Professional Documents
Culture Documents
Option 1 - Critical Equipments Supply
Option 1 - Critical Equipments Supply
TO
PAGE-2
OPTION-I
KIS SCOPE
CLIENT SCOPE
TO EXISTING
DAP
DOSING SYSTEM
LFM-101 TO TANKERS FOR SALE
BF BF
10D 5D
UREA
DOSING SYSTEM
CV-137-350
PG-102
(0-4Kg/cm2)
PG-102
BV-133-15
BV-132-15
(0-4Kg/cm2)
L117-EFF-SS-
BV-133-15
BV-132-15
BV
FROM SECONDARY L117-EFF-SS- L115-EFF-SS-
BASIN
L115-EFF-SS-
L104-EFF-SS-
LT
EXISTING 102
L104-EFF-SS-
BF
L113-EFF-SS
BF
L113-EFF-SS
LT
BF
L113-EFF-SS
BF
101
BF-206
L113-EFF-SS
PRELIMINARY
CV
CV
CV
CV
STRICTLY CONFIDENTIAL
Z - IC REACTOR
L109-EFF-SS-
PU-102A
L109-EFF-SS-
PU-101A 00 24.07.23 PRELIMINARY RI AK PS
L110-EFF-SS-
REV. DATE DESCRIPTION DRN CHK APP
L110-EFF-SS-
TECHNOLOGY &
PU-102B
BIOMASS STORAGE PROJECT BY:
PU-101B TANK BIOMASS TRANSFER PUMP
EXISTING REACTOR FEED PUMPS KNOWLEDGE INTEGRATION
MEASURING TANK SERVICES (SINGAPORE)
PTE LTD.
CLIENT:
WORKING PRES.IN BAR 3.0 BAR 3.0 BAR ATM ATM SCALE: PROJECT CODE & NUMBER: PLANT: SIZE:
N.T.S - - -
WORKING TEMP.IN_°C AMBIENT AMBIENT AMBIENT AMBIENT
OPTION-I OPTION-I
L202-BG-HDPE-150
KIS SCOPE
CLIENT SCOPE
BF-202
AIRBLOWER
AB-201A/B
L202-BG-HDPE-150
L202-BG-HDPE-150
BG-SS-150
BG-SS-150
L203-BG-HDPE-150
L201-BG-HDPE-150
FROM TO
IC REACTOR SCRUBBER
BV (Ø15)
BF-201 BF-204
BV203
PAGE-1 BV201 PAGE-3
(15Ø)
BG-SS-100
L204-GHD-SS-50 PRELIMINARY
TO DRAIN
STRICTLY CONFIDENTIAL
BF-203 BV202
(100Ø) PAGE-3
00 24.07.23 PRELIMINARY RI AK PS
REV. DATE DESCRIPTION DRN CHK APP
40°-50° C N.T.S - - -
WORKING TEMP.IN_°C
DRAWING NO: SHEET NO.: REV.
MANUFACTURER KIS
KIS/ZPHB/WW/KOR/BSD/P&ID/03 02 OF 07 00
QUANTITY 1 No.
THIS DRAWING AND BIOCLEAN® BIOCNG® ARE REGISTERED TM/
ZPHB®-IC, BIOCLEAN® BIOCNG ®TECHNOLOGIES INTELLECTUAL PROPERTY OF KIS GROUP.
ANY DUPLICATION USE/COPY IS STRICTLY PROHIBITED.
P&ID - WASTE WATER TO BIOGAS & BIOCNG PROJECT
OPTION-I
L111A-EFF-CPVC-50
L111B-EFF-CPVC-50
L111A-EFF-CPVC-50
L111B-EFF-CPVC-50
L111A-EFF-CPVC-50
L111B-EFF-CPVC-50
OPTION-I
KIS SCOPE
L115-AIR-MS-300
L116-EFF-CPVC-80
L112-EFF-CPVC-50 PU-103B PU-304B
L114-EFF-CPVC-50
L128-SW-CPVC-50 L128-SW-CPVC-50 L128-SW-CPVC-50
L106-EFF-CPVC-32 L119-SW-GI-50 L119-SW-GI-50 L119-SW-GI-50
2. Local Fabrication, Erect & Installation
ABL-101A LIQUID TRANSFER PUMP
Drain
TO SCRUBBER PU-104A&B L109-EFF-CPVC-40 L109-EFF-CPVC-40
3. Supply and installation of Electircal
L106-EFF-CPVC-32
L109-EFF-CPVC-40
AIR BLOWER TO EVAPORATOR
ABL-101A/B
ABL-101B
cable and accessories
Drain
L116-EFF-CPVC-80 L116-EFF-CPVC-80
L119-SW-GI-50 L119-SW-GI-50
L128-SW-CPVC-50 L128-SW-CPVC-50
L125-SW-CPVC-50
L109-EFF-CPVC-40
L126-SW-CPVC-50
L116-EFF-CPVC-80
PU-306A
PU-107A
PU-306B
CMT - 301 L109-EFF-CPVC-40 L127-EFF-CPVC-50
L109-EFF-CPVC-40 L109-EFF-CPVC-40
L116-EFF-CPVC-80 L128-EFF-CPVC-50
PU-107B L107-EFF-CPVC-80 L107-EFF-CPVC-80 WASH WATER PUMP TO
L117-EFF-CPVC-65 FILTER PRESS PU-306A&B
L106-EFF-CPVC-32
L117-EFF-CPVC-65
CHEMICAL TRANSFER
PUMP PU-107A&B
L107-EFF-CPVC-80 L111-BG-HDPE-150
SUM - 301
L111-BG-HDPE-150
FRL
COMP-101A
L110B-EFF-CPVC-32 L110B-EFF-CPVC-32
EXCESS L109-EFF-CPVC-40
EFFLUENT
FRL
COMP-101B
L105-BG-HDPE-100
L105-BG-HDPE-100
L108A-EFF-CPVC-100
L108A-EFF-CPVC-100
HEIGHT OF U TUBE
L111-BG-HDPE-150
L106-EFF-CPVC-32
GAS L130-BG-HDPE-150 L129-BG-HDPE-150
L111B-EFF-CPVC-50
HOLDER
L108A-EFF-CPVC-100
L111A-EFF-CPVC-50
MT
PAGE-4
L105B-BG-HDPE-100
L107-EFF-CPVC-80
L106-EFF-CPVC-32
L107-EFF-CPVC-80
L119-EFF-CPVC-65
L111-BG-HDPE-150
L119-EFF-CPVC-65
CABLE & ACCESSORIES TO ALL FIELD MOTORS & Before this valve will open
CONTROL PANEL
L105-BG-HDPE-100
INSTRUMENTS L107-EFF-CPVC-80
L110B-EFF-CPVC-32
L124-SW-CPVC-50
L124-SW-CPVC-50
GWC - 301
L119-SW-GI-50
L108A-EFF-CPVC-100
PU-105A
L107-EFF-CPVC-80
L109-EFF-CPVC-40
L111B-EFF-CPVC-50
PU-105B
L118-EFF-CPVC-80
L110B-EFF-CPVC-32
PAGE-3 Air Inlet line 300mm
above the overflow
line to RLHT
COOLING L121-CW-CPVC-50 L121-CW-CPVC-50
WATER INLET L124-EFF-CPVC-150 PRELIMINARY
L109-EFF-CPVC-40
L105-BG-HDPE-100
PAGE-3
STRICTLY CONFIDENTIAL
CPVC
L105-BG-HDPE-100
L123-EFF-CPVC-50
00 24.07.23 PRELIMINARY RI AK PS
L104-BG-SS-100
L103A-BG-SS-100
TECHNOLOGY &
L110B-EFF-CPVC-32
BL-301A PU-302B
PROJECT BY:
Drain
UNIT NUMBER BL-301A/301B SCR-301 GWC - 301 REG - 301 RLT -301 FP - 301A/B FHT - 301 WWT - 301A/B CMT - 301 SUM - 301 PU - 301 A&B PU - 302 A&B PU - 303 A&B PU - 304 A&B PU - 305 A&B PU - 306 A&B PU - 307 A&B ABL-301A/301B STHE-301 COMP-301A/301B PROJECT TITLE:
WASH WATER COLUMN WASH WATER PUMP TO WWTP TO BIOGAS & BIOCNG PLANT
DESCRIPTION REGENERATED LIQUID FILTER PRESS 1&2 FILTRATE WASH WATER TANK CHEMICAL EJECTOR LIQUID TRANSFER PUMP LIQUID TRANSFER PUMP LIQUID TRANSFER PUMP CHEMICAL SHELL AND TUBE
BOOSTER BLOWER SCRUBBER GAS WASH COLUMN REGENERATOR
HOLDING TANK HOLDING TANK MIXING TANK SUMP RECIRCULATION PUMP TO FILTER PRESS TO EVAPORATOR TO SCRUBBER RECIRCULATION PUMP FILTER PRESS TRANSFER PUMP AIR BLOWER HEAT EXCHANGER AIR COMPRESSOR
SHEET CONTENT:
SIZE/CAPACITY 550 M3/HR 550M3/HR 550 M3/HR 2.8M3 2.0 M3 9.0M3/HR 2.0 M3 2.0 M3 5.0 M3 50 M3 27 M3/HR 9 M3/HR 9 M3/HR 9 M3/HR 5.5 M3/HR 9 M3/HR 9 M3/HR 3600 M3/HR 550 M3/HR
PIPING AND INSTRUMENTATION DRAWING
MOC/MATERIAL CI PPFRP PPFRP PPFRP PPFRP PP PPFRP PPFRP PPFRP RCC SS304/316 SS304/316 SS304/316 SS304/316 SS304/316 SS304/316 SS304/316 MS MS
SCALE: PROJECT CODE & NUMBER: PLANT: SIZE:
WORKING PRES.IN BAR 0.6 BAR ATM ATM ATM ATM 5.0 ATM ATM ATM ATM 5 BAR 5 BAR 2 BAR 2 BAR 2 BAR 5 BAR 2 BAR 0.03BAR 0.6BARG
N.T.S - - -
WORKING TEMP.IN_°C 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40
DRAWING NO: SHEET NO.: REV.
MANUFACTURER KIS KIS KIS KIS KIS KIS KIS KIS KIS KIS SPX/KBL/EQU SPX/KBL/EQU SPX/KBL/EQU SPX/KBL/EQU SPX/KBL/EQU SPX/KBL/EQU SPX/KBL/EQU ABL KIS ELGI/EQU
KIS/ZPHB/WW/KOR/BSD/P&ID/03 03 OF 07 00
QUANTITY 2 Nos. (1W+1S) 2 Nos. 01 No. 01 No. 01 No. 2 Nos. 01 No. 2 Nos. 01 No. 01 No. 2 Nos. (1W+1S) 2 Nos. (1W+1S) 2 Nos. (1W+1S) 2 Nos. (1W+1S) 2 Nos. (1W+1S) 2 Nos. (1W+1S) 2 Nos. (1W+1S) 2 Nos. (1W+1S) 1 Nos. 2 Nos.
THIS DRAWING AND BIOCLEAN® BIOCNG ® ARE REGISTERED TM/
ZPHB®-IC, BIOCLEAN® BIOCNG ®TECHNOLOGIES INTELLECTUAL PROPERTY OF KIS GROUP.
ANY DUPLICATION USE/COPY IS STRICTLY PROHIBITED.
P&ID - WASTE WATER BIOGAS TO BIOCNG PROJECT
OPTION-I
L202-BG-HDPE-150 OPTION-I
KIS SCOPE
CLIENT SCOPE
CABLE & ACCESSORIES TO ALL FIELD MOTORS & 3. Supply and installation of Electircal
CONTROL PANEL
INSTRUMENTS cable and accessories
BF-402
L202-BG-HDPE-150
L202-BG-HDPE-150
BG-SS-150
BG-SS-150
AIRBLOWER
L203-BG-HDPE-150
L201-BG-HDPE-150 AB-201A/B
FROM TO
SCRUBER UPGRADATION
BV (Ø15)
BF-401 BF-404
BV203
PAGE-3 BV401 PAGE-5
(15Ø)
BG-SS-100
L204-GHD-SS-50 PRELIMINARY
TO DRAIN
STRICTLY CONFIDENTIAL
BF-403 BV402
(100Ø)
00 24.07.23 PRELIMINARY RI AK PS
N.T.S - - -
WORKING TEMP.IN_°C 40°-50° C
DRAWING NO: SHEET NO.: REV.
MANUFACTURER KIS
KIS/ZPHB/WW/KOR/BSD/P&ID/03 04 OF 07 00
QUANTITY 1 No.
THIS DRAWING AND BIOCLEAN® BIOCNG® ARE REGISTERED TM/
ZPHB®-IC, BIOCLEAN® BIOCNG ®TECHNOLOGIES INTELLECTUAL PROPERTY OF KIS GROUP.
ANY DUPLICATION USE/COPY IS STRICTLY PROHIBITED.
P&ID - WASTE WATER TO BIOGAS & BIOCNG PROJECT
OPTION-I OPTION-I
GV-03
NV-34
NV-36
NV-38
NV-40
INSTRUMENTS
LOCAL WORKS BY CLIENT
GV-01 GV-02
1.Civil works
2.Local Fabrication, Erect & InstalL.
NV-30
NV-31
NV-32
NV-33
FROM L339-AIR-MS-25
3.Supply and install. of Electrical
ONLINE ANALYZER
COMPRESSOR ANL-301
₂S Analyser :- ppm
GV-04
CH4 Analyser :- % cable and accessories
PAGE-4 CO2 Analyser
O2 Analyser
:%
:%
N2 Analayser :%
NV
NV
NV
NV
NV
NV-311 NV-312 NV-313 NV-314 NV-315
Dew Point Meter :- (-)°C
NV
NV-316
BV-319
(15Ø)
TO
COMPRESSOR
SVT-501
B-321 PAGE-6
L331-BG-MS-50NB
BV-318
BV-301
ST-501
FROM L301-BG-HDPE-150
(15Ø)
VPSA-501 VPSA-502 VPSA-503 VPSA-504
GAS HOLDER
PAGE-4
BV-320 BV-321
NV
NV-301
NV-29 VENT
GDU-501 GDU-502 GDU-503 GDU-504
L301-BG-HDPE-150
NV
NV
NV
NV
NV
NV
NV-310 NV-309 NV-308 NV-307
NV-317 NV-318
BF-305 BF-307
NV-20
NV-21
NV-22
NV-23
NV-24
NV-25
NV-26
NV-27
BF-301
NV-28
BV-322
L348-BG-MS-80NB
BV-303
VT-501
L302-BG-HDPE-100
PSV NV-302
NV
NRV-07
NV
NRV-01 BF-302
BV-317 NV-319
BF-306 BF-308
CO2 VENT
B-501
BV-302
BV-323
L338-SW-CPVC-25
NRV-03
L341-SW-CPVC-25
TO HEAT
L342-SW-CPVC-50
EXCHANGER
NRV-04 Inlet PAGE-3
L301-BG-HDPE-150
FROM HEAT
NV
BF-303
NV-304
NV
BV-315 NV-306 BV-313 EXCHANGER
NRV-05 PAGE-3
L335-SW-UPVC-50
PRELIMINARY
ACH-501
P-502
AC-501
L303-BG-HDPE100
BV-305
CH-501
STRICTLY CONFIDENTIAL
MS-501
MS-502
Overflow
PF-501 BV-311
PSV NV-303
NV
BV-312
BV-306
NV
BF-304
BV-308 Suction/Outlet
NRV-02 BV-316 NV-305
BV-314 Drain
00 24.07.23 PRELIMINARY RI AK PS
BV-310 NRV-06
BV-307 BV-309
L334-SW-UPVC-50 CT-501 REV. DATE DESCRIPTION DRN CHK APP
BV-304
B-502 P-501
ADV ADV
SUMP
TECHNOLOGY &
L337-SW-CPVC-25 L336-SW-CPVC-50 L336-SW-CPVC-50 L336-SW-CPVC-50
SERVICE WATER PROJECT BY:
INLET (LESS TDS)
KNOWLEDGE INTEGRATION
SERVICES (SINGAPORE)
PTE LTD.
CLIENT:
UNIT NUMBER B-501/502 PF-501 AC-501 ACH-501 MS-501 CH-501 GDU-501/502/503/504 VPSA-501/502/503/504 ST-501 VT-501 VP-501/502 CT-501 P-501/502 SV-501
KORINDO-PAPER MILL WASTE WATER
DESCRIPTION BLOWERS PRE-FILTER AIR COOLER AIR CHILLER MOISTURE SEPERATOR CHILLER GDU TOWER VPSA TOWER STORAGE TANK VACUUM TANK VACUUM PUMP COOLING TOWER WATER PUMP SURGE VESSEL
PROJECT TITLE:
SIZE/CAPACITY 550 M3/HR 550 M3/HR 550 M3/HR - 550 M3/HR 10 TR 550 M3/HR 550 M3/HR 20 M3 M3 550 M3/HR 50 TR 25 M3/HR 30M3 WWTP TO BIOGAS & BIOCNG PLANT
MANUFACTURER KIS KIS KIS KIS KIS NUAIR/EQU KIS KIS KIS KIS KIS APPROVED KIS APPROVED KBL/SPX/EQU KIS DRAWING NO: SHEET NO.: REV.
KIS/ZPHB/WW/KOR/BSD/P&ID/03
QUANTITY 2 Nos. (1W+1S) 1 Nos. 1 No. 1 No. 2 Nos. 1 No. 4 Nos. 4 Nos. 1 No. 1 No. 2 Nos. (1W+1S) 1 No. 2 Nos. (1W+1S) 1 No. 05 OF 07 00
THIS DRAWING AND BIOCLEAN® BIOCNG® ARE REGISTERED TM/
ZPHB®-IC, BIOCLEAN® BIOCNG ®TECHNOLOGIES INTELLECTUAL PROPERTY OF KIS GROUP.
ANY DUPLICATION USE/COPY IS STRICTLY PROHIBITED.
P&ID - WASTE WATER TO BIOGAS & BIOCNG PROJECT
OPTION-I OPTION-I
KIS SCOPE
CLIENT SCOPE
CASCADE
PRELIMINARY
STRICTLY CONFIDENTIAL
MOVABLE
CYLINDER CASCADES ( CC 601)
CASCADE
00 24.07.23 PRELIMINARY RI AK PS
TECHNOLOGY &
PROJECT BY:
KNOWLEDGE INTEGRATION
SERVICES (SINGAPORE)
PTE LTD.
CLIENT:
KORINDO-PAPER MILL WASTE WATER
UNIT NUMBER HP-601 CC-601
PROJECT TITLE:
DESCRIPTION HIGH PRESSURE COMPRESSOR CYLINDER CASCADES WWTP TO BIOGAS & BIOCNG PLANT
SIZE/CAPACITY 300 M3/hr 500 KGS SHEET CONTENT:
WORKING PRES.IN BAR 0.3-250BAR 250 BAR SCALE: PROJECT CODE & NUMBER: PLANT: SIZE: