Procedure for
Managing Casing / Tubing straps on the Rig
Control Tier#4 Uncontrolled Copy if printed Revision date: 28th May 2023
Procedure for Managing Casing / Tubing straps on the Rig
Page - 2 of 6
Table of Contents
# Section Page No
2.0 Objective 3
3.0 Definitions 3
7.0 Abbreviations 5
Annexures
Annexure -1 6
Control Tier#4 Uncontrolled Copy if printed Revision date: 28th May 2023
Procedure for Managing Casing / Tubing straps on the Rig
Page - 3 of 6
Purpose
The purpose of this document is to establish a process of managing and avoid usage
of casing straps on E&D Directorate rigs, as well as establish the method of
destroying any casing straps that arrived to the rig site with casing / tubing bundles.
Scope
The scope of this procedure applies, in general, to Deep Drilling and Development
Drilling Groups, rig Contractors, Subcontractors and Service Companies working with
KOC land Drilling & work-over Operations.
2.0 Objective
This document defines the Guideline for managing a casing straps on the rig as per
KPC recommendation on Major Accident at Well# BH194, dated 30th June 2022.
3.0 Definitions
3.1 Definitions
KOC Rig Supervisor (CoMan): A person who has been authorized by the
respective Controlling Team – TL (Team Leader) to supervise the work at the rig site/
worksite. The KOC Rig Supervisor is a person nominated by the Company (KOC) /
controlling team responsible for the designated rig.
Controlling Team: A Team, which schedules, plans and coordinates the work at the
rig sites as per Drilling/ Workover program. It must ensure all personnel under its
jurisdiction are adequately trained and competent to perform their duties.
Casing Strap: Elastic / webbing round straps used to secure the casing during
transportation. This strap is not design for lifting the load, but only securing the
casing during transportation.
Control Tier#4 Uncontrolled Copy if printed Revision date: 28th May 2023
Procedure for Managing Casing / Tubing straps on the Rig
Page - 4 of 6
Responsible to record that all trucks arrived at rig site with the casing / tubing
to monitor that casing straps if any arrived to the location are not used for
other purposes.
Responsible to ensure that all casing straps arrived to the location are
counted and recorded.
Responsible to record all casing straps that have been destroyed and
disposed.
Responsible to fill the receipt form for any casing / tubing straps arrived at the
rig
Responsible to communicate the concerns raised and provide details of the
Truck and consignment that arrived at rig with casing straps, to Controlling
Team Leader.
5.0 Procedure
Prior to commencing offloading of trucks arrived to the Rig location with casings / tubing
following steps to be followed:
1. Contractor Supervisor or the concern designated person to inspect all trucks and
ensure all casings / tubing arrived to the location have any casing straps.
2. Report to KOC Rig Supervisor immediately in case if casing strap was observed on
casing or tubing bundles.
Control Tier#4 Uncontrolled Copy if printed Revision date: 28th May 2023
Procedure for Managing Casing / Tubing straps on the Rig
Page - 5 of 6
3. KOC Rig Supervisor will verify the finding by physically checking the trucks and count
how many casing straps arrived to location.
4. All casing straps arrived to the location will be removed from casing / tubing bundle
and destroyed. Pictures of the casing/ tubing straps will be taken before cutting.
5. Rig Welder will be cutting casing straps at the welding workshop under direct
supervision of KOC Rig Supervisor
6. KOC Rig Supervisor will complete the form in Annexure 1 for receipt of’ Casing/
Tubing straps at the rig’ developed for control of casing / tubing / bundle straps in two
copies, as a record– Annexure 1.
7. KOC Rig Supervisor is responsible to pass one copy of the receipt form to truck
driver.
8. Second copy of the receipt will be scanned and sent to CT (Controlling Team) Team
Leader or his nominee (SDE / DE) for further follow up with KOC Warehouse
Management.
7.0 Abbreviations
CT Controlling Team
E&D Exploration & Drilling
HSE Health Safety & Environment
TL Team Leader
SDE Senior Drilling Engineer
DE Drilling Engineer
KOC Kuwait Oil Company
28th May 2023 The draft document was circulated for review on 1st May
2023 and final on 27th May 2023. Comments /
suggestion by ‘E&D Rig Operations SIMOPS Working
Group’ were discussed and finalized on 28th May 2023.
Control Tier#4 Uncontrolled Copy if printed Revision date: 28th May 2023
Procedure for Managing Casing / Tubing straps on the Rig
Page - 6 of 6
Annexure 1