Executive Summary
I. Introduction
The contract, the current situation and the issue under dispute.
The objectives and outline of the document.
Anticipated means and The difference between the Impact of actual conditions
methods, schedule and cost means, methods, time and cost on means, methods,
estimate. as set out in the bid and those schedule and cost.
actually used forms the basis
for quantification.
A formal request to be put in the same position as the contractor would have been
had the actual conditions not differed from those described in the contract.