RAJYA VIDYUT UTPADAN NIGAM LTD
(A UP GOVERNMENT UNDERTAKING)
Project Planning , Monitoring & Management Unit
4th Floor, TC/ 46 V, Vibhuti Khand Gomti Nagar, Lucknow
CIN : U40101UP1980SGC005065

SUPERINTENDING ENGINEER

CC:- To the following for kind information:-


1. Chief Engineer (L-1), PPMM Unit, Vibhuti Khand, Gomti Nagar, Lucknow-226010
2. Chief Engineer, Obra ‘C’ Thermal Power Extn. Project, Obra, Sonebhadra