R07-HC3C20-AAP-MTS-CI-0005 (02) Method Statement of Site Mobilization at Island (Revised)
R07-HC3C20-AAP-MTS-CI-0005 (02) Method Statement of Site Mobilization at Island (Revised)
R07-HC3C20-AAP-MTS-CI-0005 (02) Method Statement of Site Mobilization at Island (Revised)
TRS-CN-FRM-0019
General Information
Project Name Red Sea Shura Central Hotel 03 (HC03) Project Code R07-HC3
Submittal No. R07-HC3C20-AAP-MTS-CI-0005 Date 26-Oct-2022
Contract No. R07-HC3C20-3050
Contract Description Red Sea Shura Central Hotel 03 (HC03) CONCRETE STRUCTURE - R07-HC3C20-3050
Contractor
Method Statement of Site Mobilization at
Contractor Name Abdul Mohsen A.H Al Tamimi Subject
Island
Specification No. N/A Drawing Ref. R07-HC3C20-KAA-XX-GF-DWG-
AR-05500
Discipline CIVIL Other (please specify)
Planned Date of Work Submitted For: ☒
☐ Approval ☐ Information
Contractor Authorized Representative
Engineer’s - Comments
Comments:
Status Code
Owner’s Engineer
Contractor
PROJECT:
Package:
CONCRETE STRUCTURE - R07-HC3C20-3050
FOR APPROVAL
Issued for approval Noor ul Amin Waqar Hussnain Osama Taha 26-10-2022
02
01 Issued for approval Noor ul Amin Waqar Hussnain Osama Taha 18-10-2022
00 Issued for approval Noor ul Amin Waqar Hussnain Osama Taha 10-10-2022
Revision Record
Version Date Section Page Description of Modification and basis
DAR Comments
this Comments will be comply for Further
1 References Mehtod Statement as per the TRSDC
Instrcution
this Comments will be comply for Further
2 Responsibilities; Mehtod Statement as per the TRSDC
Instrcution
this Comments will be comply for Further
3 Material Storage location Mehtod Statement as per the TRSDC
Instrcution
this Comments will be comply for Further
Refer to the TRS-HS-FRM-0034
4 Mehtod Statement as per the TRSDC
Instrcution
1. Title
Site Mobilization Method of Statement
3. Location
The Site Mobilization activities at CONCRETE PACKAGES RO7-HC03C20-3050 SHURA ISLAND Project.
• The site Mobilization works Checking / Verifying of the Established Control Network by GPS
methods.
• All the control point will be inspected by supervision consultant.
• Abdul Mohsin al Tamimi (AMT) will provide welfare facilities for workers including drinking
station, food and shelter as per TRSDC HSE Requirements and approved (attached) HC03
Logistic layout
• AMT will provide direct manpower to the site in order to start the activities.
• AMT will provide safe access to the site equipment and manpower with direction signages.
• Layout marking will be done for barricading laydown, stockpiling, excavation areas as per
(attached) HC03 Logistic layout
• Site equipment will be mobilized as per the available work fronts. (2 Excavator, 1 loader, 1
bobcat already available on site).
• Will provide the hard barricading using steel pipes (1.5 inch).
• Temporary Power Generator units off loading and installation will be done in accordance with
critical lifting plan (Rev 01- AAP07HC3-WTRAN-000081). Power connections will be done
subsequently.
• Erection and placement of porta cabins for site office and other facilities.
5. Methodology
11. Permits
Other
Logistic layout will change as per the available work fronts and overall site progress. Refer to the
(attached) HC03 Logistic layout.
TO WEST
HOTELS
6.0
BR M
DR
ID IVE
W
GE AY
To HC2
02
Pe
de
6.0M DRIVEWAY str
ian
Y
Pedestria 6.0M D RIVEWA sW
ns Walkw alk
ay wa 6.0
y M
y
DR
wa
IV
alk
EW
W
AY
s
an
Northwest ZONE
i
str
de
Pe
(NW1)
AY
EW
IV
SE W
GR AS
2.55 EG TE
.0
X5 ATIO
M N
SE W
DR
GR AS
2.55 EG TE
X5 ATIO
End Cap
M N
SE
+5
W
GR AS
2.55 EG TE
X5 ATIO
M N
10 ._W.T
6.0
cu.m
NS
CO
Pedestrians Walkway
6.0
MD
RIV
To HC2
SEGR 5X5M
EW
WA ATION
2.5
STE
EG
SEGR 5X5M
Northwest ZONE
WA ATION
2.5
AY
STE
EG
SEGR 5X5M
WA ATION
2.5
EG
STE
a.
End Cap End Cap
(NW2)
Di
Ped
est
rian
s
m
Wa
lkw
Dia.
ay
m
m
50
25m
AY
00 05/10/2022 Issued for Information
6.0
RIVEW
M DR
WA
TANK
TER m
5 cu.
CONS._W.T
10 cu.m
AY
6.0M D
ia.
EW
BR
WATER TANK
D
5 cu.m
mm
Northeast ZONE
IV
25 IDG
DR
ay Key Plan.
alkw
TO WEST
0M
(NE1)
n sW
E0
6.
ria
est
ay
Ped
1
Walkw
End Cap lkw
ay
6.0M DRIVEWAY HOTELS
trians
a
n sW
tria
es
Pedes
d
Pe
AY
Dia.
VEW
25mm
DRI
6.0M
6.0M DRIVEWAY
Makkah
ia.
End Cap Northeast ZONE N
50mm D
(NE2)
BEACH CREST +3.0m (Plot Boundary)
y
wa
alk
sW
5 cu TANK
.m
ER
WAT
n
tria
des
Pe
End Cap
MSL (Sea Level) +0.0m
AY
AY
EW
.0
+3
RIVEW
IV
DR
M
6.0
D
Central ZONE
6.0M
ay
Y
HAT (High Atmospherical Tide) +0.5m
WA
AY
Pedestrians Walkway
EW
IVE
IV
a.
DR
DR
Di
M
mm
Southwest ZONE
6.0
UN
DE
SE RG
PT RO
IC
10 TA UN
cu. NK D
50
m
W
AT
ER
TA
NK
ng
rki
Walkway
Pa
.
Dia
Pedestrians
m
50m Contractor
.0
End Cap
+5
IVEWAY
Dia
mm End Cap
25
WAY
Southwest ZONE
6.0M DR
DRIVE
(SW2)
Pedestrians Walkway
End Cap
way
SE W
GR ASTE
2.5 EGAT
5X IO
5M N
SE WAS
GR TE
WATER TANK EG
CONS._W.T 2.5 AT
SE W
GR ASTE
EG
2.5 AT
5X IO
5M N
Y Riyadh@khatibalami.com www.khatibalami.com
EW
Signature/Design Architect
MD
6.
6.0
0M
D
R
Client
.0
sW
End Cap
+3
ian
str
de
Pe
Pe
de
str
ian
sW
alk
wa
MR OTS
AR
EG
y
Project
6.0
Shura Island
M
DR
UN
SE DERG
PT
10 IC ROUN
cu TA
.m NK D
IV
AY Program 07
EW
W
AT
ER
TA
NK
Mosq
6.0 W
AY
VE
ue
M I
DR
IV
EW
DR Hotel Central 03
Pedestria 0M
AY ns Walkw
ay 6.
Jetty
HC3 LOGISTIC LAYOUT
To (6) Mr HC3C20 AMTG - Abdul Mohsen A.H. Al Tamimi Partners Company (+5 more...)
Cc (3) Mr Kaleem Ullah - The Red Sea Development Company (+2 more...)
Status N/A
(0 selected)
ATTRIBUTES
MESSAGE
The attached documents have completed the "R07-HC3C20_Contract - Construction Environmental and Social Management Plan (CESMP)"
workflow with the following results :
https://ksa1.aconex.com/hub/index.html 1/3
10/19/22, 4:16 PM Aconex
EN-0002
1. Method of statement of
the dewatering to be
submitted separately. 2.
The DWMP to be
submitted separately. 3.
The CESMP objectives
must comply with
contractor’s scope and
activities. 4. Chapter 5. -
Environmental and
mitigation measures must
include Matrix for
Determining the
Significance of
SC_TECH_COMP A Ghith Accepted with Comments
Environmental Impacts. 5.
Chapter 10. -Weekly
environmental report must
include the daily and
weekly contractor’s
inspection checklists /
Calibration certificates for
the used monitoring
equipment / Monitoring
Statistics 6. Contractor to
attach a comments and
response sheet to
demonstrate that all DAR
comments rectified.
https://ksa1.aconex.com/hub/index.html 2/3
10/19/22, 4:16 PM Aconex
NOTES
https://ksa1.aconex.com/hub/index.html 3/3
Safety (JSA)
ABDUL MOSHEN A.H. AL TAMIMI GROUP
SHURA HC3 CONCRETE PACKAGED
Job Safety Analysis
TRS-HS-FRM-0001
Section I -Enter general information about the site and job task.
Section II - Determine whether any of these operations apply to the job task to be performed. Make note of any special training, permit, certification, and risk
assessment requirements.
Section III - Identify any human/organizational factors that could impact the ability to perform the work safely.
1. Break the job down into steps - Be as specific as possible. Write each job step in a new row of column A (Activity/Step). It’s a good idea to leave an extra row
between steps in case you need them later. Add additional rows to the table as needed, or if completing the JSA on paper, print additional copies of the sheet
to accommodate all job steps.
2. Determine the hazards associated with each job step and write them in column B (Hazards). Use the examples of hazards provided below to trigger your
thinking about different types of hazards and energy sources.
3. List any control measures that will be taken to ensure that step is done safely in column C (Control Measures). Use the control measure examples and hierarchy
provided to trigger your thinking about different types of controls and their effectiveness at reducing risk. Controls toward the top of the table tend to be
more effective at minimizing the severity and/or likelihood of an event than the controls toward the bottom of the table. If this job involves a Life Crucial
Operation, continue to step 4. Otherwise, repeat steps 2-3 for each of the job steps identified, then proceed to step 8.
4. Considering the hazards involved and the control measures that will be in place, determine the worst credible severity of an incident that could result from
this job step. Use the severity table provided. Write the severity number in column D (Severity).
5. Considering the hazards involved and the control measures that will be in place, determine the likelihood that an incident will result from this job step. Use
the likelihood table provided. Write the likelihood number in column E (Likelihood).
6. Multiply the severity number by the likelihood number and enter the product in column F (Risk).
7. Consider the risk rating against the thresholds provided in the Overall Risk Ratings.
i. Very low and low risk ratings of 1-2. This level is generally considered acceptable provided that all control measures are applied.
ii. Medium risk ratings of 3-9. Medium risk requires a planned approach to control the hazard and applies additional controls if required. Action taken must
be documented on the risk assessment form.
iii. High and Very High-Risk ratings of 10-25. For all high and very high risk, Column G (Additional control measures) must be implemented to further reduce
the risk to a medium or low level. Such activities shall not be proceeded until applying additional control measures. The Construction Director/Manager or
facility Manager must personally review the activities with a High or Very High residual risk score and approve additional control measures by signing off the
JSA.
8. Repeat steps 2-7 for each of the job steps identified.
Section IV - Provide the name, company, and title of those who prepared and reviewed/approved this form in the signature box provided. The Construction
Director/Manager or facility Manager must review and approve the additional control measures that have a High or Very High-Risk rating before proceeding the task.
Additional space is also provided for crew members to sign the JSA if desired.
Reference Table in completing Section III – Job Safety Analysis (Column B – Hazard)
Biological & Electrical Chemical Gravity/Height Mechanical & Motion
Environmental Arc Flash Air Emissions Equipment Being Thrown Off/Under
Altitude Buried Utilities Chemical Products Tipping/Collapsing Equipment
Animal Bite/Sting Damage to Leads/Cables • Carcinogenic Excavation/Trench Disintegration of Moving
Blood-Borne Pathogens Damage to Switches • Combustible/Flammable Falling Objects Components
Contaminated Food/Water Energized Circuits/Conductors • Explosive Floor Openings/Edges Driving/Vehicle Traffic
Insect-Borne Disease Inadvertent Energization • Toxic Grating Removed Ejection of Workpiece/Debris
Pests Lack of Isolation/Grounding • Corrosive Inadequate Support Entanglement
Poisonous Plants Missing/Damaged Insulation • Reactive Lack of Access Ladders/Stairs Friction
Precipitation Overhead Lines Client/Process Chemicals Suspended Load Movement/Shifting
Temperature/Humidity Overload of Circuits Lack of Containment Unstable/Insecure Materials Moving Parts
Unsanitary Conditions Stored Energy Leakage/Spills Work Above/Below Others Pinch/Crush Points
Weather (Batteries/Capacitors) Material Incompatibility Work at Height/Fall Hazards Projectiles
Wind/Turbulence Water Near Electrical Produced/Disturbed by Work Walking/Working Surface Rotating Equipment
Pressure Conductors • Asbestos • Slippery Sharp Edges, Corners, or Points
Abrasive Blasting Work Environment • Lead • Uneven Shearing
Compressed Gases Cluttered • Silica • Obstructed Stored Energy
High Pressure Fluid Confined Space • Welding Fumes • Steep (Springs/Accumulators)
Pressure Testing Damaged Tools/Equipment • Dust • Moving/Swaying/Pitching Striking
Pressure Washing/Blasting Entrapment Water Discharges • Insufficient/Unstable Trapped Between Equipment
Radiation Erosion Wastes Generated Ergonomic and Fixed Structures
Intense Light Hazardous Atmosphere • Hazardous Awkward Unexpected/Uncontrolled
Lasers • Oxygen Rich/Deficient • Non-Hazardous Postures/Movement Movement
Microwaves • Contaminants Sound Excessive Force/ Exertion
Naturally Occurring Ignition Sources Continuous Noise Heavy/Awkward Load
Radioactivity Radioactive Inadequate Ventilation Intermittent Noise Repetitive Motion
Material Poor Lighting/Glare Extreme Noise Same Position
X-Rays Restricted Access/Egress Impact Noise Vibration
Runoff
Reference Table in completing Section III – Job Safety Analysis (Column F – Risk)
Details
Program Number. R07-HC3C20-3050 Company Name ABDUL MOHSEN A.H. ALTAMIMI GROUP
Project Name SHURA HC03 CONCRETE PACKAGED PROJECT Date 10/09/2022
JSA /Risk Assessment Title SITE MOBILIZATION Category ☒ New ☐ Revised
Specific Location SHURA HC03 Building SITE FACILITIES
Plant Tools & Equipment Required Excavator, Loader, Compactor, Dump Trucks, Water Tanker, Total station, etc. Area SHURA HC03 CONCRETE PACKAGED
Section III – Job Safety Analysis Risk Assessment (Post Control Measures)
(A) (B) (C) (D) (E) (F) (G) (H) (I) (J)
Activity/Step Hazards Control Measures Severity Likelihood Risk Additional Control measures Severity Likelihood Risk
• Ensure the work area is clear of any
obstructions. Unnecessary materials
shall be removed to prevent slip and
trip hazards. • Assigned HSE Representative to ensure
• Work area shall be barricaded with the verified ID certificates for operators is
1. Survey Work (Survey and safety warning or hard barricade valid with expiration date issued.
Stake out). whenever area is exposed to traffic • Ensure the assigned signalman/rigger or
hazards. flagman is always at the site for proper
• Debris and other construction waste coordination.
Unplanned Traffic Flow. • Ensure prior of heavy equipment use pre-
shall be hauled out of site. checklist are being carried out.
• Promotional Safety Signage shall be • Ensure the approved heavy equipment
posted around the work zone. operators with valid ID third party
Unsafe Work Areas. • Flagmen shall be assigned to eliminate certificate.
Traffic Hazards. • Assigned HSE Representative to ensure
• Traffic Management Plan shall be 2 2 4 2 1 2
the sticker ID for equipment is valid and
developed and submitted to for up to date.
approval. Further, that includes • Ensure prior of starts of activity, all
Slips; Trips; Fall. excavation/trenching activity and necessary barricading and signage is in
pedestrians. place.
• Ensure Buses, Equipment, Light • Ensure all involved in the activity are
Vehicles shall park at designated required to stay at site while the activity is
parking area. ongoing.
• Communicate the designated • Assigned/dedicated flagman are
ASSEMBLY AREA to all workers. equipped with reflective vests and flags
• Communicate the Emergency (green & red) to guide the operator and
Procedure & Call Numbers to all assist during equipment maneuverer.
employees.
Safety Analysis for more relevant • All damage hand tools must be
topics. Safety Officers should involve removed at work site
themselves during Pre-Task Briefings immediately.
to ensure of the existing hazards and
its precautionary measures are
properly discussed.
• Ensure only appropriate tools are used
for intended activity. Further, no
altering of tool or substitution for that
matter.
Manual / Mechanical
• Ensure proper procedure during • Conduct awareness training on manual
handling.
manual/mechanical handling of activity 2 2 4 handling. 2 1 2
Heavy/Awkward Load
to be done prior to work.
4. Adverse Weather Exposure to extreme Hot • Heat stress awareness training just • Conduct mandatory Heat Stress
before and during the hot summer Awareness training to all employees prior
months to all applicable personnel (who of deployment at site.
work outdoors) and those who manage 3 2 6 • Provide rest shelter and water on site 2 1 2
personnel and have responsibilities for prior of activity at site.
establishing heat stress mitigation • HSE Dept. to monitor on daily basis for
measures. the weather condition at site.
• Ensure required rest period, and • HSE Dept. to identify the Heat Index
minimum water needed. danger category on daily basis.
• Provide own calibrated data logging • A standby qualified first aider/site Nurse
Temperature and Humidity monitor to and first aid kit must be available at site.
ensure timely determination of weather • Ensure supply of water daily, to provide
condition. abundant supply of water at site.
• Danger category color coding shall be per • Ensure site with proper monitoring and
the heat index. using kestrel equipment heat stress
• Take appropriate action upon developing program.
symptoms of heat cramps, heat
exhaustion or heat stroke.
• Ensure designated rest shelter have
sufficient drinking water station.
• Administrative controls like
acclimatization, temperature, and
humidity monitoring, flagging system etc.
should be in place.
• Ensure all workers follow the use of • Ensure appropriate PPE’S to be use when
Exposure to extreme Cold
clothing when temperature working to temperature working to outside.
outside
• Administrative controls like 3 2 6 • Ensure site with proper monitoring and 2 1 2
acclimatization, temperature, and using kestrel equipment heat stress
humidity monitoring, flagging system etc. program.
should be in place
• Work is strictly prohibited during
Lighting /thunderstorm
lightning and project personnel are not • Ensure all workers working at site with
allowed to stay outdoor. proper shelter in place.
• If safe building structures are not • Stop work immediately if Lighting
accessible, employers should guide /thunderstorm and notify the transport
workers to hard-topped metal vehicles foreman for the standby of BUS as shelter
with rolled up windows. Remain in the 3 2 6 at site. 2 1 2
vehicle for at least 30 minutes after • In any case of emergency, a standby
hearing the last sound of thunder. vehicle at site radio or cell phone to
• After hearing thunder, do not use corded contact directly.
phones, except in an emergency. Cell • All emergency contact list must provide to
phones and cordless phones may be all driver/s.
used safely.
Heavy Rain • Ensure work is strictly prohibited during
heavy rains and project personnel are • Ensure all workers working at site with
not allowed to work/stay outdoor. proper shelter in place during the rain.
• If water accumulated or the area is • Always be vigilant of the flooding in the
flooding due to rain, wait to subside area, look for the high location if flooded
3 2 6 2 1 2
before resuming the work. or call for an emergency.
• If water is present in the excavation, de- • Ensure on any presence of water in
watering shall be performed by installing excavated area don’t allow any worker/s
submersible pumps or equivalent should to resume the works.
land survey work is urgent.
Wet Garbage. • Debris and other unnecessary materials • Ensure all waste materials to be disposed
Accumulation attracts shall be discarded from site. properly on timely manner especially the
disease carrying • Empty drinking bottles and wet garbage hazard materials.
insect and animals from excess food should be properly • A designated garbage bins to be provided
Not sanitized Toilets disposed at designated bins and hauled for segregated waste are to be followed.
Environmental damaged out daily. • Assigned Housekeeper to ensure Toilets
• Portable Toilets should be maintained on 2 2 4 are maintained with checklist on daily 2 1 2
Daily Basis. signed by his supervisor.
• Trash and garbage shall only be disposed • Ensure approved third-party garbage
of at approved sites as designated by RED collector to be collected on site.
SEA or local municipality. • Any hazard materials on site especial
• All unwanted materials at the site should care for the environmental impact and
be disposed of especial hazard materials. disposed properly.
• Proper planning and look ahead by
Discipline Supervisor. Prior to his
activities he shall:
▪ Familiarize himself and his team with
the site-specific emergency
Lack of proper procedure.
7. Construction team conducted
planning / emergency ▪ Know the actual locations of nearest
utility works activity at site. “If
readiness / safe assembly areas. • Ensure proper planning and look ahead
accident happens at site”
awareness of safe ▪ Conduct toolbox talk with his crew on by construction team of any activity at
evacuation procedure. emergency procedure. site.
▪ See to it that safe access route is • Ensure to comply with RED SEA TRS-HS-
available from work area towards the ADM-0007 (Emergency Preparedness
nearest safe assembly area. and Response) of any emergency
▪ Be familiar with the prevailing wind protocol.
against the locations of nearest safe • Follow the STOP Work or Evacuation
assembly points. At least 2 safe Alarm, as an instruction from Site ERT /
assembly points in opposite directions HSE, of any emergency protocol.
2 2 4 2 1 2
shall be known to the crew from each • Conduct emergency training drills in
work location. coordination with RED SEA/PMC for the
▪ Be familiar with site specific awareness by all workers on site.
Emergency Response Plan (ERP) and • Ensure emergency contact list to be
requirements of this document. posted at site and keep up to date the
• Understand / comply with RED SEA TRS- contact list.
HS-ADM-0007 (Emergency Preparedness • Provide training to all workers on how to
and Response). contact the details in the emergency
• Upon hearing site STOP Work or contact list.
Evacuation Alarm, or receipt of an
instruction from Site ERT / HSE, Discipline
Supervisor shall lead his crew to ensure
following actions are taken:
▪ Stop work
▪ Alarm others
▪ Shutdown all machines e.g.,
generator, welding machines, etc.
Note: Insert additional rows or print additional sheets as necessary to accommodate all job steps
H&S Representative