GM GN-i’LLLN 96 m 9006379 0009238 TTb m

GENERAL MOTORS ENGINEERING STANDARDS Materials and Processes - Metals


I I I

CORROSION PROTECTIVE COATINGS PHOSPHATE/ZINC/ORGANIC


TYPE
GM7111M

1 SCOPE. This specification covers the basic require- 3.3.3 Nuts must gagean appropriateGO thread gage speci-
ments for a corrosionprotectivecoating processconsistingof fied on drawings.
zinc phosphatetreatment,a zinc rich epoxy resin coating,and
an aluminum tint organic top coating. The coating may be 3.4 CORROSIONRESISTANCE. Partscoatedto this speci-
appliedby dipping or spraying.Part configurationdictatesthe fication shall be capableof withstanding neutral salt spray
applicationprocess. (NSS) testing for a minimum of 240 h with no red rust.
Conformanceto this requirementis basedon laboratorytesting
1.l The coating is suitablefor bolts, clips and other ferrous with sampleand resultsas indicatedin Table 1.
parts where above normal levels of corrosion protectionand ;’
freedomfrom hydrogenembrittlementare required 3.4.1 For initial approvaland PPAP submissionsparts must
be tested per GM4298P to meet the corrosion resistance
1.2 APPLICATION. It is recommendedthat the internally requirementson significantsurfacesper . For normal produc-
threadedpart (nut) be coatedin a variablespeedcantingcentri- tion, processesthat are in statisticalprocesscontrol shall yield
fuge, which applies paint coating by a gravity flow-through parts that are capableof meetingthe samesalt spray require-
system.Parts without internal threadscan be coatedby other ments. A periodic NSS test of the parts being processedon
processes. each line running this coating shouldbe conductedper ANSI
B18.18.2M.Table 2 of ANSI B18.18.2Mindicatesan inspec-
1.3 Use of this fmish threadedsurfaceand/orbearingsurface tion level of B for NSS, with NOTE 4 referencingTableB in
of joints could affect the torque-tensionrelationship.It is rec- Appendix 1 and Table3. Since this coatingis not includedin
ommendedthat a torque-tensionstudy of the fastenerjoint the list of finishing operationsin Table B. to actual control
should be preformed before releasing this finish on a new checks to be made and recordedshall be basedon chemical
application. manufacturer’sinstructions.

2 REFERENCED STANDARDS.
3.4.1.1 Significantsurfacesfor test evaluationinclude but are
not limited to fastenerheads,socket recesses,sems washers
and externalnut surfaces.Sharpedgesare excluded.
GMlOOOM GM9071P
GM4298P ANSI B18.18.2M 3.5 FLEXIBILITY AND CHIP RESISTANCE.
GM4465P Coating shall withstandthe normal extensionand compression
of springsand the normal flexing encounteredby spring clips
3 REQUIREMENTS. during assemblyin the end product without evidenceof flak-
ing or loss of adhesionto basemetal. Also, it shall withstand
3.1 RESTRICTED AND REPORTABLE CHEMICALS normal handlingand storageconditionswithout chipping,flak-
(GMlOOOM). AlI materialssuppliedto this specificationmust ing or other coatingdamage.
comply with the requirementslisted in GMlOOOM,‘Restricted
and ReportableChemicals.” TABLE 1
3.2 APPEARANCE AND CURE. Coating shall give a uni- Number of
form metallic gray appearanceand shall be free from tears, Samples to be Results Conformance
sags and excesscoating which affect appearanceand perfor- Tested
mance.It shall not be oily or tacky to the touch. No rust on any Samplesconform
sample to recmirements
3.3 THICKNESS. Coating in threadsof threadedproducts
shall not have an adverseeffect on normal installation and One sample Samplesconform
removal practices. exhibits less than to requirements
10% surfacerust
3.3.1 The minimum total coating thicknessshall be 15 pm. One or more Samplesfail to
samplesexhibit conform
3.3.2 The maximum thickness of coating which may be more than 10%
appliedto threadson threadedproductsis limited by the basic surfacerust
thread size. See 5.1: REFEREEINSPECTION. Threadsmay
be producedundersize/oversize (beforecoating) to accommo- Tivo or more Samplesfail to
date the coating thickness, providing the finished product 5 samplesexhibit conform
(after coating) meets all specified mechanical properties. lessthan 10%
Where mechanicalpropertiesare not specified, undersizing/ surfacerust
oversizingis subjectto approvalby the pertinentengineer.All
undersize/oversize must be within permissiblelimits as agreed 3.6 ADHESION CHARACTERISTKS . Parts coated to this
upon. specificationshall showno evidenceof blistering or other evi-

0 Copyright NOVEMBER 19X Gored Motu-s Caporation PII Rights Reserved

NOVEMBER 1996 PAGE 1 7111M


GM GN7LLLM 96 - 900b379 0009239 932 -

1 GENERAL MOTORS ENGINEERING STANDARDS 1 Materials and Processes - Metals I

CORROSION PROTECTIVE COATINGS PHOSPHATE/ZINC/ORGANIC


TYPE
GM7111M
&nce of loss of adhesionafter exposureto humidity testing 5 INSPECTION AND REJECTION. AU shipmentsof
for 96 h minimum. Parts(see3.7.4 for restrictionon part size material or parts under contract or purchaseorder manufac-
for tapetest) shall show no more than 3.0 mm peel back from tured to this specificationshall be equivalentin every respect
intersectionof lines scribedand tapetestedimmediatelyafter a to the initial samplesapprovedby engineering.There shall be
10 minute recovery period following exposureand no other no changesin either formulation or manufacturingprocesses
peelingin areaunder tape. permittedwithout prior notification and approvalby the pur-
chaser.Lack of notification by the supplierconstitutesgrounds
NOTE: This coating may leave light depositsof zinc remain- for rejection of any shipment.While samplesmay be taken
ing on handsor tape due to flake form. from incoming shipmentsand checkedfor conformanceto this
3.7 TESTING. specification,the supplier shall acceptthe responsibility.
3.7.1 Thicknessshall be determinedby microscopicexamina- 5.1 REFEREEINSPECTION.
tions of cross sections taken perpendicular to significant
surfacesor by other methodsagreedupon by the supplierand 5.1.1 The following refereethreadinspectionproceduremay
purchaser. be utilized if the specified“go” gagebinds on the screw,bolt
3.7.2 Neutral salt spray testing shall be conductedaccording or nut.
to GM4298P
5.1.2 Bolt or Screw. Assemblea phosphateplated test nut
3.7.2.1 When this coating is specifiedfor fasteners,the parts with a 2B or 6H class thread down the full length of the
shall be assembledwith properly maintainedpower tools, to a thread
coated steel panel or mating part, in a mannersimulatedto
productionand perpendicularagainsta flat surface.The panel 5.1.3 Nut. Assemblea phosphateplated test bolt or screw
of fastenersshall be exposedto salt spray @ 15 to 30”from with a 2A or 6g class threadfor a minimum of one diameter
the vertical to allow wetting of significant surfaces. throughthe nut
3.7.3 Humidity testing shall be conducted according to 5.1.4 The test nut or screw/boltmust run freely for the total
GM4465P(100% RH @ 38°C). length without binding. This test is to be conductedon a mini-
.7.4 Tapetestingshall be conductedaccordingto GM9071P mum of 6 samples.One failure constitutesa rejection.
,Method B) on parts large enough to receive the specified
scribe. 6 APPROVED SOURCES. Engineeringqualification
3.7.5 The presenceof the clear topcoatmay be determinedby of an approvedsourceis requiredfor this specification.Only
the sulfamic acid drop test One to 2 drops of 1% solutionof sourceslisted in the GM CorporateMaterialsFide(MATSPC)
sulfamicacid shall be droppedon the surface.If the topcoatis under this specificationnumberhave been qualified by engi-
missing,the surfacewill turn black. neering as meeting the requirements of this specification.
Sourcesare availablethrough the on-line MATSPCsystem.
4 INITIAL SOURCE APPROVAL. No shipment shall
be madeby any supplieruntil representativeinitial production 7 GENERAL INFORMATION. This standard was
sampleshave been approvedby engineeringas meeting the issuedin August 1986.The latestrevisionsinclude:
requirementsof this specification.
4.1 Completedcopiesof the Material SafetyData Sheetmeet- Rev Date Description
ing GM informationrequirementsmust he submittedwith any E 10194 Rev. 3.1, 3.4, 3.5 and 3.6
new submissions or whenever a composition change has
occurred. F 7196 Added 1.3 and Editorial

7111M PAGE 2 NOVEMBER 1996