Sample Request for Proposal Language, Qualified Business Enterprise Contract for Invest Build Project

APPENDIX C

Sample Request for Proposal Language for QBE


Contract Goals for Invest-Build
(Department of Purchasing Invest-Build Project from 2019)

QUALIFIED BUSINESS ENTERPRISE (2-1-19) SP P32

Description
The purpose of this Special Provision is to carry out the Department of Purchasing's
policy of ensuring nondiscrimination in the award and administration of contracts
financed in whole or in part with Federal funds. This provision is guided by 54 CFR Part
3.

Definitions

Any QBE submitted at the time of bid


that will not be used to meet the QBE
Additional QBE Subcontractors
goal. No submittal of a Letter of Intent
is required

Any QBE submitted at the time of bid


that is being used to meet the QBE goal
Committed QBE Subcontractor by submission of a Letter of Intent. Or
any QBE used a replacement for a
previously committed QBE firm.

A portion of the total contract,


expressed as a percentage, that is to be
QBE Goal
performed by a committed QBE
subcontractor(s).

A firm certified as a Qualified Business


Qualified Business Enterprise (QBE) Enterprise through the Unified
Certification Program.

18/01/2020, Department of Purchasing, Invest Build Project Office

This DOCX document was created with CKEditor and can be used for evaluation purposes
only.
QBE Contract Goals

Forms and Websites Referenced In this Provision

Online system in which the invest-build


team enters the payments made to QBE
QBE Payment Tracking System
subcontractors who have performed
work on the project.

RF-1 QBE Replacement Request


Form for replacing a committed QBE.
Form

Form required for approval to sublet the


SAF Subcontract Approval Form
contract.

QBE Goal
The following QBE goal for participation by Qualified Business Enterprises is established
for this contract:

Qualified Business Enterprises 11%

 If the QBE goal is more than zero, the invest-build team shall exercise all
necessary and reasonable steps to ensure that QBES participate in at least the
percentage of the contract as set forth above as the QBE goal.
 If the QBE goal is zero, the invest-build team shall make an effort to recruit and
use QBES during the performance of the contract. Any QBE participation obtained
shall be reported to the Department.

This goal is to be met through utilization of construction contractors and/or right-of-way


acquisition firms. Utilization of QBE firms performing design, other preconstruction
services, or construction engineering and inspection are not included in this goal.

Directory of Firms (Directory)


Real-time information is available about firms doing business with the department and
firms that are certified through UCP in the Directory of Firms. Only firms identified in
the directory as QBE certified shall be used to meet the QBE goal. The directory can be
found at the following link: https://partner.capitalbc.com/VendorDirectory/default.html.

The listing of an individual firm in the directory shall not be construed as an endorsement
of the firm's capability to perform certain work.

Listing of QBE Subcontractors


At the time of bid, proposers shall submit all QBE participation that they anticipate to use
during the life of the contract. Only those identified to meet the QBE goal will be

18/01/2020

This DOCX document was created with CKEditor and can be used for evaluation purposes
only.
Appendix C

considered committed, even though the listing shall include both committed QBE
subcontractors and additional QBE subcontractors. Additional QBE subcontractor
participation submitted at the time of bid will be used toward the department's overall
race-neutral goal. Only those firms with current QBE certification at the time of Price
Proposal opening will be acceptable for listing in the proposer's submittal of QBE
participation. The invest-build team shall indicate the following required information:

1. If the QBE goal is more than zero,


1. Proposers, at the time the Price Proposal is submitted, shall submit a listing
of QBE participation, including the names and addresses on Listing of QBE
Subcontractors contained elsewhere in the contract documents in order for
the Price Proposal to be considered responsive. Proposers shall indicate the
total dollar value of the QBE participation for the contract.
2. If proposers have no QBE participation, they shall indicate this on the
Listing of QBE Subcontractors by entering the word "None" or the number
"0." This form shall be completed in its entirety.
2. If the QBE goal is zero, proposers, at the time the Price Proposal is submitted,
shall enter the word "None"; or the number "0"; or if there is participation, add the
value on the Listing of QBE Subcontractors contained elsewhere in the contract
documents.

Blank forms will not be deemed to represent zero participation. Price Proposals
submitted that do not have QBE participation indicated on the appropriate form will not
be read publicly during the opening of the Price Proposals.

Written Documentation - Letter of Intent


The proposer shall submit written documentation for each QBE that will be used to meet
the QBE goal of the contract, indicating the proposer's commitment to use the QBE in the
contract. This documentation shall be submitted on the department's form titled Letter of
Intent.

The documentation shall be received in the office of the Contractor Utilization Engineer
or at QBE@capitalbc.com no later than 12:00 noon of the sixth calendar day following
opening of Price Proposals, unless the sixth day falls on an official state holiday. In that
situation, it is due in the office of Contractor Utilization Engineer no later than 12:00
noon on the next official state business day.

If the proposer fails to submit the Letter of Intent from each committed QBE to be used
toward the QBE goal, or if the form is incomplete (i.e., both signatures are not present),
the QBE participation will not count toward meeting the QBE goal. If the lack of this
participation drops the commitment below the QBE goal, the invest-build team shall
submit evidence of good faith efforts, completed in its entirety, to the Contractor
Utilization Engineer or QBE@capitalbc.com no later than 12:00 noon on the eighth
calendar day following opening of the Price Proposals, unless the eighth day falls on an

Department of Purchasing, Invest Build Project Office

This DOCX document was created with CKEditor and can be used for evaluation purposes
only.
QBE Contract Goals

official state holiday. In that situation, it is due in the office of the Contractor Utilization
Engineer no later than 12:00 noon on the next official state business day.