P&ID - WASTE WATER TO BIOGAS & BIOCNG PROJECT

TO

L101-BG-HDPE-150 GAS HOLDER

PAGE-2
OPTION-I
KIS SCOPE

CLIENT SCOPE

LOCAL WORKS BY CLIENT


1. Civil works
2. Local Fabrication, Erect & Installation
3. Supply and installation of Electircal
cable and accessories

TO EXISTING

CABLE & ACCESSORIES TO ALL FIELD MOTORS & AERATION TANK


CONTROL PANEL
INSTRUMENTS

DAP
DOSING SYSTEM
LFM-101 TO TANKERS FOR SALE

BF BF

10D 5D
UREA
DOSING SYSTEM
CV-137-350

PG-102
(0-4Kg/cm2)
PG-102
BV-133-15

BV-132-15
(0-4Kg/cm2)
L117-EFF-SS-
BV-133-15
BV-132-15

BV
FROM SECONDARY L117-EFF-SS- L115-EFF-SS-
BASIN
L115-EFF-SS-

L104-EFF-SS-
LT
EXISTING 102
L104-EFF-SS-

BF
L113-EFF-SS
BF
L113-EFF-SS
LT
BF
L113-EFF-SS
BF

101
BF-206
L113-EFF-SS

PRELIMINARY

CV

CV
CV

CV

STRICTLY CONFIDENTIAL
Z - IC REACTOR
L109-EFF-SS-
PU-102A
L109-EFF-SS-
PU-101A 00 24.07.23 PRELIMINARY RI AK PS
L110-EFF-SS-
REV. DATE DESCRIPTION DRN CHK APP
L110-EFF-SS-
TECHNOLOGY &
PU-102B
BIOMASS STORAGE PROJECT BY:
PU-101B TANK BIOMASS TRANSFER PUMP
EXISTING REACTOR FEED PUMPS KNOWLEDGE INTEGRATION
MEASURING TANK SERVICES (SINGAPORE)
PTE LTD.
CLIENT:

KORINDO-PAPER MILL WASTE WATER


UNIT NUMBER PU-101A/B PU-102A/B Z-ICR- 101 BST -101
PROJECT TITLE:
DESCRIPTION FEED PUMPS BIOMASS TRANSFER PUMP IC REACTOR BIOMASS STORAGE TANK WWTP TO BIOGAS & BIOCNG PLANT
SIZE/CAPACITY 1200 M3/HR 30 M3/HR 2270 M3 350 M3
SHEET CONTENT:
MOC/MATERIAL SS 304 SS 304 MSEP MSEP PIPING AND INSTRUMENTATION DRAWING

WORKING PRES.IN BAR 3.0 BAR 3.0 BAR ATM ATM SCALE: PROJECT CODE & NUMBER: PLANT: SIZE:
N.T.S - - -
WORKING TEMP.IN_°C AMBIENT AMBIENT AMBIENT AMBIENT

SPX/KBL/EQU SPX/KBL/EQU CLIENT CLIENT DRAWING NO: SHEET NO.: REV.


MANUFACTURER
KIS/ZPHB/WW/KOR/BSD/P&ID/03 01 OF 07 00
QUANTITY 2NOS (1W+1S) 2NOS (1W+1S) 1 NO 1 NO
THIS DRAWING AND BIOCLEAN® BIOCNG ® ARE REGISTERED TM/
ZPHB®-IC, BIOCLEAN® BIOCNG ®TECHNOLOGIES INTELLECTUAL PROPERTY OF KIS GROUP.
ANY DUPLICATION USE/COPY IS STRICTLY PROHIBITED.
P&ID - WASTE WATER TO BIOGAS & BIOCNG PROJECT

OPTION-I OPTION-I
L202-BG-HDPE-150
KIS SCOPE

CLIENT SCOPE

LOCAL WORKS BY CLIENT


CABLE & ACCESSORIES TO ALL FIELD MOTORS & 1. Civil works
CONTROL PANEL
INSTRUMENTS
2. Local Fabrication, Erect & Installation
3. Supply and installation of Electircal
cable and accessories

BF-202
AIRBLOWER
AB-201A/B

L202-BG-HDPE-150
L202-BG-HDPE-150

BG-SS-150

BG-SS-150
L203-BG-HDPE-150
L201-BG-HDPE-150

FROM TO
IC REACTOR SCRUBBER

BV (Ø15)
BF-201 BF-204

BV203
PAGE-1 BV201 PAGE-3
(15Ø)

BG-SS-100
L204-GHD-SS-50 PRELIMINARY
TO DRAIN
STRICTLY CONFIDENTIAL
BF-203 BV202
(100Ø) PAGE-3
00 24.07.23 PRELIMINARY RI AK PS
REV. DATE DESCRIPTION DRN CHK APP

DOUBLE MEMBRANE GAS HOLDER TECHNOLOGY &


PROJECT BY:

GH-201 KNOWLEDGE INTEGRATION


PRESSURE RELIEF SERVICES (SINGAPORE)
PTE LTD.
VALVE (PRV-201) CLIENT:

KORINDO-PAPER MILL WASTE WATER


UNIT NUMBER GH-201 PROJECT TITLE:

DESCRIPTION RAW DOUBLE MEMBRANE GH WWTP TO BIOGAS & BIOCNG PLANT


SIZE/CAPACITY 500 M3
SHEET CONTENT:

MOC/MATERIAL POLYESTER FABRIC PIPING AND INSTRUMENTATION DRAWING


WORKING PRES.IN BAR 5-10mBAR SCALE: PROJECT CODE & NUMBER: PLANT: SIZE:

40°-50° C N.T.S - - -
WORKING TEMP.IN_°C
DRAWING NO: SHEET NO.: REV.
MANUFACTURER KIS
KIS/ZPHB/WW/KOR/BSD/P&ID/03 02 OF 07 00
QUANTITY 1 No.
THIS DRAWING AND BIOCLEAN® BIOCNG® ARE REGISTERED TM/
ZPHB®-IC, BIOCLEAN® BIOCNG ®TECHNOLOGIES INTELLECTUAL PROPERTY OF KIS GROUP.
ANY DUPLICATION USE/COPY IS STRICTLY PROHIBITED.
P&ID - WASTE WATER TO BIOGAS & BIOCNG PROJECT
OPTION-I
L111A-EFF-CPVC-50

L111B-EFF-CPVC-50
L111A-EFF-CPVC-50

L111B-EFF-CPVC-50
L111A-EFF-CPVC-50

L111B-EFF-CPVC-50
OPTION-I
KIS SCOPE

LIQUID TRANSFER PUMP TO


EVAPORATOR PU-103A&B
L113-EFF-CPVC-50 CLIENT SCOPE
PU-103A PU-304A L106-EFF-CPVC-32

LOCAL WORKS BY CLIENT


1. Civil works
L116-EFF-CPVC-80

L115-AIR-MS-300

L116-EFF-CPVC-80
L112-EFF-CPVC-50 PU-103B PU-304B
L114-EFF-CPVC-50
L128-SW-CPVC-50 L128-SW-CPVC-50 L128-SW-CPVC-50
L106-EFF-CPVC-32 L119-SW-GI-50 L119-SW-GI-50 L119-SW-GI-50
2. Local Fabrication, Erect & Installation
ABL-101A LIQUID TRANSFER PUMP

Drain
TO SCRUBBER PU-104A&B L109-EFF-CPVC-40 L109-EFF-CPVC-40
3. Supply and installation of Electircal

L106-EFF-CPVC-32

L109-EFF-CPVC-40
AIR BLOWER TO EVAPORATOR
ABL-101A/B
ABL-101B
cable and accessories
Drain

L116-EFF-CPVC-80 L116-EFF-CPVC-80

L119-SW-GI-50 L119-SW-GI-50

L128-SW-CPVC-50 L128-SW-CPVC-50
L125-SW-CPVC-50

L109-EFF-CPVC-40

L126-SW-CPVC-50
L116-EFF-CPVC-80

PU-306A

PU-107A

PU-306B
CMT - 301 L109-EFF-CPVC-40 L127-EFF-CPVC-50
L109-EFF-CPVC-40 L109-EFF-CPVC-40
L116-EFF-CPVC-80 L128-EFF-CPVC-50
PU-107B L107-EFF-CPVC-80 L107-EFF-CPVC-80 WASH WATER PUMP TO
L117-EFF-CPVC-65 FILTER PRESS PU-306A&B

L106-EFF-CPVC-32
L117-EFF-CPVC-65
CHEMICAL TRANSFER
PUMP PU-107A&B

L107-EFF-CPVC-80 L111-BG-HDPE-150
SUM - 301

L111-BG-HDPE-150

FRL
COMP-101A
L110B-EFF-CPVC-32 L110B-EFF-CPVC-32
EXCESS L109-EFF-CPVC-40
EFFLUENT

FRL
COMP-101B

L105-BG-HDPE-100

L105-BG-HDPE-100
L108A-EFF-CPVC-100

RO/DM WATER L119-SW-GI-50 L119-SW-GI-50


INLET (LESS TDS)
L119-SW-GI-50

L108A-EFF-CPVC-100
HEIGHT OF U TUBE

L111-BG-HDPE-150
L106-EFF-CPVC-32
GAS L130-BG-HDPE-150 L129-BG-HDPE-150

L111B-EFF-CPVC-50
HOLDER

L108A-EFF-CPVC-100

L111A-EFF-CPVC-50
MT
PAGE-4
L105B-BG-HDPE-100

L107-EFF-CPVC-80

L106-EFF-CPVC-32

L107-EFF-CPVC-80
L119-EFF-CPVC-65
L111-BG-HDPE-150
L119-EFF-CPVC-65

At the time of scrubber draining

CABLE & ACCESSORIES TO ALL FIELD MOTORS & Before this valve will open

CONTROL PANEL
L105-BG-HDPE-100

INSTRUMENTS L107-EFF-CPVC-80

L110B-EFF-CPVC-32
L124-SW-CPVC-50

L124-SW-CPVC-50
GWC - 301
L119-SW-GI-50
L108A-EFF-CPVC-100
PU-105A
L107-EFF-CPVC-80

L109-EFF-CPVC-40
L111B-EFF-CPVC-50
PU-105B
L118-EFF-CPVC-80

WASH COLUMN RECIRCULATION


COOLING L120-CW-CPVC-50 L120-CW-CPVC-50 PUMP PU-105A&B
WATER OUTLET

L110B-EFF-CPVC-32
PAGE-3 Air Inlet line 300mm
above the overflow
line to RLHT
COOLING L121-CW-CPVC-50 L121-CW-CPVC-50
WATER INLET L124-EFF-CPVC-150 PRELIMINARY

L109-EFF-CPVC-40
L105-BG-HDPE-100

PAGE-3

STRICTLY CONFIDENTIAL
CPVC

L105-BG-HDPE-100

L123-EFF-CPVC-50

00 24.07.23 PRELIMINARY RI AK PS
L104-BG-SS-100

L102A-BG-HDPE-150 REV. DATE DESCRIPTION DRN CHK APP


PU-302A
PU-301A
STHE-101
L107-EFF-CPVC-80

L103A-BG-SS-100
TECHNOLOGY &
L110B-EFF-CPVC-32
BL-301A PU-302B
PROJECT BY:
Drain

FROM RAW PU-301B L110A-EFF-CPVC-50


GAS HOLDER Drain
L102B-BG-HDPE-150
MT LIQUID TRANSFER PUMP TO
L101A-BG-HDPE-150 FILTRE PRESS PU-302A&B KNOWLEDGE INTEGRATION
L103B-BG-SS-100 EJECTOR RECIRCULATION PUMP
PU-301A&B
SERVICES (SINGAPORE)
BL-301B
BOOSTER BLOWER L107-EFF-CPVC-80
PTE LTD.
L102C-BG-SS-100 CLIENT:
KORINDO-PAPER MILL WASTE WATER

UNIT NUMBER BL-301A/301B SCR-301 GWC - 301 REG - 301 RLT -301 FP - 301A/B FHT - 301 WWT - 301A/B CMT - 301 SUM - 301 PU - 301 A&B PU - 302 A&B PU - 303 A&B PU - 304 A&B PU - 305 A&B PU - 306 A&B PU - 307 A&B ABL-301A/301B STHE-301 COMP-301A/301B PROJECT TITLE:
WASH WATER COLUMN WASH WATER PUMP TO WWTP TO BIOGAS & BIOCNG PLANT
DESCRIPTION REGENERATED LIQUID FILTER PRESS 1&2 FILTRATE WASH WATER TANK CHEMICAL EJECTOR LIQUID TRANSFER PUMP LIQUID TRANSFER PUMP LIQUID TRANSFER PUMP CHEMICAL SHELL AND TUBE
BOOSTER BLOWER SCRUBBER GAS WASH COLUMN REGENERATOR
HOLDING TANK HOLDING TANK MIXING TANK SUMP RECIRCULATION PUMP TO FILTER PRESS TO EVAPORATOR TO SCRUBBER RECIRCULATION PUMP FILTER PRESS TRANSFER PUMP AIR BLOWER HEAT EXCHANGER AIR COMPRESSOR
SHEET CONTENT:
SIZE/CAPACITY 550 M3/HR 550M3/HR 550 M3/HR 2.8M3 2.0 M3 9.0M3/HR 2.0 M3 2.0 M3 5.0 M3 50 M3 27 M3/HR 9 M3/HR 9 M3/HR 9 M3/HR 5.5 M3/HR 9 M3/HR 9 M3/HR 3600 M3/HR 550 M3/HR
PIPING AND INSTRUMENTATION DRAWING
MOC/MATERIAL CI PPFRP PPFRP PPFRP PPFRP PP PPFRP PPFRP PPFRP RCC SS304/316 SS304/316 SS304/316 SS304/316 SS304/316 SS304/316 SS304/316 MS MS
SCALE: PROJECT CODE & NUMBER: PLANT: SIZE:
WORKING PRES.IN BAR 0.6 BAR ATM ATM ATM ATM 5.0 ATM ATM ATM ATM 5 BAR 5 BAR 2 BAR 2 BAR 2 BAR 5 BAR 2 BAR 0.03BAR 0.6BARG
N.T.S - - -
WORKING TEMP.IN_°C 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40
DRAWING NO: SHEET NO.: REV.
MANUFACTURER KIS KIS KIS KIS KIS KIS KIS KIS KIS KIS SPX/KBL/EQU SPX/KBL/EQU SPX/KBL/EQU SPX/KBL/EQU SPX/KBL/EQU SPX/KBL/EQU SPX/KBL/EQU ABL KIS ELGI/EQU
KIS/ZPHB/WW/KOR/BSD/P&ID/03 03 OF 07 00
QUANTITY 2 Nos. (1W+1S) 2 Nos. 01 No. 01 No. 01 No. 2 Nos. 01 No. 2 Nos. 01 No. 01 No. 2 Nos. (1W+1S) 2 Nos. (1W+1S) 2 Nos. (1W+1S) 2 Nos. (1W+1S) 2 Nos. (1W+1S) 2 Nos. (1W+1S) 2 Nos. (1W+1S) 2 Nos. (1W+1S) 1 Nos. 2 Nos.
THIS DRAWING AND BIOCLEAN® BIOCNG ® ARE REGISTERED TM/
ZPHB®-IC, BIOCLEAN® BIOCNG ®TECHNOLOGIES INTELLECTUAL PROPERTY OF KIS GROUP.
ANY DUPLICATION USE/COPY IS STRICTLY PROHIBITED.
P&ID - WASTE WATER BIOGAS TO BIOCNG PROJECT
OPTION-I
L202-BG-HDPE-150 OPTION-I
KIS SCOPE

CLIENT SCOPE

LOCAL WORKS BY CLIENT


1. Civil works
2. Local Fabrication, Erect & Installation

CABLE & ACCESSORIES TO ALL FIELD MOTORS & 3. Supply and installation of Electircal
CONTROL PANEL
INSTRUMENTS cable and accessories

BF-402
L202-BG-HDPE-150

L202-BG-HDPE-150
BG-SS-150

BG-SS-150
AIRBLOWER
L203-BG-HDPE-150
L201-BG-HDPE-150 AB-201A/B

FROM TO
SCRUBER UPGRADATION

BV (Ø15)
BF-401 BF-404

BV203
PAGE-3 BV401 PAGE-5
(15Ø)

BG-SS-100
L204-GHD-SS-50 PRELIMINARY
TO DRAIN
STRICTLY CONFIDENTIAL
BF-403 BV402
(100Ø)
00 24.07.23 PRELIMINARY RI AK PS

REV. DATE DESCRIPTION DRN CHK APP

DOUBLE MEMBRANE GAS HOLDER TECHNOLOGY &


PROJECT BY:
GH-401 KNOWLEDGE INTEGRATION
PRESSURE RELIEF SERVICES (SINGAPORE)
VALVE (PRV-401) PTE LTD.
CLIENT:

KORINDO-PAPER MILL WASTE WATER


UNIT NUMBER GH-401 PROJECT TITLE:

DESCRIPTION PURIFIED DOUBLE MEMBRANE GH WWTP TO BIOGAS & BIOCNG PLANT


SIZE/CAPACITY 1000 M3
SHEET CONTENT:

MOC/MATERIAL POLYESTER FABRIC PIPING AND INSTRUMENTATION DRAWING


WORKING PRES.IN BAR 5-10mBAR SCALE: PROJECT CODE & NUMBER: PLANT: SIZE:

N.T.S - - -
WORKING TEMP.IN_°C 40°-50° C
DRAWING NO: SHEET NO.: REV.
MANUFACTURER KIS
KIS/ZPHB/WW/KOR/BSD/P&ID/03 04 OF 07 00
QUANTITY 1 No.
THIS DRAWING AND BIOCLEAN® BIOCNG® ARE REGISTERED TM/
ZPHB®-IC, BIOCLEAN® BIOCNG ®TECHNOLOGIES INTELLECTUAL PROPERTY OF KIS GROUP.
ANY DUPLICATION USE/COPY IS STRICTLY PROHIBITED.
P&ID - WASTE WATER TO BIOGAS & BIOCNG PROJECT

OPTION-I OPTION-I
GV-03

NV-35 NV-37 NV-39 NV-41


KIS SCOPE

CABLE & ACCESSORIES TO ALL FIELD MOTORS & CLIENT SCOPE


CONTROL PANEL

NV-34

NV-36

NV-38

NV-40
INSTRUMENTS
LOCAL WORKS BY CLIENT
GV-01 GV-02
1.Civil works
2.Local Fabrication, Erect & InstalL.

NV-30

NV-31

NV-32

NV-33
FROM L339-AIR-MS-25
3.Supply and install. of Electrical
ONLINE ANALYZER
COMPRESSOR ANL-301
₂S Analyser :- ppm
GV-04
CH4 Analyser :- % cable and accessories
PAGE-4 CO2 Analyser
O2 Analyser
:%
:%
N2 Analayser :%

NV
NV

NV

NV

NV
NV-311 NV-312 NV-313 NV-314 NV-315
Dew Point Meter :- (-)°C

NV
NV-316

BV-319
(15Ø)

TO
COMPRESSOR
SVT-501
B-321 PAGE-6

L331-BG-MS-50NB
BV-318
BV-301
ST-501
FROM L301-BG-HDPE-150
(15Ø)
VPSA-501 VPSA-502 VPSA-503 VPSA-504
GAS HOLDER
PAGE-4

BV-320 BV-321
NV

NV-301
NV-29 VENT
GDU-501 GDU-502 GDU-503 GDU-504

L301-BG-HDPE-150
NV

NV

NV

NV

NV
NV
NV-310 NV-309 NV-308 NV-307

NV-317 NV-318

BF-305 BF-307
NV-20

NV-21

NV-22

NV-23

NV-24

NV-25

NV-26

NV-27
BF-301

L341-SW-CPVC-25 NRV-08 VP-302

NV-28
BV-322

L348-BG-MS-80NB
BV-303

VT-501
L302-BG-HDPE-100

PSV NV-302
NV

NRV-07

NV
NRV-01 BF-302
BV-317 NV-319

BF-306 BF-308
CO2 VENT
B-501
BV-302

VP-501 VACUUM POT

BV-323
L338-SW-CPVC-25
NRV-03

L341-SW-CPVC-25
TO HEAT
L342-SW-CPVC-50
EXCHANGER
NRV-04 Inlet PAGE-3
L301-BG-HDPE-150
FROM HEAT
NV
BF-303

NV-304

NV
BV-315 NV-306 BV-313 EXCHANGER
NRV-05 PAGE-3
L335-SW-UPVC-50
PRELIMINARY
ACH-501

P-502
AC-501

L303-BG-HDPE100
BV-305

CH-501
STRICTLY CONFIDENTIAL
MS-501

MS-502

Overflow

PF-501 BV-311
PSV NV-303
NV

BV-312
BV-306
NV

BF-304
BV-308 Suction/Outlet
NRV-02 BV-316 NV-305
BV-314 Drain

00 24.07.23 PRELIMINARY RI AK PS
BV-310 NRV-06
BV-307 BV-309
L334-SW-UPVC-50 CT-501 REV. DATE DESCRIPTION DRN CHK APP
BV-304

B-502 P-501
ADV ADV
SUMP
TECHNOLOGY &
L337-SW-CPVC-25 L336-SW-CPVC-50 L336-SW-CPVC-50 L336-SW-CPVC-50
SERVICE WATER PROJECT BY:
INLET (LESS TDS)
KNOWLEDGE INTEGRATION
SERVICES (SINGAPORE)
PTE LTD.
CLIENT:
UNIT NUMBER B-501/502 PF-501 AC-501 ACH-501 MS-501 CH-501 GDU-501/502/503/504 VPSA-501/502/503/504 ST-501 VT-501 VP-501/502 CT-501 P-501/502 SV-501
KORINDO-PAPER MILL WASTE WATER
DESCRIPTION BLOWERS PRE-FILTER AIR COOLER AIR CHILLER MOISTURE SEPERATOR CHILLER GDU TOWER VPSA TOWER STORAGE TANK VACUUM TANK VACUUM PUMP COOLING TOWER WATER PUMP SURGE VESSEL
PROJECT TITLE:

SIZE/CAPACITY 550 M3/HR 550 M3/HR 550 M3/HR - 550 M3/HR 10 TR 550 M3/HR 550 M3/HR 20 M3 M3 550 M3/HR 50 TR 25 M3/HR 30M3 WWTP TO BIOGAS & BIOCNG PLANT

MOC/MATERIAL MS MS MS MS MS - MS MS MS MS CI MS CI MS SHEET CONTENT:

PIPING AND INSTRUMENTATION DRAWING


WORKING PRES.IN BAR 0.8 0.8 0.8 0.8 0.8 - 0.8 0.8 0.3 0.3 650 HG ATM 2 0.3
SCALE: PROJECT CODE & NUMBER: PLANT: SIZE:
WORKING TEMP.IN_°C 40 40 - - - 13-32° C ATM - - - 40° C 40° C ATM - N.T.S - - -

MANUFACTURER KIS KIS KIS KIS KIS NUAIR/EQU KIS KIS KIS KIS KIS APPROVED KIS APPROVED KBL/SPX/EQU KIS DRAWING NO: SHEET NO.: REV.
KIS/ZPHB/WW/KOR/BSD/P&ID/03
QUANTITY 2 Nos. (1W+1S) 1 Nos. 1 No. 1 No. 2 Nos. 1 No. 4 Nos. 4 Nos. 1 No. 1 No. 2 Nos. (1W+1S) 1 No. 2 Nos. (1W+1S) 1 No. 05 OF 07 00
THIS DRAWING AND BIOCLEAN® BIOCNG® ARE REGISTERED TM/
ZPHB®-IC, BIOCLEAN® BIOCNG ®TECHNOLOGIES INTELLECTUAL PROPERTY OF KIS GROUP.
ANY DUPLICATION USE/COPY IS STRICTLY PROHIBITED.
P&ID - WASTE WATER TO BIOGAS & BIOCNG PROJECT

OPTION-I OPTION-I
KIS SCOPE

CLIENT SCOPE

LOCAL WORKS BY CLIENT


1. Civil works
GFM
701 2. Local Fabrication, Erect & Installation
BF-402 3. Supply and installation of Electircal
FROM
cable and accessories
PSA SYSTEM
50x80

CABLE & ACCESSORIES TO ALL FIELD MOTORS &


CONTROL PANEL
INSTRUMENTS

CASCADE

PRELIMINARY
STRICTLY CONFIDENTIAL
MOVABLE
CYLINDER CASCADES ( CC 601)
CASCADE
00 24.07.23 PRELIMINARY RI AK PS

REV. DATE DESCRIPTION DRN CHK APP

TECHNOLOGY &
PROJECT BY:

KNOWLEDGE INTEGRATION
SERVICES (SINGAPORE)
PTE LTD.
CLIENT:
KORINDO-PAPER MILL WASTE WATER
UNIT NUMBER HP-601 CC-601
PROJECT TITLE:
DESCRIPTION HIGH PRESSURE COMPRESSOR CYLINDER CASCADES WWTP TO BIOGAS & BIOCNG PLANT
SIZE/CAPACITY 300 M3/hr 500 KGS SHEET CONTENT:

MOC/MATERIAL CS/SS MS PIPING AND INSTRUMENTATION DRAWING

WORKING PRES.IN BAR 0.3-250BAR 250 BAR SCALE: PROJECT CODE & NUMBER: PLANT: SIZE:

40° C 40° C N.T.S - - -


WORKING TEMP.IN_°C
DRAWING NO: SHEET NO.: REV.
MANUFACTURER BAUER /EQU RAMA/EQU
KIS/ZPHB/WW/KOR/BSD/P&ID/03
QUANTITY 1 Nos 10 NOS 06 OF 07 00