Geometry Points Station K Crest / Sag

PVC Station: 19+762.60


118.104 Sag
PVT Station: 19+802.60
PVC Station: 19+823.69
26.716 Crest
PVT Station: 19+873.69
PVC Station: 19+963.94
63.809 Sag
PVT Station: 20+013.94
PVC Station: 20+097.31
46.303 Sag
PVT Station: 20+147.31
PVC Station: 20+254.35
55.308 Sag
PVT Station: 20+304.35
PVC Station: 20+323.90
108.716 Crest
PVT Station: 20+373.90
PVC Station: 20+598.12
53.064 Crest
PVT Station: 20+678.12
PVC Station: 20+724.37
21.933 Sag
PVT Station: 20+764.37
PVC Station: 20+817.30
98.521 Sag
PVT Station: 20+917.30
PVC Station: 20+950.53
121.800 Crest
PVT Station: 21+020.53
PVC Station: 21+058.31
45.935 Crest
PVT Station: 21+178.31
PVC Station: 21+238.09
59.796 Sag
PVT Station: 21+338.09
PVC Station: 21+350.69
12.083 Crest
PVT Station: 21+382.69
PVC Station: 21+388.11
19.852 Sag
PVT Station: 21+436.11
PVC Station: 21+473.02
26.431 Crest
PVT Station: 21+583.02
PVC Station: 21+704.63
58.020 Sag
PVT Station: 21+974.63
PVC Station: 22+047.00
57.615 Sag
PVT Station: 22+107.00
PVC Station: 22+300.00
18.010 Crest
PVT Station: 22+370.00
PVC Station: 22+375.00
58.588 Sag
PVT Station: 22+415.00
PVC Station: 22+600.44
30.609 Sag
PVT Station: 22+680.44
PVC Station: 22+687.00
57.773 Crest
PVT Station: 22+887.00
PVC Station: 22+977.00
20.623 Sag
PVT Station: 23+037.00
PVC Station: 23+139.00
55.873 Crest
PVT Station: 23+199.00
PVC Station: 23+240.67
19.994 Sag
PVT Station: 23+372.67
PVC Station: 23+373.09
11.977 Crest
PVT Station: 23+424.09
Geometry Points Station K Crest / Sag
PVC Station: 23+513.53
32.878 Crest
PVT Station: 23+613.53
Geometry Points Station K Crest / Sag
PVC Station: 23+645.60
10.853 Sag
PVT Station: 23+685.60
PVC Station: 23+687.50
13.086 Crest
PVT Station: 23+722.50
PVC Station: 23+899.00
53.735 Crest
PVT Station: 23+999.00
PVC Station: 24+206.00
22.746 Sag
PVT Station: 24+256.00
PVC Station: 24+687.00
120.897 Crest
PVT Station: 24+837.00
PVC Station: 24+943.00
84.892 Sag
PVT Station: 25+193.00
PVC Station: 25+407.78
35.181 Crest
PVT Station: 25+527.79
PVC Station: 25+815.67
32.306 Sag
PVT Station: 25+865.71
PVC Station: 26+064.54
251.477 Sag
PVT Station: 26+114.54
PVC Station: 26+731.00
134.334 Sag
PVT Station: 26+851.00
PVC Station: 26+882.00
54.805 Crest
PVT Station: 26+942.00
PVC Station: 27+064.00
186.364 Sag
PVT Station: 27+214.00
PVC Station: 27+252.00
152.946 Crest
PVT Station: 27+312.00
PVC Station: 27+483.00
30.457 Crest
PVT Station: 27+543.00
PVC Station: 27+596.00
38.101 Sag
PVT Station: 27+646.00
PVC Station: 27+762.00
51.441 Sag
PVT Station: 27+812.00
PVC Station: 27+960.00
270.644 Crest
PVT Station: 28+010.00
PVC Station: 28+149.16
18.991 Crest
PVT Station: 28+184.16
PVC Station: 28+186.00
26.652 Sag
PVT Station: 28+236.00
PVC Station: 28+352.00
44.046 Sag
PVT Station: 28+422.00
PVC Station: 28+457.00
39.549 Crest
PVT Station: 28+507.00
PVC Station: 28+677.00
72.364 Sag
PVT Station: 28+737.00
PVC Station: 28+995.48
74.140 Crest
PVT Station: 29+245.48
PVC Station: 29+396.00
39.975 Sag
PVT Station: 29+476.00
PVC Station: 29+546.15
117.779 Crest
PVT Station: 29+746.15
Geometry Points Station K Crest / Sag
PVC Station: 30+199.00
109.794 Sag
PVT Station: 30+259.00
Geometry Points Station K Crest / Sag
PVC Station: 30+313.00
75.746 Crest
PVT Station: 30+373.00
PVC Station: 30+492.00
26.171 Crest
PVT Station: 30+612.00
PVC Station: 30+684.00
25.260 Sag
PVT Station: 30+884.00
PVC Station: 30+963.21
12.027 Crest
PVT Station: 31+030.79
PVC Station: 31+043.00
28.146 Sag
PVT Station: 31+193.00
PVC Station: 31+286.50
64.514 Crest
PVT Station: 31+481.50
PVC Station: 31+542.00
23.299 Sag
PVT Station: 31+592.00
PVC Station: 31+670.00
41.362 Crest
PVT Station: 31+730.00
PVC Station: 31+770.00
58.066 Sag
PVT Station: 31+830.00
PVC Station: 31+995.00
184.860 Sag
PVT Station: 32+055.00
PVC Station: 32+349.00
284.645 Sag
PVT Station: 32+399.00
PVC Station: 32+688.00
66.503 Crest
PVT Station: 32+728.00
PVC Station: 33+113.00
150.986 Crest
PVT Station: 33+243.00
PVC Station: 33+289.00
83.557 Sag
PVT Station: 33+469.00
PVC Station: 33+575.00
107.725 Sag
PVT Station: 33+615.00
PVC Station: 33+712.00
130.980 Crest
PVT Station: 33+752.00
PVC Station: 33+929.00
48.471 Crest
PVT Station: 33+999.00
PVC Station: 34+266.00
955.415 Crest
PVT Station: 34+316.00
PVC Station: 34+477.24
112.847 Crest
PVT Station: 34+546.76
PVC Station: 34+670.00
187.083 Sag
PVT Station: 34+730.00
PVC Station: 34+995.00
186.461 Sag
PVT Station: 35+055.00
PVC Station: 35+420.00
73.928 Sag
PVT Station: 35+510.00
PVC Station: 35+750.00
53.953 Crest
PVT Station: 35+810.00
WIDENING/IMPROVEMENT AND RECONSTRUCTION OF ROAD FROM KHANI CROSS TO ZIARAT TO SINJAWI
PACKAGE-II ZIARAT SINAJWI
SUPERELEVATION DATA 21+750 TO 30+000

Shoulder Carriageway Carriageway Shoulder


Sr.No Chainage Description
L/S 2.500 L/S 3.650 R/S 3.650 R/S 2.500

Curve # 1 Deign Speed 80 km/h

1 21+750.00 Begin Alignment -4.00% -2.00% -2.00% -4.00%

2 21+712.22 End Normal Shoulder -4.00% -2.00% -2.00% -4.00%

3 21+726.56 End Normal Crown -4.00% -2.00% -2.00% -4.00%

4 21+740.89 Level Crown -4.00% -2.00% 0.00% -4.00%

5 21+755.22 Reverse Crown -4.00% -2.00% 2.00% -4.00%

6 21+769.56 Low Shoulder Match -4.00% -4.00% 4.00% -4.00%

7 21+783.89 Begin Full Super -6.00% -6.00% 6.00% -4.00%

8 21+847.72 End Full Super -6.00% -6.00% 6.00% -4.00%

9 21+862.05 Low Shoulder Match -4.00% -4.00% 4.00% -4.00%

10 21+876.38 Reverse Crown -4.00% -2.00% 2.00% -4.00%

11 21+890.72 Level Crown -4.00% -2.00% 0.00% -4.00%

Curve # 2 Deign Speed 80 km/h

12 21+932.58 Level Crown -4.00% 0.00% -2.00% -4.00%

13 21+947.17 Reverse Crown -4.00% 2.00% -2.00% -4.00%

14 21+961.75 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%

15 21+967.58 Begin Full Super -4.00% 4.80% -4.80% -4.80%

16 21+988.07 End Full Super -4.00% 4.80% -4.80% -4.80%

17 21+993.90 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%

18 22+008.49 Reverse Crown -4.00% 2.00% -2.00% -4.00%

19 22+023.07 Level Crown -4.00% 0.00% -2.00% -4.00%

20 22+037.65 Begin Normal Crown -4.00% -2.00% -2.00% -4.00%

21 22+052.24 Begin Normal Shoulder -4.00% -2.00% -2.00% -4.00%

Curve # 3 Deign Speed 80 km/h

22 22+124.66 End Normal Shoulder -4.00% -2.00% -2.00% -4.00%

23 22+139.24 End Normal Crown -4.00% -2.00% -2.00% -4.00%

24 22+153.82 Level Crown -4.00% 0.00% -2.00% -4.00%

25 22+168.41 Reverse Crown -4.00% 2.00% -2.00% -4.00%


WIDENING/IMPROVEMENT AND RECONSTRUCTION OF ROAD FROM KHANI CROSS TO ZIARAT TO SINJAWI
PACKAGE-II ZIARAT SINAJWI
SUPERELEVATION DATA 21+750 TO 30+000

Shoulder Carriageway Carriageway Shoulder


Sr.No Chainage Description
L/S 2.500 L/S 3.650 R/S 3.650 R/S 2.500

26 22+182.99 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%

27 22+188.82 Begin Full Super -4.00% 4.80% -4.80% -4.80%

28 22+216.17 End Full Super -4.00% 4.80% -4.80% -4.80%

29 22+222.01 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%

30 22+236.59 Reverse Crown -4.00% 2.00% -2.00% -4.00%

31 22+251.17 Level Crown -4.00% 0.00% -2.00% -4.00%

32 22+265.76 Begin Normal Crown -4.00% -2.00% -2.00% -4.00%

33 22+280.34 Begin Normal Shoulder -4.00% -2.00% -2.00% -4.00%

Curve # 4 Deign Speed 80 km/h

34 22+357.87 End Normal Shoulder -4.00% -2.00% -2.00% -4.00%

35 22+371.87 End Normal Crown -4.00% -2.00% -2.00% -4.00%

36 22+385.87 Level Crown -4.00% -2.00% 0.00% -4.00%

37 22+399.87 Begin Full Super -4.00% -2.00% 2.00% -4.00%

38 22+399.87 Reverse Crown -4.00% -2.00% 2.00% -4.00%

39 22+418.53 End Full Super -4.00% -2.00% 2.00% -4.00%

40 22+418.53 Reverse Crown -4.00% -2.00% 2.00% -4.00%

41 22+432.53 Level Crown -4.00% -2.00% 0.00% -4.00%

42 22+446.53 Begin Normal Crown -4.00% -2.00% -2.00% -4.00%

43 22+460.53 Begin Normal Shoulder -4.00% -2.00% -2.00% -4.00%

Curve # 5 Deign Speed 80 km/h

44 22+524.09 End Normal Shoulder -4.00% -2.00% -2.00% -4.00%

45 22+538.43 End Normal Crown -4.00% -2.00% -2.00% -4.00%

46 22+552.76 Level Crown -4.00% 0.00% -2.00% -4.00%

47 22+567.09 Reverse Crown -4.00% 2.00% -2.00% -4.00%

48 22+581.43 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%

49 22+595.76 Begin Full Super -4.00% 6.00% -6.00% -6.00%

50 22+603.83 End Full Super -4.00% 6.00% -6.00% -6.00%

Curve # 6 Deign Speed 80 km/h


WIDENING/IMPROVEMENT AND RECONSTRUCTION OF ROAD FROM KHANI CROSS TO ZIARAT TO SINJAWI
PACKAGE-II ZIARAT SINAJWI
SUPERELEVATION DATA 21+750 TO 30+000

Shoulder Carriageway Carriageway Shoulder


Sr.No Chainage Description
L/S 2.500 L/S 3.650 R/S 3.650 R/S 2.500

51 22+687.72 Begin Full Super -4.00% -2.00% 2.00% -4.00%

52 22+687.72 Reverse Crown -4.00% -2.00% 2.00% -4.00%

53 22+736.80 End Full Super -4.00% -2.00% 2.00% -4.00%

54 22+736.80 Reverse Crown -4.00% -2.00% 2.00% -4.00%

55 22+750.80 Level Crown -4.00% -2.00% 0.00% -4.00%

56 22+764.80 Begin Normal Crown -4.00% -2.00% -2.00% -4.00%

57 22+778.80 Begin Normal Shoulder -4.00% -2.00% -2.00% -4.00%

Curve # 7 Deign Speed 80 km/h

58 22+800.00 End Normal Shoulder -4.00% -2.00% -2.00% -4.00%

59 22+814.59 End Normal Crown -4.00% -2.00% -2.00% -4.00%

60 22+829.17 Level Crown -4.00% 0.00% -2.00% -4.00%

61 22+843.75 Reverse Crown -4.00% 2.00% -2.00% -4.00%

62 22+858.34 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%

63 22+864.17 Begin Full Super -4.00% 4.80% -4.80% -4.80%

64 22+889.30 End Full Super -4.00% 4.80% -4.80% -4.80%

65 22+895.13 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%

66 22+909.72 Reverse Crown -4.00% 2.00% -2.00% -4.00%

67 22+924.30 Level Crown -4.00% 0.00% -2.00% -4.00%

68 22+938.88 Begin Normal Crown -4.00% -2.00% -2.00% -4.00%

69 22+953.47 Begin Normal Shoulder -4.00% -2.00% -2.00% -4.00%

Curve # 8 Deign Speed 80 km/h

70 22+969.25 End Normal Shoulder -4.00% -2.00% -2.00% -4.00%

71 22+983.83 End Normal Crown -4.00% -2.00% -2.00% -4.00%

72 22+998.42 Level Crown -4.00% -2.00% 0.00% -4.00%

73 23+013.00 Reverse Crown -4.00% -2.00% 2.00% -4.00%

74 23+027.58 Low Shoulder Match -4.00% -4.00% 4.00% -4.00%

75 23+033.42 Begin Full Super -4.80% -4.80% 4.80% -4.00%

76 23+061.08 End Full Super -4.80% -4.80% 4.80% -4.00%


WIDENING/IMPROVEMENT AND RECONSTRUCTION OF ROAD FROM KHANI CROSS TO ZIARAT TO SINJAWI
PACKAGE-II ZIARAT SINAJWI
SUPERELEVATION DATA 21+750 TO 30+000

Shoulder Carriageway Carriageway Shoulder


Sr.No Chainage Description
L/S 2.500 L/S 3.650 R/S 3.650 R/S 2.500

77 23+066.92 Low Shoulder Match -4.00% -4.00% 4.00% -4.00%

78 23+081.50 Reverse Crown -4.00% -2.00% 2.00% -4.00%

79 23+096.08 Level Crown -4.00% -2.00% 0.00% -4.00%

80 23+110.67 Begin Normal Crown -4.00% -2.00% -2.00% -4.00%

81 23+125.25 Begin Normal Shoulder -4.00% -2.00% -2.00% -4.00%

Curve # 9 Deign Speed 80 km/h

82 23+196.38 End Normal Shoulder -4.00% -2.00% -2.00% -4.00%

83 23+210.71 End Normal Crown -4.00% -2.00% -2.00% -4.00%

84 23+225.04 Level Crown -4.00% 0.00% -2.00% -4.00%

85 23+239.38 Reverse Crown -4.00% 2.00% -2.00% -4.00%

86 23+253.71 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%

87 23+268.04 Begin Full Super -4.00% 6.00% -6.00% -6.00%

88 23+278.26 End Full Super -4.00% 6.00% -6.00% -6.00%

89 23+292.59 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%

90 23+306.93 Reverse Crown -4.00% 2.00% -2.00% -4.00%

91 23+321.26 Level Crown -4.00% 0.00% -2.00% -4.00%

92 23+335.59 Begin Normal Crown -4.00% -2.00% -2.00% -4.00%

93 23+349.93 Begin Normal Shoulder -4.00% -2.00% -2.00% -4.00%

Curve # 10 Deign Speed 80 km/h

94 23+376.70 End Normal Shoulder -4.00% -2.00% -2.00% -4.00%

95 23+391.03 End Normal Crown -4.00% -2.00% -2.00% -4.00%

96 23+405.36 Level Crown -4.00% 0.00% -2.00% -4.00%

97 23+419.70 Reverse Crown -4.00% 2.00% -2.00% -4.00%

98 23+434.03 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%

99 23+448.36 Begin Full Super -4.00% 6.00% -6.00% -6.00%

100 23+456.09 End Full Super -4.00% 6.00% -6.00% -6.00%

Curve # 11 Deign Speed 80 km/h

101 23+536.42 Begin Full Super -4.80% -4.80% 4.80% -4.00%


WIDENING/IMPROVEMENT AND RECONSTRUCTION OF ROAD FROM KHANI CROSS TO ZIARAT TO SINJAWI
PACKAGE-II ZIARAT SINAJWI
SUPERELEVATION DATA 21+750 TO 30+000

Shoulder Carriageway Carriageway Shoulder


Sr.No Chainage Description
L/S 2.500 L/S 3.650 R/S 3.650 R/S 2.500

102 23+654.51 End Full Super -4.80% -4.80% 4.80% -4.00%

103 23+660.34 Low Shoulder Match -4.00% -4.00% 4.00% -4.00%

104 23+674.93 Reverse Crown -4.00% -2.00% 2.00% -4.00%

105 23+689.51 Level Crown -4.00% -2.00% 0.00% -4.00%

106 23+704.09 Begin Normal Crown -4.00% -2.00% -2.00% -4.00%

Curve # 12 Deign Speed 80 km/h

107 23+722.71 End Normal Crown -4.00% -2.00% -2.00% -4.00%

108 23+737.05 Level Crown -4.00% 0.00% -2.00% -4.00%

109 23+751.38 Reverse Crown -4.00% 2.00% -2.00% -4.00%

110 23+765.71 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%

111 23+780.05 Begin Full Super -4.00% 6.00% -6.00% -6.00%

112 23+911.02 End Full Super -4.00% 6.00% -6.00% -6.00%

113 23+925.35 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%

114 23+939.68 Reverse Crown -4.00% 2.00% -2.00% -4.00%

115 23+954.02 Level Crown -4.00% 0.00% -2.00% -4.00%

116 23+968.35 Begin Normal Crown -4.00% -2.00% -2.00% -4.00%

Curve # 13 Deign Speed 80 km/h

117 23+989.67 End Normal Crown -4.00% -2.00% -2.00% -4.00%

118 24+004.00 Level Crown -4.00% 0.00% -2.00% -4.00%

119 24+018.34 Reverse Crown -4.00% 2.00% -2.00% -4.00%

120 24+032.67 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%

121 24+039.38 End Full Super -4.00% 6.00% -6.00% -6.00%

122 24+047.00 Begin Full Super -4.00% 6.00% -6.00% -6.00%

Curve # 14 Deign Speed 80 km/h

123 24+133.35 Begin Full Super -6.00% -6.00% 6.00% -4.00%

124 24+135.21 End Full Super -6.00% -6.00% 6.00% -4.00%

125 24+149.54 Low Shoulder Match -4.00% -4.00% 4.00% -4.00%

126 24+163.88 Reverse Crown -4.00% -2.00% 2.00% -4.00%


WIDENING/IMPROVEMENT AND RECONSTRUCTION OF ROAD FROM KHANI CROSS TO ZIARAT TO SINJAWI
PACKAGE-II ZIARAT SINAJWI
SUPERELEVATION DATA 21+750 TO 30+000

Shoulder Carriageway Carriageway Shoulder


Sr.No Chainage Description
L/S 2.500 L/S 3.650 R/S 3.650 R/S 2.500

127 24+178.21 Level Crown -4.00% -2.00% 0.00% -4.00%

128 24+192.54 Begin Normal Crown -4.00% -2.00% -2.00% -4.00%

129 24+206.88 Begin Normal Shoulder -4.00% -2.00% -2.00% -4.00%

Curve # 15 Deign Speed 80 km/h

130 24+433.26 End Normal Shoulder -4.00% -2.00% -2.00% -4.00%

131 24+447.59 End Normal Crown -4.00% -2.00% -2.00% -4.00%

132 24+461.93 Level Crown -4.00% -2.00% 0.00% -4.00%

133 24+476.26 Reverse Crown -4.00% -2.00% 2.00% -4.00%

134 24+490.59 Low Shoulder Match -4.00% -4.00% 4.00% -4.00%

135 24+504.93 Begin Full Super -6.00% -6.00% 6.00% -4.00%

136 24+524.94 End Full Super -6.00% -6.00% 6.00% -4.00%

Curve # 16 Deign Speed 80 km/h

137 24+616.03 Begin Full Super -4.00% 6.00% -6.00% -6.00%

138 24+644.71 End Full Super -4.00% 6.00% -6.00% -6.00%

139 24+659.04 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%

140 24+673.38 Reverse Crown -4.00% 2.00% -2.00% -4.00%

141 24+687.71 Level Crown -4.00% 0.00% -2.00% -4.00%

142 24+702.04 Begin Normal Crown -4.00% -2.00% -2.00% -4.00%

143 24+716.38 Begin Normal Shoulder -4.00% -2.00% -2.00% -4.00%

Curve # 17 Deign Speed 80 km/h

145 24+945.25 End Normal Shoulder -4.00% -2.00% -2.00% -4.00%

146 24+959.25 End Normal Crown -4.00% -2.00% -2.00% -4.00%

147 24+973.25 Level Crown -4.00% 0.00% -2.00% -4.00%

148 24+987.25 Begin Full Super -4.00% 2.00% -2.00% -4.00%

149 24+987.25 Reverse Crown -4.00% 2.00% -2.00% -4.00%

150 25+017.98 End Full Super -4.00% 2.00% -2.00% -4.00%

151 25+017.98 Reverse Crown -4.00% 2.00% -2.00% -4.00%

152 25+031.98 Level Crown -4.00% 0.00% -2.00% -4.00%


WIDENING/IMPROVEMENT AND RECONSTRUCTION OF ROAD FROM KHANI CROSS TO ZIARAT TO SINJAWI
PACKAGE-II ZIARAT SINAJWI
SUPERELEVATION DATA 21+750 TO 30+000

Shoulder Carriageway Carriageway Shoulder


Sr.No Chainage Description
L/S 2.500 L/S 3.650 R/S 3.650 R/S 2.500

153 25+045.98 Begin Normal Crown -4.00% -2.00% -2.00% -4.00%

154 25+059.98 Begin Normal Shoulder -4.00% -2.00% -2.00% -4.00%

Curve # 18 Deign Speed 80 km/h

155 25+132.99 End Normal Shoulder -4.00% -2.00% -2.00% -4.00%

156 25+147.58 End Normal Crown -4.00% -2.00% -2.00% -4.00%

157 25+162.16 Level Crown -4.00% -2.00% 0.00% -4.00%

158 25+176.74 Reverse Crown -4.00% -2.00% 2.00% -4.00%

159 25+191.33 Low Shoulder Match -4.00% -4.00% 4.00% -4.00%

160 25+197.16 Begin Full Super -4.80% -4.80% 4.80% -4.00%

161 25+210.04 End Full Super -4.80% -4.80% 4.80% -4.00%

Curve # 19 Deign Speed 80 km/h

162 25+282.95 Begin Full Super -4.00% 4.80% -4.80% -4.80%

163 25+293.14 End Full Super -4.00% 4.80% -4.80% -4.80%

164 25+298.97 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%

165 25+313.55 Reverse Crown -4.00% 2.00% -2.00% -4.00%

166 25+328.14 Level Crown -4.00% 0.00% -2.00% -4.00%

167 25+342.72 Begin Normal Crown -4.00% -2.00% -2.00% -4.00%

168 25+357.30 Begin Normal Shoulder -4.00% -2.00% -2.00% -4.00%

Curve # 20 Deign Speed 80 km/h

169 25+492.39 End Normal Shoulder -4.00% -2.00% -2.00% -4.00%

170 25+506.39 End Normal Crown -4.00% -2.00% -2.00% -4.00%

171 25+520.39 Level Crown -4.00% -2.00% 0.00% -4.00%

172 25+534.39 Begin Full Super -4.00% -2.00% 2.00% -4.00%

173 25+534.39 Reverse Crown -4.00% -2.00% 2.00% -4.00%

174 25+566.99 End Full Super -4.00% -2.00% 2.00% -4.00%

175 25+566.99 Reverse Crown -4.00% -2.00% 2.00% -4.00%

176 25+580.99 Level Crown -4.00% -2.00% 0.00% -4.00%

177 25+594.99 Begin Normal Crown -4.00% -2.00% -2.00% -4.00%


WIDENING/IMPROVEMENT AND RECONSTRUCTION OF ROAD FROM KHANI CROSS TO ZIARAT TO SINJAWI
PACKAGE-II ZIARAT SINAJWI
SUPERELEVATION DATA 21+750 TO 30+000

Shoulder Carriageway Carriageway Shoulder


Sr.No Chainage Description
L/S 2.500 L/S 3.650 R/S 3.650 R/S 2.500

178 25+608.99 Begin Normal Shoulder -4.00% -2.00% -2.00% -4.00%

Curve # 21 Deign Speed 80 km/h

179 25+696.81 End Normal Shoulder -4.00% -2.00% -2.00% -4.00%

180 25+711.15 End Normal Crown -4.00% -2.00% -2.00% -4.00%

181 25+725.48 Level Crown -4.00% 0.00% -2.00% -4.00%

182 25+739.81 Reverse Crown -4.00% 2.00% -2.00% -4.00%

183 25+754.15 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%

184 25+768.48 Begin Full Super -4.00% 6.00% -6.00% -6.00%

185 25+821.06 End Full Super -4.00% 6.00% -6.00% -6.00%

Curve # 22 Deign Speed 80 km/h

186 25+899.97 Begin Full Super -6.00% -6.00% 6.00% -4.00%

187 25+971.45 End Full Super -6.00% -6.00% 6.00% -4.00%

Curve # 23 Deign Speed 80 km/h

188 26+072.46 Begin Full Super -4.00% 4.80% -4.80% -4.80%

189 26+091.09 End Full Super -4.00% 4.80% -4.80% -4.80%

190 26+096.93 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%

191 26+111.51 Reverse Crown -4.00% 2.00% -2.00% -4.00%

192 26+126.09 Level Crown -4.00% 0.00% -2.00% -4.00%

193 26+140.68 Begin Normal Crown -4.00% -2.00% -2.00% -4.00%

194 26+155.26 Begin Normal Shoulder -4.00% -2.00% -2.00% -4.00%

Curve # 24 Deign Speed 80 km/h

195 26+419.08 End Normal Shoulder -4.00% -2.00% -2.00% -4.00%

196 26+433.41 End Normal Crown -4.00% -2.00% -2.00% -4.00%

197 26+447.75 Level Crown -4.00% -2.00% 0.00% -4.00%

198 26+462.08 Reverse Crown -4.00% -2.00% 2.00% -4.00%

199 26+476.41 Low Shoulder Match -4.00% -4.00% 4.00% -4.00%

200 26+490.75 Begin Full Super -6.00% -6.00% 6.00% -4.00%

201 26+555.56 End Full Super -6.00% -6.00% 6.00% -4.00%


WIDENING/IMPROVEMENT AND RECONSTRUCTION OF ROAD FROM KHANI CROSS TO ZIARAT TO SINJAWI
PACKAGE-II ZIARAT SINAJWI
SUPERELEVATION DATA 21+750 TO 30+000

Shoulder Carriageway Carriageway Shoulder


Sr.No Chainage Description
L/S 2.500 L/S 3.650 R/S 3.650 R/S 2.500

202 26+569.90 Low Shoulder Match -4.00% -4.00% 4.00% -4.00%

203 26+584.23 Reverse Crown -4.00% -2.00% 2.00% -4.00%

204 26+598.56 Level Crown -4.00% -2.00% 0.00% -4.00%

205 26+612.90 Begin Normal Crown -4.00% -2.00% -2.00% -4.00%

Curve # 25 Deign Speed 80 km/h

206 26+635.29 End Normal Crown -4.00% -2.00% -2.00% -4.00%

207 26+649.62 Level Crown -4.00% 0.00% -2.00% -4.00%

208 26+663.95 Reverse Crown -4.00% 2.00% -2.00% -4.00%

209 26+678.29 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%

210 26+685.30 End Full Super -4.00% 6.00% -6.00% -6.00%

211 26+692.62 Begin Full Super -4.00% 6.00% -6.00% -6.00%

Curve # 26 Deign Speed 80 km/h

212 26+771.88 Begin Full Super -6.00% -6.00% 6.00% -4.00%

213 26+775.13 End Full Super -6.00% -6.00% 6.00% -4.00%

214 26+789.46 Low Shoulder Match -4.00% -4.00% 4.00% -4.00%

215 26+803.80 Reverse Crown -4.00% -2.00% 2.00% -4.00%

216 26+818.13 Level Crown -4.00% -2.00% 0.00% -4.00%

Curve # 27 Deign Speed 80 km/h

217 26+860.16 Level Crown -4.00% 0.00% -2.00% -4.00%

218 26+874.49 Reverse Crown -4.00% 2.00% -2.00% -4.00%

219 26+888.82 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%

220 26+903.16 Begin Full Super -4.00% 6.00% -6.00% -6.00%

221 26+903.89 End Full Super -4.00% 6.00% -6.00% -6.00%

222 26+918.22 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%

223 26+932.55 Reverse Crown -4.00% 2.00% -2.00% -4.00%

224 26+946.89 Level Crown -4.00% 0.00% -2.00% -4.00%

225 26+961.22 Begin Normal Crown -4.00% -2.00% -2.00% -4.00%

226 26+975.55 Begin Normal Shoulder -4.00% -2.00% -2.00% -4.00%


WIDENING/IMPROVEMENT AND RECONSTRUCTION OF ROAD FROM KHANI CROSS TO ZIARAT TO SINJAWI
PACKAGE-II ZIARAT SINAJWI
SUPERELEVATION DATA 21+750 TO 30+000

Shoulder Carriageway Carriageway Shoulder


Sr.No Chainage Description
L/S 2.500 L/S 3.650 R/S 3.650 R/S 2.500

Curve # 28 Deign Speed 80 km/h

227 27+035.95 End Normal Shoulder -4.00% -2.00% -2.00% -4.00%

228 27+050.53 End Normal Crown -4.00% -2.00% -2.00% -4.00%

229 27+065.12 Level Crown -4.00% -2.00% 0.00% -4.00%

230 27+079.70 Reverse Crown -4.00% -2.00% 2.00% -4.00%

231 27+094.28 Low Shoulder Match -4.00% -4.00% 4.00% -4.00%

232 27+100.12 Begin Full Super -4.80% -4.80% 4.80% -4.00%

233 27+305.94 End Full Super -4.80% -4.80% 4.80% -4.00%

234 27+311.78 Low Shoulder Match -4.00% -4.00% 4.00% -4.00%

235 27+326.36 Reverse Crown -4.00% -2.00% 2.00% -4.00%

236 27+340.94 Level Crown -4.00% -2.00% 0.00% -4.00%

237 27+355.53 Begin Normal Crown -4.00% -2.00% -2.00% -4.00%

238 27+370.11 Begin Normal Shoulder -4.00% -2.00% -2.00% -4.00%

Curve # 29 Deign Speed 80 km/h

239 27+374.51 End Normal Shoulder -4.00% -2.00% -2.00% -4.00%

240 27+388.84 End Normal Crown -4.00% -2.00% -2.00% -4.00%

241 27+403.18 Level Crown -4.00% 0.00% -2.00% -4.00%

242 27+417.51 Reverse Crown -4.00% 2.00% -2.00% -4.00%

243 27+431.84 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%

244 27+446.18 Begin Full Super -4.00% 6.00% -6.00% -6.00%

245 27+520.96 End Full Super -4.00% 6.00% -6.00% -6.00%

246 27+535.29 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%

247 27+549.63 Reverse Crown -4.00% 2.00% -2.00% -4.00%

248 27+563.96 Level Crown -4.00% 0.00% -2.00% -4.00%

Curve # 30 Deign Speed 80 km/h

249 27+593.83 Level Crown -4.00% -2.00% 0.00% -4.00%

250 27+608.41 Reverse Crown -4.00% -2.00% 2.00% -4.00%

251 27+622.99 Low Shoulder Match -4.00% -4.00% 4.00% -4.00%


WIDENING/IMPROVEMENT AND RECONSTRUCTION OF ROAD FROM KHANI CROSS TO ZIARAT TO SINJAWI
PACKAGE-II ZIARAT SINAJWI
SUPERELEVATION DATA 21+750 TO 30+000

Shoulder Carriageway Carriageway Shoulder


Sr.No Chainage Description
L/S 2.500 L/S 3.650 R/S 3.650 R/S 2.500

252 27+628.83 Begin Full Super -4.80% -4.80% 4.80% -4.00%

253 27+808.02 End Full Super -4.80% -4.80% 4.80% -4.00%

Curve # 31 Deign Speed 80 km/h

254 27+850.78 Begin Full Super -4.80% -4.80% 4.80% -4.00%

255 28+007.33 End Full Super -4.80% -4.80% 4.80% -4.00%

256 28+013.17 Low Shoulder Match -4.00% -4.00% 4.00% -4.00%

257 28+027.75 Reverse Crown -4.00% -2.00% 2.00% -4.00%

258 28+042.33 Level Crown -4.00% -2.00% 0.00% -4.00%

259 28+056.92 Begin Normal Crown -4.00% -2.00% -2.00% -4.00%

260 28+071.50 Begin Normal Shoulder -4.00% -2.00% -2.00% -4.00%

Curve # 32 Deign Speed 80 km/h

261 28+098.21 End Normal Shoulder -4.00% -2.00% -2.00% -4.00%

262 28+112.44 End Normal Crown -4.00% -2.00% -2.00% -4.00%

263 28+126.67 Level Crown -4.00% 0.00% -2.00% -4.00%

264 28+140.90 Reverse Crown -4.00% 2.00% -2.00% -4.00%

265 28+155.13 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%

266 28+163.67 Begin Full Super -4.00% 5.20% -5.20% -5.20%

267 28+245.33 End Full Super -4.00% 5.20% -5.20% -5.20%

Curve # 33 Deign Speed 80 km/h

268 28+322.40 Begin Full Super -6.00% -6.00% 6.00% -4.00%

269 28+350.99 End Full Super -6.00% -6.00% 6.00% -4.00%

270 28+365.32 Low Shoulder Match -4.00% -4.00% 4.00% -4.00%

271 28+379.66 Reverse Crown -4.00% -2.00% 2.00% -4.00%

272 28+393.99 Level Crown -4.00% -2.00% 0.00% -4.00%

273 28+408.32 Begin Normal Crown -4.00% -2.00% -2.00% -4.00%

274 28+422.66 Begin Normal Shoulder -4.00% -2.00% -2.00% -4.00%

Curve # 34 Deign Speed 80 km/h

275 28+510.51 End Normal Shoulder -4.00% -2.00% -2.00% -4.00%


WIDENING/IMPROVEMENT AND RECONSTRUCTION OF ROAD FROM KHANI CROSS TO ZIARAT TO SINJAWI
PACKAGE-II ZIARAT SINAJWI
SUPERELEVATION DATA 21+750 TO 30+000

Shoulder Carriageway Carriageway Shoulder


Sr.No Chainage Description
L/S 2.500 L/S 3.650 R/S 3.650 R/S 2.500

276 28+524.85 End Normal Crown -4.00% -2.00% -2.00% -4.00%

277 28+539.18 Level Crown -4.00% 0.00% -2.00% -4.00%

278 28+553.51 Reverse Crown -4.00% 2.00% -2.00% -4.00%

279 28+567.85 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%

280 28+582.18 Begin Full Super -4.00% 6.00% -6.00% -6.00%

281 28+634.05 End Full Super -4.00% 6.00% -6.00% -6.00%

Curve # 35 Deign Speed 80 km/h

282 28+725.77 Begin Full Super -4.00% -3.20% 3.20% 3.20%

283 28+756.85 End Full Super -4.00% -3.20% 3.20% 3.20%

Curve # 36 Deign Speed 80 km/h

284 28+844.81 Begin Full Super -4.00% 5.20% -5.20% -5.20%

285 28+887.11 End Full Super -4.00% 5.20% -5.20% -5.20%

286 28+895.65 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%

287 28+909.88 Reverse Crown -4.00% 2.00% -2.00% -4.00%

288 28+924.11 Level Crown -4.00% 0.00% -2.00% -4.00%

289 28+938.34 Begin Normal Crown -4.00% -2.00% -2.00% -4.00%

Curve # 37 Deign Speed 80 km/h

290 28+955.60 End Normal Crown -4.00% -2.00% -2.00% -4.00%

291 28+969.81 Level Crown -4.00% -2.00% 0.00% -4.00%

292 28+984.02 Reverse Crown -4.00% -2.00% 2.00% -4.00%

293 28+996.81 Begin Full Super -4.00% -3.80% 3.80% -4.00%

294 29+168.30 End Full Super -4.00% -3.80% 3.80% -4.00%

295 29+181.09 Reverse Crown -4.00% -2.00% 2.00% -4.00%

296 29+195.30 Level Crown -4.00% -2.00% 0.00% -4.00%

297 29+209.51 Begin Normal Crown -4.00% -2.00% -2.00% -4.00%

298 29+223.72 Begin Normal Shoulder -4.00% -2.00% -2.00% -4.00%

Curve # 38 Deign Speed 80 km/h

299 29+351.29 End Normal Shoulder -4.00% -2.00% -2.00% -4.00%


WIDENING/IMPROVEMENT AND RECONSTRUCTION OF ROAD FROM KHANI CROSS TO ZIARAT TO SINJAWI
PACKAGE-II ZIARAT SINAJWI
SUPERELEVATION DATA 21+750 TO 30+000

Shoulder Carriageway Carriageway Shoulder


Sr.No Chainage Description
L/S 2.500 L/S 3.650 R/S 3.650 R/S 2.500

300 29+365.29 End Normal Crown -4.00% -2.00% -2.00% -4.00%

301 29+379.29 Level Crown -4.00% -2.00% 0.00% -4.00%

302 29+393.29 Begin Full Super -4.00% -2.00% 2.00% -4.00%

303 29+393.29 Reverse Crown -4.00% -2.00% 2.00% -4.00%

304 29+438.69 End Full Super -4.00% -2.00% 2.00% -4.00%

305 29+438.69 Reverse Crown -4.00% -2.00% 2.00% -4.00%

306 29+452.69 Level Crown -4.00% -2.00% 0.00% -4.00%

307 29+466.69 Begin Normal Crown -4.00% -2.00% -2.00% -4.00%

308 29+480.69 Begin Normal Shoulder -4.00% -2.00% -2.00% -4.00%

Curve # 39 Deign Speed 80 km/h

309 29+738.91 End Normal Shoulder -4.00% -2.00% -2.00% -4.00%

310 29+753.50 End Normal Crown -4.00% -2.00% -2.00% -4.00%

311 29+768.08 Level Crown -4.00% 0.00% -2.00% -4.00%

312 29+782.66 Reverse Crown -4.00% 2.00% -2.00% -4.00%

313 29+797.25 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%

314 29+803.08 Begin Full Super -4.00% 4.80% -4.80% -4.80%

315 29+833.15 End Full Super -4.00% 4.80% -4.80% -4.80%

316 29+838.98 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%

317 29+853.56 Reverse Crown -4.00% 2.00% -2.00% -4.00%

318 29+868.15 Level Crown -4.00% 0.00% -2.00% -4.00%

319 29+882.73 Begin Normal Crown -4.00% -2.00% -2.00% -4.00%

320 29+897.31 Begin Normal Shoulder -4.00% -2.00% -2.00% -4.00%

Curve # 40 Deign Speed 80 km/h

321 29+911.50 End Normal Shoulder -4.00% -2.00% -2.00% -4.00%

322 29+925.83 End Normal Crown -4.00% -2.00% -2.00% -4.00%

323 29+940.17 Level Crown -4.00% 0.00% -2.00% -4.00%

324 29+954.50 Reverse Crown -4.00% 2.00% -2.00% -4.00%

325 29+968.83 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%


WIDENING/IMPROVEMENT AND RECONSTRUCTION OF ROAD FROM KHANI CROSS TO ZIARAT TO SINJAWI
PACKAGE-II ZIARAT SINAJWI
SUPERELEVATION DATA 21+750 TO 30+000

Shoulder Carriageway Carriageway Shoulder


Sr.No Chainage Description
L/S 2.500 L/S 3.650 R/S 3.650 R/S 2.500

326 29+970.42 End Full Super -4.00% 6.00% -6.00% -6.00%

327 29+983.17 Begin Full Super -4.00% 6.00% -6.00% -6.00%

328 29+984.75 Low Shoulder Match -4.00% 4.00% -4.00% -4.00%

329 29+999.09 Reverse Crown -4.00% 2.00% -2.00% -4.00%

330 30+013.42 Level Crown -4.00% 0.00% -2.00% -4.00%

331 30+027.75 Begin Normal Crown -4.00% -2.00% -2.00% -4.00%

332 30+042.09 Begin Normal Shoulder -4.00% -2.00% -2.00% -4.00%

333 29+996.78 End Alignment -4.00% -2.00% -2.00% -4.00%


57.3299999999981 43.00 14.3299999999981

28.6666666666667

42.9966666666648

85.9933333333296
21955.920
Curve 500 43.814 3.6
21999.734
Tangent 177.426
22177.160
Curve 500 50.681 3.6
22227.841
Tangent 167.359
22395.200
Curve 2000 28 RC
22423.200
Tangent 158.228
22581.428
Curve 125 36.73 6
22618.158
Tangent 64.901
22683.059
Curve 2000 58.403 RC
22741.462
Tangent 111.045
22852.507
Curve 500 48.457 3.6
22900.964
Tangent 120.789
23021.753
Curve 500 50.996 3.6
23072.749
Tangent 180.964
23253.713
Curve 180 38.88 5.6
23292.593
Tangent 141.437
23434.030
Curve 125 36.391 6
23470.421
Tangent 54.339
23524.760
Curve 500 141.415 3.6
23666.175
Tangent 99.539
23765.714
Curve 300 159.636 4.6
23925.350
Tangent 107.32
Tangent 107.32
24032.670
Curve 125 21.045 6
24053.715
Tangent 47.925
24101.640
Curve 180 64.649 5.6
24166.289
Tangent 116.85
24283.139
Curve 125 42.46 6
24325.599
Tangent 157.712
24483.311
Curve 150 71.196 6
24554.507
Tangent 50.7
24605.207
Curve 250 57.342 6
24662.549
Tangent 323.55
24986.099
Curve 2000 40.044 RC
25026.143
Tangent 162.86
25189.003
Curve 500 36.203 4.8
25225.206
Tangent 49.584
25274.790
Curve 500 33.517 4.8
25308.307
Tangent 224.924
25533.231
Curve 2000 41.926 RC
25575.157
Tangent 182.498
25757.655
Curve 300 81.247 6
25838.902
Tangent 50.246
25889.148
Curve 250 100.136 6
25989.284
Tangent 75.02
26064.304
Curve 500 41.963 4.8
26106.267
Tangent 373.653
26479.920
Curve 300 93.481 6
26573.401
Tangent 108.394
26681.795
Curve 125 21.339 6
26703.134
Tangent 57.925
26761.059
Curve 125 31.909 6
26792.968
Tangent 99.362
26892.330
Curve 125 29.395 6
26921.725
Tangent 170.233
27091.958
Curve 500 229.157 3.6
27321.115
Tangent 114.237
27435.352
Curve 125 103.446 6
27538.798
Tangent 81.869
27620.667
Curve 500 202.526 3.6
27823.193
Tangent 19.423
27842.616
Curve 500 179.889 3.6
28022.505
Tangent 132.341
28154.846
Curve 450 106.327 3.8
28261.173
Tangent 50.406
28311.579
Curve 200 57.249 5.4
28368.828
Tangent 202.525
28571.353
Curve 300 80.536 4.6
Curve 300 80.536 4.6
28651.889
Tangent 69.72
28721.609
Curve 1000 46.415 2.2
28768.024
Tangent 67.963
28835.987
Curve 450 66.965 3.8
28902.952
Tangent 88.365
28991.317
Curve 800 189.492 2.6
29180.809
Tangent 211.321
29392.130
Curve 2000 54.736 RC
29446.866
Tangent 348.057
29794.923
Curve 500 53.397 3.6
29848.320
Tangent 103.144
29951.464
Curve 200 57.393 5.4
30008.857
60 80 60
NC 1440 2360 1.5 9
RC 1030 1710 2 12
2.2 919 1530 2.2 13
2.4 825 1380 2.4 14
2.6 746 1260 2.6 16
2.8 676 1150 2.8 17
3 615 1050 3 18
3.2 561 959 3.2 19
3.4 511 882 3.4 20
3.6 465 813 3.6 22
3.8 422 749 3.8 23
4 380 690 4 24
4.2 343 635 4.2 25
4.4 311 584 4.4 26
4.6 283 538 4.6 28
4.8 258 496 4.8 29
5 235 457 5 30
5.2 214 421 5.2 31
5.4 195 386 5.4 32
5.6 176 351 5.6 34
5.8 156 315 5.8 35
6 123 252 6 36

60
1440 NC
1030 RC
919 2.2
825 2.4
746 2.6
676 2.8
615 3
561 3.2
511 3.4
465 3.6
422 3.8
380 4
343 4.2
311 4.4
283 4.6
258 4.8
235 5
214 5.2
195 5.4
176 5.6
156 5.8
123 6
80
11
14
16
17
19
20
22
23
24
26
27
29
30
32
33
35 23.33333
36 46.66667
37
39
40
42
43
28.66667
57.33333
14.33333
7.087333
3.543667
Geometry Points Station K Crest / Sag
PVC Station: 19+762.60
118.104 Sag
PVT Station: 19+802.60
PVC Station: 19+823.69
26.716 Crest
PVT Station: 19+873.69
PVC Station: 19+963.94
63.809 Sag
PVT Station: 20+013.94
PVC Station: 20+097.31
46.303 Sag
PVT Station: 20+147.31
PVC Station: 20+254.35
55.308 Sag
PVT Station: 20+304.35
PVC Station: 20+323.90
108.716 Crest
PVT Station: 20+373.90
PVC Station: 20+598.12
53.064 Crest
PVT Station: 20+678.12
PVC Station: 20+724.37
21.933 Sag
PVT Station: 20+764.37
PVC Station: 20+817.30
98.521 Sag
PVT Station: 20+917.30
PVC Station: 20+950.53
121.800 Crest
PVT Station: 21+020.53
PVC Station: 21+058.31
45.935 Crest
PVT Station: 21+178.31
PVC Station: 21+238.09
59.796 Sag
PVT Station: 21+338.09
PVC Station: 21+350.69
12.083 Crest
PVT Station: 21+382.69
21
PVC Station: 21+388.11
19.852 Sag
PVT Station: 21+436.11
PVC Station: 21+473.02
26.431 Crest
PVT Station: 21+583.02
PVC Station: 21+704.63
58.020 Sag
PVT Station: 21+974.63
PVC Station: 22+047.00
57.615 Sag
PVT Station: 22+107.00
PVC Station: 22+300.00
18.010 Crest
PVT Station: 22+370.00
PVC Station: 22+375.00
58.588 Sag
PVT Station: 22+415.00
PVC Station: 22+600.44
30.609 Sag
PVT Station: 22+680.44
PVC Station: 22+687.00
57.773 Crest
PVT Station: 22+887.00
PVC Station: 22+977.00
20.623 Sag
PVT Station: 23+037.00
PVC Station: 23+139.00
55.873 Crest
PVT Station: 23+199.00
PVC Station: 23+240.67
19.994 Sag
PVT Station: 23+372.67
PVC Station: 23+373.09
11.977 Crest
PVT Station: 23+424.09
PVC Station: 23+513.53
32.878 Crest
PVT Station: 23+613.53
PVC Station: 23+645.60
10.853 Sag
PVT Station: 23+685.60
PVC Station: 23+687.50
13.086 Crest
PVT Station: 23+722.50
PVC Station: 23+899.00
53.735 Crest
PVT Station: 23+999.00
PVC Station: 24+206.00
22.746 Sag
PVT Station: 24+256.00
PVC Station: 24+687.00
120.897 Crest
PVT Station: 24+837.00
PVC Station: 24+943.00
84.892 Sag
PVT Station: 25+193.00
PVC Station: 25+407.78
35.181 Crest
PVT Station: 25+527.79
PVC Station: 25+815.67
32.306 Sag
PVT Station: 25+865.71
PVC Station: 26+064.54
251.477 Sag
PVT Station: 26+114.54
PVC Station: 26+731.00
134.334 Sag
PVT Station: 26+851.00
PVC Station: 26+882.00
54.805 Crest
PVT Station: 26+942.00
PVC Station: 27+064.00
186.364 Sag
PVT Station: 27+214.00
PVC Station: 27+252.00
152.946 Crest
PVT Station: 27+312.00
PVC Station: 27+483.00
30.457 Crest
PVT Station: 27+543.00
PVC Station: 27+596.00
38.101 Sag
PVT Station: 27+646.00
PVC Station: 27+762.00
51.441 Sag
PVT Station: 27+812.00
PVC Station: 27+960.00
270.644 Crest
270.644 Crest
PVT Station: 28+010.00
PVC Station: 28+149.16
18.991 Crest
PVT Station: 28+184.16
PVC Station: 28+186.00
26.652 Sag
PVT Station: 28+236.00
PVC Station: 28+352.00
44.046 Sag
PVT Station: 28+422.00
PVC Station: 28+457.00
39.549 Crest
PVT Station: 28+507.00
PVC Station: 28+677.00
72.364 Sag
PVT Station: 28+737.00
PVC Station: 28+995.48
74.140 Crest
PVT Station: 29+245.48
PVC Station: 29+396.00
39.975 Sag
PVT Station: 29+476.00
PVC Station: 29+546.15
117.779 Crest
PVT Station: 29+746.15
PVC Station: 30+199.00
109.794 Sag
PVT Station: 30+259.00
PVC Station: 30+313.00
75.746 Crest
PVT Station: 30+373.00
PVC Station: 30+492.00
26.171 Crest
PVT Station: 30+612.00
PVC Station: 30+684.00
25.260 Sag
PVT Station: 30+884.00
PVC Station: 30+963.21
12.027 Crest
PVT Station: 31+030.79
PVC Station: 31+043.00
28.146 Sag
PVT Station: 31+193.00
PVC Station: 31+286.50
64.514 Crest
PVT Station: 31+481.50
PVC Station: 31+542.00
23.299 Sag
PVT Station: 31+592.00
PVC Station: 31+670.00
41.362 Crest
PVT Station: 31+730.00
PVC Station: 31+770.00
58.066 Sag
PVT Station: 31+830.00
PVC Station: 31+995.00
184.860 Sag
PVT Station: 32+055.00
PVC Station: 32+349.00
284.645 Sag
PVT Station: 32+399.00
PVC Station: 32+688.00
66.503 Crest
PVT Station: 32+728.00
PVC Station: 33+113.00
150.986 Crest
PVT Station: 33+243.00
PVC Station: 33+289.00
83.557 Sag
PVT Station: 33+469.00
PVC Station: 33+575.00
107.725 Sag
PVT Station: 33+615.00
PVC Station: 33+712.00
130.980 Crest
PVT Station: 33+752.00
PVC Station: 33+929.00
48.471 Crest
PVT Station: 33+999.00
PVC Station: 34+266.00
955.415 Crest
PVT Station: 34+316.00
PVC Station: 34+477.24
112.847 Crest
PVT Station: 34+546.76
PVC Station: 34+670.00
187.083 Sag
PVT Station: 34+730.00
PVC Station: 34+995.00
186.461 Sag
PVT Station: 35+055.00
PVC Station: 35+420.00
73.928 Sag
PVT Station: 35+510.00
PVC Station: 35+750.00
53.953 Crest
PVT Station: 35+810.00
21955.920
Curve 1 500 43.814 3.6
21999.734
Tangent 177.426
22177.160
Curve 2 500 50.681 3.6
22227.841
Tangent 167.359
22395.200
Curve 3 2000 28 RC
22423.200
Tangent 158.228
22581.428
Curve 4 125 36.73 6
22618.158
Tangent 64.901
22683.059
Curve 5 2000 58.403 RC
22741.462
Tangent 111.045
22852.507
Curve 6 500 48.457 3.6
22900.964
Tangent 120.789
23021.753
Curve 7 500 50.996 3.6
23072.749
Tangent 180.964
23253.713
Curve 8 180 38.88 5.6
23292.593
Tangent 141.437
23434.030
Curve 9 125 36.391 6
23470.421
Tangent 54.339
23524.760
Curve 10 500 141.415 3.6
23666.175
Tangent 99.539
23765.714
Curve 11 300 159.636 4.6
23925.350
Tangent 107.32
Tangent 107.32
24032.670
Curve 12 125 21.045 6
24053.715
Tangent 47.925
24101.640
Curve 13 180 64.649 5.6
24166.289
Tangent 116.85
24283.139
Curve 14 125 42.46 6
24325.599
Tangent 157.712
24483.311
Curve 15 150 71.196 6
24554.507
Tangent 50.7
24605.207
Curve 16 250 57.342 6
24662.549
Tangent 323.55
24986.099
Curve 17 2000 40.044 RC
25026.143
Tangent 162.86
25189.003
Curve 18 500 36.203 4.8
25225.206
Tangent 49.584
25274.790
Curve 19 500 33.517 4.8
25308.307
Tangent 224.924
25533.231
Curve 20 2000 41.926 RC
25575.157
Tangent 182.498
25757.655
Curve 21 300 81.247 6
25838.902
Tangent 50.246
25889.148
Curve 22 250 100.136 6
25989.284
Tangent 75.02
26064.304
Curve 23 500 41.963 4.8
26106.267
Tangent 373.653
26479.920
Curve 24 300 93.481 6
26573.401
Tangent 108.394
26681.795
Curve 25 125 21.339 6
26703.134
Tangent 57.925
26761.059
Curve 26 125 31.909 6
26792.968
Tangent 99.362
26892.330
Curve 27 125 29.395 6
26921.725
Tangent 170.233
27091.958
Curve 28 500 229.157 3.6
27321.115
Tangent 114.237
27435.352
Curve 29 125 103.446 6
27538.798
Tangent 81.869
27620.667
Curve 30 500 202.526 3.6
27823.193
Tangent 19.423
27842.616
Curve 31 500 179.889 3.6
28022.505
Tangent 132.341
28154.846
Curve 32 450 106.327 3.8
28261.173
Tangent 50.406
28311.579
Curve 33 200 57.249 5.4
28368.828
Tangent 202.525
28571.353
Curve 34 300 80.536 4.6
Curve 34 300 80.536 4.6
28651.889
Tangent 69.72
28721.609
Curve 35 1000 46.415 2.2
28768.024
Tangent 67.963
28835.987
Curve 36 450 66.965 3.8
28902.952
Tangent 88.365
28991.317
Curve 37 800 189.492 2.6
29180.809
Tangent 211.321
29392.130
Curve 38 2000 54.736 RC
29446.866
Tangent 348.057
29794.923
Curve 39 500 53.397 3.6
29848.320
Tangent 103.144
29951.464
Curve 40 200 57.393 5.4
30008.857
60 80 60
NC 1440 2360 1.5 9
RC 1030 1710 2 12
2.2 919 1530 2.2 13
2.4 825 1380 2.4 14
2.6 746 1260 2.6 16
2.8 676 1150 2.8 17
3 615 1050 3 18
3.2 561 959 3.2 19
3.4 511 882 3.4 20
3.6 465 813 3.6 22
3.8 422 749 3.8 23
4 380 690 4 24
4.2 343 635 4.2 25
4.4 311 584 4.4 26
4.6 283 538 4.6 28
4.8 258 496 4.8 29
5 235 457 5 30
5.2 214 421 5.2 31
5.4 195 386 5.4 32
5.6 176 351 5.6 34
5.8 156 315 5.8 35
6 123 252 6 36

60
1440 NC
1030 RC
919 2.2
825 2.4
746 2.6
676 2.8
615 3
561 3.2
511 3.4
465 3.6
422 3.8
380 4
343 4.2
311 4.4
283 4.6
258 4.8
235 5
214 5.2
195 5.4
176 5.6
156 5.8
123 6
80
11
14
16
17
19
20
22
23
24
26
27
29
30
32
33
35 23.33333
36 46.66667
37
39
40
42
43
28.66667
57.33333
14.33333
7.087333
3.543667