Location of Breaker Package Valve

When option flow adjusting is required in Solar Excavator, adjusting screw is located
in breaker package valve in the pump room.

Breaker Package Valve

1
Location of Adjusting Screw in Breaker Package Valve

Flow Adjustment Screw

C4 (Pi Pressure Check Point) 2


Adjustment Procedure

Pi-Q Curve (S225LC-V)

211
Pi : Pressure measured at C4
Q : Flow for breaker line
Q (L/min)

40
10 34.2
Pi (kgf/cm2)

Flow Adjustment Screw


Value Calculating Formula C4 (Pi Pressure Check Point)
Pi = (281.7-Q) / 7.07
Q = 281.7 – 7.07 x Pi
Adjusting Steps
1. With button on the right joystick pressed, check C4 pressure.
Initial Setting Value 2. Adjust Q flow by adjusting Flow Adjustment Screw.
Q = 120 L/min (Pi = 22.9 kgf/cm2) 3. Make sure to refer to Pi-Q curve in the specification for each model.

E.O.D 3