When option flow adjusting is required in Solar Excavator, adjusting screw is located
in breaker package valve in the pump room.
1
Location of Adjusting Screw in Breaker Package Valve
211
Pi : Pressure measured at C4
Q : Flow for breaker line
Q (L/min)
40
10 34.2
Pi (kgf/cm2)
E.O.D 3