BP-CDZZZZ-GE-SPE-0001-00 C06-Technical Document Numbering Specification
BP-CDZZZZ-GE-SPE-0001-00 C06-Technical Document Numbering Specification
BP-CDZZZZ-GE-SPE-0001-00 C06-Technical Document Numbering Specification
BP-CDZZZZ-GE-SPE-0001-00
Technical Document Numbering Specification
This is an AGT Region controlled document. Any change to this document must be reviewed and approved by the appropriate Document Authority prior to use and issue. Any documents not approved in
this manner will be uncontrolled.
*Paper copies are uncontrolled. This copy valid is only at the time of printing. The controlled version of this document can be found in AGT Region Atlas.
.
Rev. No Rev. Date Doc Owner Doc Authority Summary description of changes eMOC Ref
A1 14/02/2012 Farid Amal Ibadzada For first issue 17512
Mammadov
C1 28/02/2012 Farid Amal Ibadzada Approved for Use 17512
Mammadov
Narmin
C3 20.06.2013 Gasimova Farid Annual review 33559
Mammadov
Farid
C4 20.04.2016 Mammadov Eric Brown Annual review N/A
Removed Historical Codes from The
Document
Narmin
C5 24.11.2017 Gasimova Farid N/A
Mammadov Additions of new codes
Farid
C6 04.03.2018 Mammadov Vania De Additions of new codes N/A
Stefani
Contents
1. GENERAL.........................................................................................6
1.1 Purpose................................................................................................................6
1.2 Implementation and Responsibility....................................................................6
1.3 Coordination of Amendments...............................................................6
1.4 Using this document...........................................................................6
1.5 Document number format diagrams.......................................................6
1.6 Electronic document management.........................................................6
1.7 Document number uniqueness..............................................................6
2. DOCUMENT & DRAWING NUMBERING......................................................7
2.1 Document & Drawing Numbering Format...............................................7
2.2 Multidiscipline Design Documents/Drawings..........................................7
3. CODES....................................................................................................8
3.1 Contractor/Originator Codes...............................................................8
3.2 Area codes..................................................................................13
3.2.1 Facility Code..............................................................................14
3.2.2 Area Code..................................................................................17
3.2.3 Export Pipelines 4 Character Facility/Area Codes.................................21
3.2.4 Area Sub Code..............................................................................24
3.4 Document Types...........................................................................27
3.5 Sequence Number..........................................................................32
3.6 Sheet Number...............................................................................32
3.7 Life Cycle Code...........................................................................33
4. Document Revision................................................................................33
4.1 Revision Codes.................................................................................................33
5. Examples of Non-Standard Numbering....................................................33
5.1 ACG Piping isometric / service support numbering format........................33
5.2 WREP Historical Numbering..............................................................34
1.1 Purpose
The purpose of this document is to provide a standardized numbering system for AGT region technical documentation.
Historical codes used by AGT and are no longer required for use are recorded in separate document, BP-CDZZZZ-GE-SPE-
0001-01 “Legacy Codes of Technical Document Numbering Specification”
The owner shall ensure that appropriate review and update processes are established to ensure that the various stakeholders
are consulted and informed of changes to the TDNS. The owner shall assess changes to determine the extent of consultation,
however as a guide, if a variation to the document numbering structure (including length of component parts) is proposed,
AGT DRE and/or TA review is required. Addition of extra contractor codes or other components does not require AGT
DRE/TA review.
Section 2 gives the basic format for the document number that shall apply throughout the AGT Region.
Section 3 provides the various codes that form the components of the document number. Please note that some codes, for
example facility codes, also apply to equipment and therefore also appear in the Engineering Numbering Specification BP-
CDZZZZ-PM-SPE-0002. In order to avert the risk of differences between the Engineering Numbering Specification (ENS)
and the Technical Documentation Numbering Specification (TDNS) the master coding for such codes shall be preserved
within the ENS.
Where a Document/Drawing covers two or more disciplines or document types, then the principal Discipline/Document Type
Code shall be included in the Document/ Drawing Number.
3. CODES
BS Bredero Shaw
MM Muir Matheson
MP Mickropack
MQ MQS
MR Mentor Subsea
2 Character
Description
Facility Code
AG ACG Facility
0C Chirag 1 Platform
0S Sangachal Non Process Area (all ST buildings except for CTTC), Sewage Treatment Plant and CWAA
1C Central ACG CWP Platform (CA-CWP)
1D Central ACG PDQ Platform (CA-PDQ)
2 Character
Description
Facility Code
1E EOP
1F Common CA CWP and CA PDQ
1H Sangachal Terminal - BTC Pumping Station PSA1
1I Infrastructure Upgrade
1J Sangachal Terminal Dew Point Control Unit
1K SPS Onshore Supply Base- Diesel Tank Farm
1L Pipelines phase 1
1M Chirag 1 Modifications
1N Launch Barge
1Q Produced Water Disposal
1S Sangachal Terminal Expansion - Trains 1 & 2
1V Sangachal Open Drains Treatment Plant
1W Well Construction
1X Pre-Production Facilities
2A Documents common to Azeri Subsea Project Appraise/Select stage
2B Documents common to Azeri Subsea Project Define/Execute stage
2D West PDQ Platform (WA-PDQ)
2E East PDQ Platform (EA-PDQ)
2F Common to East and West Platforms
2H BTC Expansion 1.6 MMBPD
2K SPS Onshore Supply Base excluding Diesel Tank Farm
2L Pipelines phase 2
2M East Subsea Water Injection Manifold
2P East Azeri Subsea Manifold
2Q Produced Water Disposal Onshore Phase 2
2S Sangachal Terminal Expansion - Trains 3 & 4
2U Infrastructure Upgrade
2W Well Construction
2X Pre-Production Facilities
Deep Water Gunashli (DWG) Facilities – Process, Compression, Water Injection, Utilities (PCWU)
3C
Platform
3D Deep Water Gunashli (DWG) Facilities – Drilling, Utilities, Living Quarters (DUQ) Platform
3F Common to phase 3 DWG Facility.
3H BTC Expansion 1.2 MMBPD
3J Sangachal Terminal Dew Point Control (2)
3L Pipelines phase 3
3M Chirag Modifications
3N North Subsea Water Injection Manifold DWG
3P Common for North and South Subsea Water Injection Manifolds
3R South Subsea Water Injection Manifold DWG
3Q Subsea (Vessels and Quayside)
3S Sangachal Terminal Expansion - Trains 5 & 6
3T Common for all Subsea Water Injection Manifolds (East, North, South) DWG
3U Infrastructure Upgrade
4D West Chirag PDQ Platform (WC-PDQ)
4F Common to PCWU and WC-PDQ Platforms
4L Chirag Pipelines
4M Chirag Subsea – East Manifold
2 Character
Description
Facility Code
4P Future Subsea Scope
4S Chirag Onshore Scope
5A ACG Re-Development Project
5L ACG Pipeline Corridor
6A Azeri Central East project
6J ACE Subsea
6L Shah Deniz Pipeline Corridor
7L Sangachal Onshore Pipeline Corridor
8L 16’’Oil Rocks Pipeline Corridor
9L CA to Shah Deniz FOC Corridor
AC Common for Azeri Facilities (CA,EA,WA)
AP Appraise documents for undefined scopes
AR ACG Re-Development project
BF Chirag General Document (Like IG)
CC Common for COP and Chirag1
CD Common Document for AGT Region
CE Common for Export Pipelines
CF Common for Azeri and DWG platforms
CG Common for Chirag 1 and DWG
CH Common for COP and DWG
CK Common for SPS Onshore Supply Base - Diesel Tank Farm & Mud Plant facility
CM Common for Midstream (Sangachal and Export Pipelines)
CO Common Offshore
DG Dada Gorgud Drilling Rig
GL Subsea pipeline between Chirag and CDWG
HA Heydar Aliyev Drilling Rig
IS Istiglal Drilling Rig
JS Serenja
LG Logistics
MO MODU
NP Non-operational facilities
OF Offices
RM Rig Move
SA Shah Deniz Alfa Platform
SC Spare
SH Spare
SR Subsea
SO Common Shah Deniz Alpha and Shah Deniz Sangachal
SS Sangachal Terminal – Shah Deniz
SZ Sangachal Common
TA TANAP
TC Sangachal Caspian Technical Training Center and all facilities within CTTC Campus
TI TISA
TP TAP
TR Common for Turkey
2 Character
Description
Facility Code
UA CWAA (Central Waste Accumulation AREA) ATA
US Waste sites
UT CWAA (Central Waste Accumulation AREA) ST
UW CWAA (Central Waste Accumulation AREA)SPS
WL Wells
2 Character
Description
Facility Code
MX SCPX
SB Shah Deniz Bravo Production Platform
SE Common SD2 Offshore facilities ((SB, SQ, SK, SV,SP) Documents related to both the Shah Deniz 2 Bravo
Production Platform and Living Quarters SD2 Marine and SD2 Subsea)
SF Documents related to the Shah Deniz 2 Project - Define and Execute
SI Documents related to the Shah Deniz 2 Onshore Early Works Project
SJ Pipelines – Stage 2
Documents related to both the Shah Deniz 2 Bravo Production Platform and Living Quarters & Utilities
SK
Project
SM Documents related to the Shah Deniz 2 Project - Select
SO Common documents to SD2 Offshore and Onshore assets
SP Subsea Stage 2
SQ Shah Deniz Bravo Quarter & Utilities
SU Sangachal Terminal – Stage 2
SV SD2 Marine
SW Common to SD2 Subsea and Marine
SX Documents related to the Shah Deniz 2 and South Caucasus Pipeline Expansion Projects
SY Common to onshore Shahdeniz Sangachal and Shahdeniz 2 Onshore (Common to SS and SU)
S1 East North Flank
S2 East South Flank
S3 North Flank
S4 West Flank
S5 West North Flank
S6 West South Flank
S7 Area around the platform (infield) (Subsea and Marine)
S8 Export (meg line, condensate, 2 gas export lines)
S9 Future
3.2.1.3 SCP/WREP Pipeline Facility Codes
2 Character
Description
Facility Code
MS South Caucasian Pipeline
WX Western Route Pipeline Azerbaijan
WY Western Route Pipeline Georgia
WZ Western Route Pipeline General Azerbaijan and Georgia
Code Description
Code Description
TE Tie-ins
TI Topsides Interface
TP Well Construction: Template
TS Topsides
UV Vessel Upgrade
WB Well Bay
WH Well Construction: Wellhead
WO Well Construction: Workover
ZZ General, Non Specific
2 Character
Area Code Description
Area Code
00 SCP – Area 00 General
10 SCP – Area 10 General – Azerbaijan
13 SCP – Area 13 Block Valve Station BVR-A1 – Azerbaijan
16 SCP – Area 16 Block Valve Station BVR-A2 – Azerbaijan
19 SCP – Area 19 Block Valve Station BVR-A3 – Azerbaijan
21 SCP – Area 21 Block Valve Station BVR-A4 – Azerbaijan
23 SCP – Area 23 Block Valve Station BVR-A5 – Azerbaijan
30 SCP – Area 30 General – Georgia
32 SCP – Area 32 Block Valve Station BVR-G1 – Georgia
34 SCP – Area 34 Block Valve Station BVR-G2 – Georgia
36 SCP – Area 36 Block Valve Station BVR-G3 – Georgia
50 SCP – Area 50 General Fuel Gas Offtakes to BTC Pump Stations
51 SCP – Area 51 Sangachal Pig Launcher – Azerbaijan
55 SCP – Area 55 Fuel Gas Offtake to BTC Pump Station A2 - Azerbaijan
65 SCP – Area 65 Fuel Gas Offtake to BTC Pump Station G1 – Georgia
72 SCP – Area 72 Georgian Offtake Station – Georgia
73 SCP – Area 73 Spur Pipeline and Tie-In to Georgian Gas System
75 SCP – Area 75 Fuel Gas Offtake to BTC Pump Station G2
37 SCP-Area 37 Block Valve Station BVR-G4 – Georgia
35 SCP-Area 35 Block Valve Station BVR-G5 – Georgia
31 SCP-Area 31 Block Valve Station BVR-G0 – Georgia
80 SCP – Area 80 Georgian-Turkish Border Station
2 Character Area
Area Code Description
Code
50 WREP PS5 & PS8 stations (to be used with 01 sub area code)
54 Poti Facilities
55 Sangachal Booster Pumps & Metering
57 Cathodic Protection facilities - Azerbaijan
58 Cathodic Protection facilities - Georgia
2 Character Area
Area Code Description
Code
60 WREP General
61 WREP Pump Station 01
62 WREP Pump Station 02
63 WREP Pump Station 03
64 WREP Pump Station 04
65 WREP Pump Station 05
66 WREP Pump Station 06
67 WREP Pump Station 07
68 WREP Pump Station 08
69 WREP Pump Station 09
72 WREP Azerbaijan (Rehabilitation)
73 WREP Azerbaijan (New)
75 WREP Georgian (Rehabilitation)
76 WREP Georgian (New)
80 Supsa
81 WREP Pump Station 11
82 WREP Pump Station 12
83 WREP Pump Station 13
84 WREP Pump Station 14
85 WREP Pump Station 15
86 WREP Pump Station 16
87 WREP Pump Station 17
88 WREP PRS 01
89 WREP PRS 02
91 Offshore Pipeline
92 CALM
93 FSO
94 Mobile Radio Stations - Azerbaijan
95 Mobile Radio Stations - Georgia
2 Character Area
Area Code Description
Code
00 General SCPX project documentation
01 General SCPX pipeline documentation
02 General SCPX facilities documentation
10 SCPX Pipeline Azerbaijan
11 B11H: BTC – Block Valve AB02
12 SCPX Pipeline River Crossing Azerbaijan
13 SCP BVR A01
14 SCPX BVR A06
15 B11H: BTC – Block Valve AB04
16 SCP BVR A02
17 SCPX BVR A07
18 B11J: BTC – Block Valve AB06
2 Character Area
Area Code Description
Code
19 SCP BVR A03
20 SCPX BVR A08
21 SCP BVR A04
22 SCPX BVR A09
23 SCP BVR A05
24 SCPX BVR A10
25 B11J: BTC – Block Valve AB07
26 B11K: BTC – Block Valve AB10
27 B11K: BTC – Block Valve AB12
28 B11K: BTC – Block Valve AB13
29 B11K: BTC – Block Valve AB14
30 SCPX Pipeline Georgia
31 SCP BVR G00
32 SCP BVR G01
33 SCPX BVR G07
34 SCP BVR G02
35 SCP BVR G05
36 SCP BVR G03
37 SCP BVR G04
38 SCPX BVR G06
39 B21J: BTC – Block Valve GB01
40 SCPX Pipeline Crossover 1
41 SCPX Pipeline Crossover 2
42 SCPX Pipeline River Crossings Georgia
43 B21K: BTC – Block Valve GB09
44 B21K: BTC – Block Valve GB11
45 B21K: BTC – Block Valve GB12
46 B21K: BTC – Block Valve GB15
47 B21K: BTC – Block Valve GB17
48 B21K: BTC – Block Valve GB21
49 B21L: BTC – Block Valve GB22
51 SCP Sangachal Terminal Pigging Station - Launcher
52* SCPX Sangachal Terminal Pigging Station - Launcher
53 SCPX Intermediate Pigging Station - Launcher
55 SCP PSA2 Fuel Gas Off take
56 SCPX PSA2 Fuel Gas Off take
57* SCPX Intermediate Pigging Station – Receiver
58 B12B: BTC Intermediate Pigging Station 1 Azerbaijan (IPA1)
60 B11K: BTC – Block Valve AB15
61 B11L: BTC – Block Valve AB16
62 B11L: BTC – Block Valve AB18
63 B11L: BTC – Block Valve AB19
64 B11L: BTC – Block Valve AB21
66 B11L: BTC – Block Valve AB22
70 SCPX Georgian Off take Pressure Reduction and Metering Station
71 SCPX Compressor Station 01
72 SCP Georgian Off take Pressure Reduction and Metering Station
73 SCP Georgian Off take
74 SCPX Georgian Intermediate Pigging Station - Receiver
75 SCP PSG2 Fuel Gas Off take
77 SCPX Compressor Station 02
78* SCPX Georgian Intermediate Pigging Station - Launcher
80 SCP Georgian - Turkish Border Pressure Reduction and Metering Station
81 SCPX Georgian -Turkish Border Pressure Reduction and Metering Station
85 B21L: BTC – Block Valve GB23
86 B21L: BTC – Block Valve GB24
87 B21L: BTC – Block Valve GB26
99 SCP Turkish Gas Metering Station
4 Character
Facility/Area Code Facility/Area Code Description
0000 General (BTC,SCP,WREP) Az/Geo
1000 General (BTC,SCP,WREP) Azerbaijan
2000 General (BTC,SCP,WREP) Georgia
B000 BTC – General
B010 BTC – General Oil Pipeline
B020 BTC – General Oil Facility
B050 BTC – General Fibre Optic Cable
B060 BTC – General Control Systems – Oil
B070 BTC – General Control Systems –Gas
B080 BTC – General Telecom System – Oil
B090 BTC – General Telecom System–Gas
B110 BTC – Oil Pipeline – Azerbaijan
B120 BTC – Oil Facility – Azerbaijan
B210 BTC – Oil Pipeline – Georgia
B220 BTC – Oil Facility – Georgia
B310 BTC – Oil Pipeline – Turkey
B320 BTC – Oil Facility – Turkey
B11H BTC – Check Valve AC01, Ball Valve AB02 to AB04
B11J BTC – Ball Valve AB05 to AB08
B11K BTC – Check Valve AC09, Ball Valve AB10 to AB15
B11L BTC – Ball Valve AB16 to AB19, AB21 to AB22, Check Valve AC20
4 Character
Facility/Area Code Facility/Area Code Description
B31K BTC – Ball Valve BVT16 to BTV23
B31L BTC – Ball Valve BVT24 to BVT39
B31M BTC – Ball Valve BVT40 to BVT48
B31N BTC – Ball Valve BVT49 to BVT52
B32A BTC – Pump Station PST1 Turkey
B32B BTC – Pump Station PST2 Turkey
B32C BTC – Pump Station PST3 Turkey
B32D BTC – Pump Station PST4 Turkey
B32E BTC – Intermediate Pigging Station IPST1 and Let Down LDT1
B32F BTC - Ceyhan Terminal TE1
GB01 BTC Georgia Ball Valve 01
GB03 BTC Georgia Ball Valve 03
GB05 BTC Georgia Ball Valve 05
GB09 BTC Georgia Ball Valve 09
GB10 BTC Georgia Ball Valve 10
GB11 BTC Georgia Ball Valve 11
GB12 BTC Georgia Ball Valve 12
GB15 BTC Georgia Ball Valve 15
GB16 BTC Georgia Ball Valve 16
GB17 BTC Georgia Ball Valve 17
GB18 BTC Georgia Ball Valve 18
GB21 BTC Georgia Ball Valve 21
GB22 BTC Georgia Ball Valve 22
GB23 BTC Georgia Ball Valve 23
GB24 BTC Georgia Ball Valve 24
GB26 BTC Georgia Ball Valve 26
4 Character
Facility/Area Code Facility/Area Code Description
This two character code will be developed to identify modules/skids or for more detail as necessary. If this code is not
applicable, the code “ZZ” shall apply (non-specific). The module code is further clarified in the 3D CAD Model Site Naming
Convention doc. BR-CDZZZZ-PM-PRO-5001.
3.2.4.2 SCPX Pipeline River Crossing Azerbaijan Sub Area Codes (to be used with area code 12
only)
3.2.4.3 SCPX Pipeline River Crossing Georgia Sub Area Codes (to be used with area code 42
only)
The two character discipline codes for the engineering disciplines are as listed below together with additional codes for non-
engineering groups.
Code Discipline
AC Accounts Payable
AR Architectural
CC Cost Control
CG Commissioning
CM Construction
CN Contracts Management
Code Discipline
CO Completions
CS Control Systems (Elec/Inst/Tele) - Not to be used for COP or Shah Deniz 2 projects without
permission from the BP Project Document Controller.
CT Subsea Connectors
CV Civil
DC Document Control
DG Decommissioning
DI Diving
DR Drilling
EL Electrical
EN Engineering
ES Estimating
EV Environmental
FA Finance & Administration
FC Foundations
FL Flowlines
FS Flow Assurance
GE General – Not to be used for COP or Shah Deniz 2 projects.
GJ GSH-Subsea after-market
GS Geo-Science
HP Plumbing
HS Health, Safety and Environment
HV HVAC
IC Instrumentation
IF Information Management
IM Integrity Management
IP Inspection
IS PRISM Information Systems
IT Information Technology
LG Logistics/Transportation
MA Marine
ME Merchanical
MM Materials Management
MP Procurement
MS Manifolds
MT Materials Engineering
NA Naval architecture
OI Installation
OP Operations
PC Project Control
PE Project Engineering
PF Performance
PI Piping
PL Pipelines
PM Project Management
PN Preservation
PQ Procurement and Supply Chain Management
Code Discipline
PR Process
PS Planning
PT Project Services
PU Purchasing
QA Quality Assurance
QC Quality Control
RE Reservoir
RL Reliability Engineering
RS Resource
SA Process Design / Safety
SC Security
SE Sub Sea Execution
SF Structural Floater
SJ Structural Jackets
SL Common to Structural Jackets and Structural Topsides
SM Structural Template
SO Social
SR Geo-Technical/Geo-Physical surveys
SS Subsea
ST Structural Topsides
SU Subsea Survey
SV Sub-Surface
TA Turnaround
TE Telecommunications
TS Trees
TW Temporary works
UR Intervention System and Tools (ROT)
WC Weight Control
WE Well Engineering
ANS Analysis
CAL Calculation
CHT Chart
CRT Certificate
DAA Data
DOS Dossier
FRM Form
GLN Guidelines
HUP Hook-up
IDX Index
INS Instruction
INT Interface
ISO Isometric
LST List
MAN Manual
MAT Matrix
MOD Model
PHI Philosophy
PLC Policy
PLN Plan
PRC Procedure
REC Record
REG Register
REP Reports
SCH Schedule
SDD Standards
SHM Scheme
SKE Sketch
SPE Specification
SPS Pipelines - Special Section Drawings - Any special Area/section/seismic design drawings
STG Strategy
STU Studies
TEM Template
TRL Trail
In case of allocation of system number based sequence numbers, the first two digits of four-digit Sequence Number shall be
selected from the system number list. Engineering Numbering Specification BP-CDZZZZ-IF-SPE-0003-00 describes these
codes in details.
This section on sheet numbering does not apply to the numbering of piping isometrics which is covered in attachment A of
this document.
4. Document Revision
A 3-alpha-numeric Revision Code shall be assigned to a document to distinguish multiple issues of a document. The current
Revision code shall be indicated on the front sheet of the document or the drawing title block in a box following the unique
document number, and also in the revision history table.
Notes
Notes:
1. ENS = Engineering Numbering Specification, ref. BP-CDZZZZ-IF-SPE-0003-00
2. Abbreviated area code: see 3.2.2, use first letter of this code
3. Abbreviated model site code: use last three letters or numbers of this code
4 Control System ISOs where line number is not applicable standard document numbering can be used
ACG Examples:
Electrical Rack:
Rack Name: E1D1D-A1N10001.01
Support Name: X1D1D-A1N10001.01
Support Detail: BR-1DTD1D-PSD-A1N10001.001-C1
HVAC:
HVAC Name: H1K1D-S-LER.01
Support Name: X1K1D-SLER0101-001
Support Detail: BR-1DTK1D-PSD-SLER0101-001-C1
Notes:
For explanation of codes used for legacy WREP documents please refer to PROCEDURE FOR ASIGNING NUMBERS TO
EQUIPMENT & DOCUMENTS 6551-Z-60-GG-PM-PR-003.doc