Instructions
You and your team are engineers who are developing a process to assemble four sticker eggs (like Potato
Heads) as quickly as possible with all of the right pieces in place in the right positions. You will be given three
attempts to streamline your process as much as possible. Your team will need to weigh speed against
accuracy.
2. Calculate the number of opportunities for each of your products. The egg and each sticker procured
is an opportunity and the placement of each sticker is another opportunity. Example: One egg and
seven stickers and procured, and seven stickers placed, results in 15 opportunities. Record the
number of opportunities below.
System 1
e. Determine any wasteful steps or problems with the process. List ways in which the process can be
improved.
System 2
e. Determine any wasteful steps or problems with the process. List ways in which the process can be
improved.
System 3
5. Determine any wasteful steps or problems with the process. List ways in which the process can be
improved.