USAID/NARUC/Ethiopia Bilateral

Partnership Exchange

Energy Efficiency in Ethiopia


Planning and Goals
Addis Ababa, Ethiopia
10th December 2014

EEA Ethiopian Energy Authority 1


Presentation Outline
• The Ethiopian energy policy
• GTP Goals, EE Goals
• The Energy proclamation
• What has been done by EEA
• Project based activities
• Challenges / successes
EEA Ethiopian Energy Authority 2
The Ethiopian energy policy

EEA Ethiopian Energy Authority 3


Rationale for the policy
• Ddevelop and utilize the country's energy
resources on the basis of overall
development strategy with introduction
of energy efficiency and conservation
strategy.
• support other economic sectors to meet
their development objectives
• save scare foreign exchange resources
and ensure efficient utilization of energy
EEA Ethiopian Energy Authority 4
Rationales cont……
• change the current energy production
and utilization practices
• formulate comprehensive energy
prices
• ascertain appropriate energy
technologies and equipment
• raise energy sector efficiency,
EEA Ethiopian Energy Authority 5
Policy Objectives
• ensure a reliable supply of energy at
affordable prices
• ensure and encourage a shift from
traditional to modern energy use.
• remove bottlenecks in the
development and utilization of energy.

EEA Ethiopian Energy Authority 6


Objectives cont…
• set general guidelines and strategies for
the development and supply of energy
• increase energy utilization efficiency and
reduce energy wastage;
• ensure the development and utilization
of energy

EEA Ethiopian Energy Authority 7


Main policy issues
I. Energy Resources Development
II. Energy supply
III. Energy Efficiency and Conservation
IV. Comprehensive Policy Measures
this policy is under review by the MoWIE

EEA Ethiopian Energy Authority 8


EE Goals
• Meet the demand by providing sufficient and reliable
power supply

• Increase per-capita consumption of electricity

• Produce sufficient electricity for export

• Increase electric power supply coverage

• Ensure a cost effective, high quality supply of energy,

EEA Ethiopian Energy Authority 9


GTP Goals
GTP I GTP II
• Reduce losses to 5% • Reach generation capacity of 10,000 Mw

• Biomass technology dissemination • Biomass technology dissemination

• Solar technology dissemination • Solar technology dissemination

• Study on small scale wind generation• Study on small scale wind generation

• Development of Mini & micro hydro • Development of Mini & micro hydro

• Alternative energy development • Alternative energy development

• Detailed study on geothermal

• EEA’s GTP II GOAL


Enabling saving of 1155 GWH energy
EEA Ethiopian Energy Authority 10
The Energy proclamation

EEA Ethiopian Energy Authority 11


Set National EE & C Strategies and Programs

• EEA develops and implement national EE & C


strategies and programs.
• It contains detailed economic evaluation, objectives
and measurable targets.

• review periodically the national EE & C strategies and


programs

• Designated industries and Buildings

EEA Ethiopian Energy Authority 12


EE & C Regulatory instruments
Set min EE performance standard
Certification of EA & EESCo
Labelling of electrical equipment and appliances
Set EE testing facility, capacity
Voluntary/mandatory agreement
Set EMU at Designate buildings & Industries
Collection and administering EE & C Fund

EEA Ethiopian Energy Authority 13


What has been done by EEA ?

EEA Ethiopian Energy Authority 14


What has been done on EE by EEA?
• Tax support for EE & renewable technology.
(CFL, LED, Solar …)

• Phasing out Incandescent

• Industrial EA (walkthrough & detail)

• Collection of consumption data.


Hotels, Schools , Hospitals and Government offices

EEA Ethiopian Energy Authority 15


Project based activities
1. “Demand Side management for climate
change adoption for the Ethiopian power
sector” by NCF
• Duration 18 months
• Study of consumption patterns for Industrial,
commercial and residential sectors
• Promotion (TV spots, Radio spots, print media)
• Report with 2 guidelines
• EA & EE abelling

EEA Ethiopian Energy Authority 16


Project based activities cont…..
2. Strategic Climate institution program “SCIP” by
DFID

• Duration 18 months (from Sept. 2013)


• Promotion (TV spots, Radio spots, print media)
• Procurement of EE test equipment
• Establishment of demo centres at regional states
• Development of strategy document
• Human Capacity building
EEA Ethiopian Energy Authority 17
E. Audits conducted
walkthrough audit
2011-2014 118 Ind. various types
Detailed Audit
2014 4 Ind. Steel, Cement, Textile & Sugar

Meter inspection
2012-2014 69 Ind. Various types
Follow up
2005 – 2006 14 Ind. Various types
2011-2013 28 Ind. Hotels, hospitals & offices 18
Results of Detailed Audit
Factory Appliances with high Yearly Saving Saving %
potentials of savings consumption potential
(MWhr) (MWhr)
• Kality Pump, Compressor
Steel Lighting 849 245 28.68
Industry Power factor corrector

• Fincha Pump, Compressor,


sugar Lighting, Boiler 79200 1086 0.4
factory Power factor corrector

• Muger Pump, Compressor


cement Lighting, Miller, preheater 59620 13538 22.71
Power factor corrector

• Bahirdar Pump, Compressor


textile Lighting, Boiler 27540 1706 6.20
Power factor corrector
EEA Ethiopian Energy Authority 19
Potential areas of saving as
observed from D.A
 Pumps

 Air Compressors

 Lighting system

 Power factor corrector

 Boilers

EEA Ethiopian Energy Authority 20


Challenges & successes during
implementation

EEA Ethiopian Energy Authority 21


Challenges
• Luck of public awareness on EE,

• Luck of energy data at the industries (fuel,…..)

• Import of inefficient technologies at low price

• Un affordable initial price of EE technologies,

• Insufficient institutional and human capacity


• Testing, verification, EA

• High manpower turnover (Technical staff)


EEA Ethiopian Energy Authority 22
successes
• Interests of industries for EA
• Dissemination of CFL
• Accomplishment of projects
• DSM & SCIP

• Establishment of EEA with additional duties


EE & C
• Policy support for EE
• Government commitment
EEA Ethiopian Energy Authority 23
EEA Ethiopian Energy Authority 24
Takele Mekonnen,
Director, Energy Efficiency & conservation Directorate
Ethiopian Energy Authority
takele2001@gmail.com

EEA Ethiopian Energy Authority 25


• Low power factor of industries
EEA took the imitative to aware the industries
the installation of PFC
• Phasing out Incandescent
EEA took the imitative
Dissemination of CFL
• Custom duty exemptions
 EE technologies & Renewable
Quality is not compromised
EEA Ethiopian Energy Authority 26
Determining potential for EE,
program, design & implementation
• Conduct a study on energy consumption
• The regulator determines the potential area
Labeling programs
 injera stove/pan Consuming 3 – 3.5Kw
Refrigerators
Washing machines
Air conditioners
Electric motors and transformers

EEA Ethiopian Energy Authority 27