Professional Documents
Culture Documents
Quotation To Remove Bulging Wall (Rear of Production)
Quotation To Remove Bulging Wall (Rear of Production)
Date 14-Sep-23
As per discussed, we are pleased to submit a quotation for the above mentioned for your consideration.
1 Supply manpower, tools and equipment to remove and dispose bulging LS 1.00 4,000.00 4,000.00
partition wall.
Location: Rear of production area (Gridline 13/B3 - D)
Marked in Red below.
Total = S$4,000.00
(Excluding GST)