1.3 REFERENCES:
1.4 SUBMITTALS:
B. Shop drawings showing the excavation and the backfilling areas as well as the ground
levels mapped from a topographic survey along the proposed earthworks as shown in
the tendered drawings. Cross sections shall be provided at stations of 25 m intervals, at
any change in geometry, any abrupt changes in ground levels, or as per the Engineer’s
request, whichever is smaller. Work should proceed after the Engineer’s approval to
these drawings.
C. The Contractor will be required if requested to submit his detailed proposals for materials
and methods to be used in carrying out the work, and these must be approved by the Engineer
before work commences. Items included are:
1. Warning Tape
2. Filter Fabric
E. Proposals for the location of stockpiles
G. Weekly progress reports summarizing the construction activities at the project site.