The document summarizes an HSE audit of Profab by an organization. It contains 15 elements with comments and remarks from the organization. For many elements, the organization notes that standard operating procedures, trainings, and documentation are being developed or improved to address audit findings. Overall, the organization is taking actions to enhance its HSE policies, procedures, inductions, inspections, and record keeping in response to the audit.
The document summarizes an HSE audit of Profab by an organization. It contains 15 elements with comments and remarks from the organization. For many elements, the organization notes that standard operating procedures, trainings, and documentation are being developed or improved to address audit findings. Overall, the organization is taking actions to enhance its HSE policies, procedures, inductions, inspections, and record keeping in response to the audit.
The document summarizes an HSE audit of Profab by an organization. It contains 15 elements with comments and remarks from the organization. For many elements, the organization notes that standard operating procedures, trainings, and documentation are being developed or improved to address audit findings. Overall, the organization is taking actions to enhance its HSE policies, procedures, inductions, inspections, and record keeping in response to the audit.
The document summarizes an HSE audit of Profab by an organization. It contains 15 elements with comments and remarks from the organization. For many elements, the organization notes that standard operating procedures, trainings, and documentation are being developed or improved to address audit findings. Overall, the organization is taking actions to enhance its HSE policies, procedures, inductions, inspections, and record keeping in response to the audit.
Please submit Job Description and or HSE Manual. Stated about Safety and Health 3 File attached Responsible 1 On progress of creating HSE statistic report (format of 5 Send copy to Profab for basic statistic report report is attached) 6 Please send HSE Policy after signed by Top Management File attached Re-encourage training related Safety Disk Control and Replacement to all operator Submitted to Profab at 16 Aug 2023 (Countermeasure 2 1, 2, 3, 4, 5 incharge effective 11 Aug 2023 Report QHSE-0823-01) Please set up JSA for filling the gas into the cylinder Submitted to Profab at 16 Aug 2023 (QHSE-BTG-JSA-01 1, 2 Please set up JSA for valve inspection & installation including safety disc inspection & QHSE-BTG-JSA-02) 3 Hazard identification for our routine activity is called 4 Please identify and set up JSA for all critical area HIRA. There are 4 (Four) files attached (Still On Progress) The Organization shall establish the list of legal. All the operation process shall refer to File attached (Still On Progress of updating and 4 1, 2, 3 the local regulation or external regulation. compiling all regulations) All visitors, including subcontractor, that visit or work at BTG Factory must attend the Safety Induction session. There will be an attendance list for all people that 5 2 Please set up the safety induction for visitor already follow the Safety Induction. After one year, the visitor must attend the Safety Induction for refreshment if needed. On progress looking for the 3rd party for yearly 7 2 The organization shall consider to invite the 3rd party to attend the yearly testing hydrotest Please release the Emergency Response Procedure and get signed involvement by 8 2 File attached Management On progress of exploring cooperation with health 9 1, 2, 3 Pre-employment MCU Program and Regular MCU Program suggest need to set up service provider 10 4 Audit Program and selection the vendor suggest to be implementing Vendors are audited every September (file attached) Zero Tolerance of damage webbing and polyster sling. Please look the detail 12 3 Countermeasure Report QHSE-0923-02 requirement onto Permenaker 8 Tahun 2020 and ASME B30.5 Suggest to include the Inspection Process Activity into the procedure to address the Audit Internal Procedure (IP-BTG-MR-03) poin 5.6 (File 1 daily inspection program attached) 13 The Maintenance Log book for each vehicle need to establiesh and implement to 5 File attached monitor the track of history repair and maintenance. 1, 2 Please release the procedure (SOP-BTG0QHSE-009) and get sign by Management File attached 14 3 Investigation form need to establish and identify register number. File attached Establish barricade & signed shall clear and visible during pressure test operation 3 Photo attached 15 eventhough process belong routine activity 4 Found expired weighing machine at site during inspection Countermeasure Report QHSE-0923-01