COT COT 000 045 9373 ApplicationForm

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

For Office Use :

APPLICATION FOR ELECTRICITY SUPPLY CA No.:


SR No.:

Please note that only submitted application with complete and correct information will be processed.

PART 1 : TO BE COMPLETED BY APPLICANT

For Application Under Individual Name :


Name of Applicant : SITI NORHASYIMAH ALI SABANA MyKad / Pasport : 881128525088
(Mr/Mrs/Ms) MADAM
("the Consumer")
Date of Birth : 28-Nov-1988
(Below 18 years is not entitled to apply)
Mother's Name :
(For Security Verification)

Next Of Kin : MIKHAIL Next of Kin Phone No : 01112345763


(The person as an alternative to be contacted if we are unable to reach you)

Home/Office No. : Fax No. :

Mobile No. : 01164368962 Email : mssyimah@gmail.com

Communication Options: Letters Email Both

Billing Delivery Options: Byhand Post Email


(Please select one (1))

Details of Premises
a. Address of Premises : A-2-1A, JALAN PJU 10/9A, PRIMA DAMANSARA, 47830 PETALING JAYA, SELANGOR
(where supply is required)

("the Premises")

b. Premises Ownership Owned Rented

c. Premises Type : Residential Use - Residence description : Residence: Medium cost apartment
(This activity will determine the (For example, Two storey terrace)
appropriate tariff)

Non-Residential Use Commercial Manufacturing Agriculture

Mining Streetlight

Main activity at premise:


(For examples: Bakery Shop, Sawmill, etc.)

d. Correspondence Address : A-2-1A, JALAN PJU 10/9A, PRIMA DAMANSARA, 47830 PETALING JAYA, SELANGOR
(If different from premises address above)

e. Supply required date : 27-Nov-2023 (Electricity supply by TNB is subject to consumers’ site readiness)

TYPE OF APPLICATION * Please select ( / )

New Electricity Supply (Permanent) Temporary Electricity Supply

Additional Electricity Supply Estimated Supply End Date :

Change of Tariff (Do not fill section 2)


Others : Change Of Tenancy

APPLICANT'S DECLARATION
1. I / We hereby attest that the contractor appointed by me / us / the housing developer as stated herein is a contractor registered with Energy Commission. I / We also give permission to the contractor
to do all necessary works related to my / our application.
2. I / We hereby attest that the electrical wiring is in a good condition.
3. I understand and agree that as the registered consumer for electricity at the said premise I will be liable for any electricity consumed during the tenancy and/or occupancy period including any loss or
damage suffered by TNB as permitted under the Electricity Supply Act.
4. I agree to ensure the meter, TNB’s installation and/or equipment at the said premises is not tempered at any time during the tenancy or occupancy period except with a written approval from TNB.
5. I / We hereby acknowledge that all information given are true and accurate and TNB shall have the right to take any necessary action if the information given are false or inaccurate.
6. I / We agree to all the Terms and Conditions of Supply as attached herein ("The Terms and Conditions of Supply for Consumer")and it shall become part of a binding
7. I / We as the signatory below do hereby consent to TNB, its agents and / or its permitted assigns for collecting, recording, holding or storing my / our personal data in accordance to Personal Data
Protection Act 2010 for a lawful purpose or necessary for any matters related to electricity supply by TNB.
8. I / We acknowledge that the telephone number / mailing address / e‐mail address provided is true and accurate and TNB will be notified if there is any change in the information. My / our failure to
update the telephone number / mailing address / e‐mail address will not cause the TNB to be liable for any failure to deliver the notices under this Contract.

Note: This is a computer - generated document. No signature is required.

Page1/2
DECLARATION FORM
(OWNER OF THE PREMISES)

To :

Tenaga Nasional Berhad,


Pejabat Setiausaha Syarikat,
Tingkat 2, Ibu Pejabat
Tenaga Nasional Berhad,
No. 129, Jalan Bangsar,
59200 Kuala Lumpur.

*We/I SITI NORHASYIMAH ALI SABANA (*NRIC No./Passport No/Company No : 881128525088) having registered/residential address at A-2-
1A,JALAN PJU 10/9A,PRIMA DAMANSARA,47830,PETALING JAYA,SELANGOR hereby agree and undertake to Tenaga Tenaga Nasional
Berhad (Company Registration Number: 200866-W) a company incorporated in Malaysia under the Companies Act 2016 and having its registered
office at Pejabat Setiausaha Syarikat, Tingkat 2, Ibu Pejabat Tenaga Nasional Berhad, No. 129, Jalan Bangsar, 59200 Kuala Lumpur, Malaysia
(hereinafter referred to as “TNB”), as follows—
1. *We/I hereby declare and admit that I am the Registered Owner of the premises which is located at A-2-1A,JALAN PJU 10/9A,PRIMA
DAMANSARA,47830,PETALING JAYA,SELANGOR (hereinafter referred to as “Premises”) and the previous owner and/or TNB registered
consumer has vacated the Premises.

2. *We/I hereby agree and undertake as follows—

a) if the declaration stated in Clause 1 above is found to be incorrect by TNB and/or it is disputed by any party(ies) or *We/I no longer
own such Premises, then TNB will terminate the electricity supply contract by giving not less than 24 hours written notice to the
Premises and electricity supply to the Premises will be disconnected without any further notice;

b) will not demand from TNB any loss incurred as a result of the disconnection of electricity supply by TNB in Clause2 (a) above;

c) to indemnify and/or hold harmless TNB of all cost, damages and losses which TNB may suffer or incur against any claim from any third
party arising out of the disconnection and termination of electricity supply by TNB;

d) will bear any loss and/or expense including the costs and legal fees of TNB in enforcing this declaration in court; and

e) this declaration has been voluntarily signed without any element of coercion, intimidation or encouragement from any party and I fully
aware and understand the implications of this declaration.
3. The clauses in this declaration are separate and distinct from one another and at any time if any or more of these clauses become invalid in
law, then such invalidity will not have any effect to the other clauses.

4. This declaration binds the respective heirs, executors, administrator, successor-in-the-title and representatives appointed by *us/me.

5. *We/I do acknowledge that the information provided is true and up to date whereby any false statement will amounting to an offence and may
cause *us/me to be prosecuted and liable to civil claim in court.

6. *We/I give my consent to TNB to process *our/my personal data (including disclosing *our/my personal data to any third party appointed by
TNB) according to the Personal Data Protection Act 2010 for the purpose of this declaration form and other matters connected therewith.

Note: This is a computer - generated document. No signature is required.

Page2/2
THE TERMS AND CONDITIONS OF SUPPLY FOR CONSUMER
20. MAXIMUM DEMAND
Means for any month, the electrical power taken by the Consumer measured to be
DEFINITIONS twice the largest number of kilowatt-hours (kWh) supplied during any consecutive thirty
(30) minutes in that month.
1. ACT
The Electricity Supply Act 1990 (Act 447) and/or any regulations made hereunder 21. MEDIUM VOLTAGE
and/or any amendment, revision, modification or enactment made thereto or thereof A voltage normally exceeding Low Voltage but equals to or not exceeding 50,000 volts.
from time to time.

2. ACTUAL MAXIMUM DEMAND 22. MONTHLY MINIMUM CHARGE (MMC)


Means the maximum demand as registered by the kilowatt meters installed at the A monthly charge applicable to Consumer in the event his monthly total electricity bill
consumer’s premises on which basis the Consumer shall be billed monthly for the (kW and/or kWh) is less than the stated amount stipulated in the prevailing Tariff as
capacity of electrical power utilized. approved by the government.

3. APPLICATION FORM 23. PROJECT MINIMUM MONTHLY CHARGE (PMMC)


Application Form means a form for electricity supply application either in a physical A monthly charge equivalent to 2% of the net capital cost of the supply project. The
printout version or in a digital version via online application, whichever applicable PMMC is chargeable only during the first 5 years from the date of supply, after which
MMC shall be applied. Subject to the amount of electricity consumed, a Consumer will
4. BUSINESS/NON-DOMESTIC CONSUMER be charged the higher of PMMC or the consumption based on the applicable tariff as
Any Consumer who applies for electricity for purposes other than for private dwelling approved by EC or any relevant authority
(Private dwellings are domestic premises, which are not used as hotels, boarding
houses or for the purpose of carrying out any businesses, trades, profession or 24. REGISTERED ELECTRICAL CONTRACTOR
service). A person who holds a Certificate of Registration as an Electrical Contractor issued
under the Electricity Regulations 1994.
5. CHANGE OF TENANCY
The process of changing the current registered consumer to a new registered 25. SUPPLY AUTHORITY
consumer who shall be liable for the existing electricity account of a premises. Any statutory authority established by an Act of Parliament or any other law to generate
and/or supply electricity.
6. CONNECTION CHARGE
An upfront contribution amount payable by a Consumer requiring infrastructure for new 26. TARIFF
supply and/or upgrading of existing infrastructure for additional supply requirement as The rates to be charged to the Consumer for the consumption of electricity as referred
approved by Energy Commission as provided under the Act. under the tariff column of the Application Form, as provided by the Act.

7. CONSUMER 27. TNB


A person who is supplied with electricity or whose premises are for the time being Tenaga Nasional Berhad (200866-W), a company incorporated in Malaysia under the
connected for the purpose of supply of electricity by the Supply Authority or a Licensee. Companies Act 1965 and with its registered address at Pejabat Setiausaha Syarikat,
Tingkat 2, Ibu Pejabat Tenaga Nasional Berhad, No. 129 Jalan Bangsar, 59200 Kuala
8. CONTRACT Lumpur and having branches in Peninsular Malaysia.
The Contract of Electricity Supply comprising of terms and conditions and the supply
application form.
A. CONSUMER’S COVENANTS
9. CONNECTED LOAD CHARGE (CLC)
The additional charge for each kilowatt payable by the Consumer on a monthly basis 1. TO TAKE SUPPLY
when the actual Maximum Demand recorded is less than 75% of the Declared To take supply at the premises according to the Tariff rates pursuant to the provision
Maximum Demand. of the Act.

10. DECLARED MAXIMUM DEMAND 2. CONNECTION CHARGE


Means the Consumer’s declared electrical power requirement which shall be in kilo- To pay to TNB a Connection Charge in full (if any) and such payment to be paid before
watt (kW) or mega-watt (MW) as contracted with TNB. any work is commenced by TNB, as provided in the Act.

11. DOMESTIC CONSUMER 3. DEPOSIT


A Consumer occupying a private dwelling premises, which is not used as a hotel, To pay the required deposit to cover the estimated charges for two (2) months supply
boarding house or used for the purpose of carrying out any form of business, trade, of electricity before the supply is connected, provided that TNB shall from time to time
professional activities or services. have the right to revise the amount of deposit required depending on the amount of
charges for consumption of electricity. Payment of deposit can be made in the form of
12. ENERGY COMMISSION cash, cheque, bank draft, cashier’s order or bank guarantee.
The Energy Commission established under the Energy Commission Act 2001.
Provided that, except for deposit paid in the form of bank guarantee, TNB shall pay to
13. EXTRA HIGH VOLTAGE the Consumer subject to such conditions and at such rates may be prescribed a sum
A voltage normally exceeding 230,000 volts. equivalent to the annual interest on the deposit pursuant to the Act.

14. EXTRA LOW VOLTAGE 4. UPKEEP AND MAINTENANCE OF TNB’S INSTALLATION AND EQUIPMENT
A voltage normally not exceeding 50 volts alternating current or 120 volts direct current, The Consumer agrees: -
whether between conductors or between conductor and earth. a) to take steps to ensure no damage or tampering is caused to the said installation
and equipment;
15. HIGH VOLTAGE b) to allow TNB to maintain any electrical installation and equipment within the
A voltage normally exceeding 50,000 volts but equals to or not exceeding 230,000 Consumer’s premises at any time for safety purposes.
volts. If there is any defect or abnormality on the installation, TNB shall have the right to make
good the defects without being liable for any damages provided always it is not due
16. LAWS to the negligence or wilful acts of TNB, its employees or agents.
Any provisions of the Act, principle of law as decided by the court or court order which
affects any issues relating to the supply of electricity to the Consumer. 5. TERMINATION BY THE CONSUMER
Subject to clause 26, to give TNB notice in writing and shall be served by: -
17. LICENSEE a) hand delivery; or
A person licensed under section 9 of the Act. b) registered post; or
c) regular post; or
18. LIQUIDATED DAMAGES d) electronic as determined by TNB.
A sum of money chargeable to the Consumer who fails or cease to take supply for the
period of 5 years. Termination of Contract shall be effective three (3) working days after TNB received
the termination notice. The Consumer shall provide access for TNB to perform the
19. LOW VOLTAGE supply disconnection and if the Consumer fails to do so, the termination shall not come
A voltage normally exceeding extra low voltage but not exceeding 1,000 volts into effect and Consumer must pay all charges related to the electricity consumption
alternating current or 1,500 volts direct current between conductors, or 600 volts at the premises until the actual disconnection of supply and termination of the contract
alternating current or 900 volts direct current between conductor and earth. can be performed.

1
6. VACATED PREMISES 17. TEMPORARY DISCONNECTION OF SUPPLY
If the Consumer vacates the premises without giving any notice to TNB as provided TNB may temporarily disconnect the supply to the Consumer’s premises for any
under Clause 5, the Consumer shall be liable to pay all charges of electricity purposes in connection with TNB’s efficient electricity supply system by giving an early
consumption and any charges payable relating to the electricity supply until the notice. TNB shall not be liable to provide any alternative supply after the disconnection.
installation is disconnected or until another consumer applied for electricity supply and
entered into a new contract of supply. 18. CHANGE OF TENANCY
TNB shall have the right not to provide electricity supply at any other premises to the In the event the Consumer’s premises which supply is being given under this Contract
Consumer who vacated the premises until the Consumer has made full payment of the is tenanted, TNB shall inform the Consumer that they have the option for the tenant to
outstanding balance. apply for Change of Tenancy for the account.

7. TENANTED PREMISES 19. THE CONSUMER STATUS


In the event the premises is tenanted, the Consumer/owner of the premises agrees: - TNB has the obligation to provide electricity supply to the legal owner or occupier of
a) to inform tenant to apply for electricity to be registered under the tenant’s name by any premises as provided by the Law.
way of Change of Tenancy upon occupancy to TNB;
b) to inform TNB of any change of tenancy and the Consumer has the option for the
tenant to apply for Change of Tenancy for the account; C. IT IS HEREBY AGREED BY BOTH PARTIES
c) the Consumer to take full responsibility to pay all the bills registered under the
Consumer’s name; 20. RISER AND LATERAL MAINS
(a) For single individual premises, any installation comprising mains and service
8. RESPONSIBILITY TO MAKE GOOD ALL DAMAGE lines and other ancillary equipment up to and including the meter will be the
The Consumer shall pay for all damages which are intentionally caused on TNB’s property of TNB;
installation within the Consumer’s premises or due to negligence on the Consumer’s (b) For multi tenanted premises where part of the supply is intended for including
part or any persons under his control. but not limited to the owner, developer, management or landlord, and the rest for
the tenants in the building, the landlord’s supply and each of the tenant’s supplies
9. NO INTERFERENCE OF ELECTRICITY SUPPLY TO OTHER CONSUMERS will be separately metered and billed by TNB. The owner, developer,
To use electricity supply so as not to interfere with the supply of electricity to any other management, landlord or their respective agents shall provide, own, maintain
consumers. and repair at his own expense the electrical systems in the buildings including
adequate and necessary rising and lateral mains. The design, installation and
10. NO OBSTRUCTION TO TNB’S INSTALLATION operating of such electrical systems shall comply with requirements set by the
a) The Consumer shall not create any obstruction and/or undertake any activity in the relevant authorities including the Statutory Authority and TNB as provided by the
vicinity of any TNB’s electrical installation and/or place any equipment which may Act.
endanger life or properties and/or to make any electrical wiring and/or installation
to any existing wiring and installation at any premises without any written permission 21. BILLING AND PAYMENT
from the Energy Commission and/or TNB. (a) All bills including but not limited to any other applicable charges in respect of any
b) (i) TNB has the right to take any reasonable action to remove any obstruction amounts payable to TNB shall be rendered to the Consumer monthly and shall be
created by the Consumer or representative under Consumer’s paid by the Consumer within thirty days of its presentation.
supervision/control. (b) Notwithstanding anything hereinbefore mentioned, TNB shall have the right to
(ii) TNB shall not be liable to pay any compensation for any losses and/or damages impose Minimum Monthly Charge in the event the monthly total electricity bill is
to the Consumer due to the said removal. less than the stipulated amount in the Tariff Book.
(c) TNB shall have the right to impose surcharge of one percent (1%) on the
11. RENEWABLE ENERGY INSTALLATIONS outstanding amount calculated until the date of full payment.
All renewable energy installations shall be subjected to the guideline as approved by (d) The Consumer shall be liable for electricity bills issued by TNB including any
Energy Commission. unpaid amount insofar as the account is registered under the Consumer’s name
regardless of any consumption of electricity by any third party.
12. ACCESS (e) The Consumer shall be responsible to repay the amount in the bills rendered by
The Consumer consents with TNB that the authorised employees, servants, agents TNB including any other relevant charges for any invalid payment made by the
and/or representatives of TNB shall be permitted to have access to the premises of the Consumer such as false credit card, bounced cheque and any other invalid
Consumer at reasonable time, manner and circumstances: - payment.
(a) To carry out their duties/ inspection and/or test and/or construction and/or other (f) In the event the Consumer fails to make payments of any amount pursuant to
things relevant to the supply and disconnection to the Consumer’s premises. Clause 21(a), (b) and (c), TNB shall have the right to disconnect electricity supply
(b) For entry pursuant to Clause 12(a) TNB shall make good any damage, if any, as at the Consumer’s premises.
a result of such entry. (g) The Consumer shall be liable to pay for any unpaid amount of electricity bill and/or
loss of revenue and/or expenses incurred by TNB by reason of dishonest
13. APPLICANT DECLARATION consumption of electricity supply in accordance with the provisions of the Act.
The Consumer shall abide at all times to the Applicant Declaration as stipulated in the (h) TNB shall have the right to make adjustment and to update the Consumer’s
Application Form. account in accordance with the Law.

22. REMOVAL OF TNB INSTALLATION


B. TNB’S COVENANTS If the Consumer or the proprietor of the premises requests TNB to remove or relocate
the supply line, pole, sub-station, pylon or any other TNB’s installation or equipment
14. LOCATION OF TNB’S INSTALLATION within or outside the Consumer’s premises, subject to consent by TNB if the
TNB shall determine the position and end-connection of entry route of the service lines transmission/distribution system is not disrupted, all costs of executing the removal or
or cable(s) including cut-out fuses, meter(s), and others to the Consumer's premises. relocation shall be fully borne by the Consumer or the proprietor as the case may be.
In the event that the Consumer wishes to remove the said installation, authorization of
TNB must be obtained and the costs of the removal shall be fully borne by the 23. EVENT OF DEFAULT
Consumer. Any removal made without written authorization shall entitle TNB to The occurrence of any of the following shall constitute an event of default under this
disconnect the supply without any notice. Contract and it is not limited to:
(a) Act or default of the Consumer affecting the efficiency and/or safety of TNB’s
15. USAGE OF INSTALLATION FOR OTHER CONSUMER installation.
TNB may use its part of the installation to supply electricity to other consumers in the (b) The Consumer has failed to comply and/or breach with any provision of this
area. Contract and/or the Act and/or commit any offence under the Act.
(c) The Consumer has obtained consent for the appointment of or the taking of
16. INSPECTION BY TNB possession by a receiver or liquidator of itself or of all or a substantial part of its
(a) TNB may need to inspect and test all installations before connection of supply. property.
However, it is the responsibility of the Registered Electrical Contractor to ensure (d) The Consumer acknowledges in writing its inability to pay its debt as such debts
that the installations are safe. become due.
(b) The Consumer shall inform TNB of any proposed extensions or alterations to the (e) The Consumer makes a general assignment or an arrangement or composition
installations so that TNB may conduct inspection and test of the extension or with or for the benefit of its creditor.
alteration if TNB so desires. (f) Instituting a case voluntarily or filing a petition against any party seeking to take
(c) TNB does not accept any responsibility for any loss or damage caused by or advantage of any law relating to bankruptcy, insolvency, restructuring of its debts,
occurs during or after test due to any defect in the installation and any test carried winding up or composition.
out by TNB is for TNB's purposes only and does not imply any warranty that the (g) The Consumer is under receivership or under special administration or liquidation.
installation is suitable for the Consumer's purposes or that it fully complies with the (h) The Consumer is declared a bankrupt by the Court.
Act or any subsequent amendments made there under. (i) Upon the Consumer dissolution or death.
(j) Failure to pay the amount as stipulated under Clause 21 above.
(k) Consumption of electricity in any dishonest manner.
2
(l) The Consumer fails to comply with any of the provisions stipulated under Clause For the purpose of this clause:
13 of this Contract.
“Service Tax” means the Service Tax applicable to the Contract pursuant to the Service
On such effective date of termination hereof, TNB shall be discharged from any Tax Act;
obligations and liabilities under this Contract.
“Service Tax Act” means the Service Tax Act 2018 of Malaysia and includes its rules,
24. DISCONNECTION OF SUPPLY regulations or guideline issued by the relevant authorities in charge of such tax.
TNB may disconnect the supply to the Consumer by giving no less than seven (7)
working days prior notice in any situation mentioned below: - (b) Other Taxes & Levies
(a) Any default by the Consumer under Clause 23 and such default are not remedied Except as provided for otherwise, the Consumer shall be responsible for all present
within the stipulated period if any; and future taxes, duties, levies, and other similar charges including any related interest
(b) Any right to disconnect the supply as provided under the Act. and penalties, howsoever designated (hereinafter referred to as ‘Other Taxes’), arising
out or in connection with the supply of any kind imposed by law.
25. TERMINATION OF CONTRACT BY TNB
(a) TNB may terminate this Contract on reasonable grounds taking into account of the 32. GOVERNING LAW
circumstances accordingly, or for reasons permitted by the Law and this Contract This Contract will be governed by and construed in accordance with the Act and any
upon giving not less than fourteen (14) working days’ notice in writing of its regulations made there under including any amendment thereto as well as any other
intention to do so. relevant written laws.
(b) TNB may terminate this Contract under Clause 23 by giving fourteen (14) working
days’ notice from the date of expiry of the remedy period (if applicable) 33. AMENDMENT, MODIFICATION OR REPLACEMENT
(c) If the Consumer renders to TNB a notice of disconnection of supply thereby it shall No amendment or other variation to this Contract is binding unless the same is duly
be deemed as a notice of termination of the Contract subject to the issuance of affected by an instrument in writing signed by the parties and expressed to be for the
notice under Clause 25(a). purpose of such amendments.
(d) If TNB discovers that the information given is false and/or is disputed with the
existence of prima facie proof relating to the supply and proven by any applicable 34. ASSIGNMENT
laws, TNB shall have the right to terminate this Contract upon giving a written The Consumer shall not assign any of the rights or obligations arising under this
notice of not less than 48 hours. Contract to any third party without the prior consent in writing of TNB.

26. NOTICES 35. WAIVER


Unless and otherwise provided under the Act and any clause stated under this Knowledge or acquiescence by TNB of or in breach of any of the conditions or
Contract, any notice, demand or other communication which is required or allowed to covenants herein contained shall not operate as or be deemed to be waiver of such
be given or made under this Contract shall be in writing and shall be served by hand conditions or covenants or any of them and notwithstanding such acknowledge or
delivery or by way of prepaid registered post or ordinary post or electronically, as opted acquiescence, TNB shall be entitled to exercise its rights under this Contract.
by the Consumer, to the address stated in this Contract. Proof of posting or service of
any notice, demand or communication shall be deemed to be duly served: 36. TIME PERIOD
i) if service is delivered by hand, at the time of such delivery and duly Time wherever mentioned shall be the essence of this Contract.
acknowledged;
ii) if service is by way of post, on the third (3rd) Working Day after posting thereof. 37. SUCCESSORS-IN-TITLE
iii) if service is by way of electronic means, at the time of delivery to the recipient; This Contract shall be binding upon the successors-in-title and permitted assigns of
or the respective Parties hereto.
iv) if service is by way of post and electronic means, on the third (3rd) Working Day
after posting thereof. 38. STAMP DUTY
The stamp duty in respect of this Contract shall be borne and fully paid by the
27. SERVICES OF LEGAL PROCESS Consumer.
The service of any legal process shall be by way of prepaid registered post sent to the
address as stated in this Contract. Proof of posting will be regarded as proof of 39. SEVERABILITY
acceptance and the said service shall be deemed to have been duly served and duly If any one or more of the provisions or part thereof contained in this Contract should
received upon the expiry of five (5) days from the date of posting. be or become invalid or unenforceable due to whatsoever reasons this shall not in any
way affect or impair the validity or enforceability of the remaining provision hereof.
28. FORCE MAJEURE
TNB shall not be liable to the Consumer for any breach of terms and conditions of this 40. INSTALLATION OF EQUIPMENT TO GENERATE ELECTRICITY
Contract due to any of this event which shall include but not limited to national The Consumer shall inform TNB on any equipment installed at his premise for the
emergency, war, hostilities, riot, civil commotion, earthquake, flood, disposition or by purpose of generating electricity.
compliance with any order of government, local government or any other authorities.
41. POWER QUALITY
29. INDEMNITY AND NO LIABILITY CLAIM The Consumer shall ensure all its electrical installations have sufficient immunity
a) The Consumer agrees to indemnify and keep indemnified (indemnifying) TNB from against short duration voltage events (sags & swells) and transient events, and shall
and against all and/or any claims, actions, compensations, suits, proceedings, not generate other significant power quality voltage signatures that might have
demands and all legal costs incurred thereby, brought against TNB, its servants detrimental effects to the electrical supply systems. The related power quality technical
or agents by a third party to which TNB may be or become liable in respect of or standards are defined in TNB Electricity Supply Application Handbook (ESAH).
arising from the performance of this Contract provided always it is not due to the
negligence or willful acts of TNB, its employees or agents. 42. POWER FACTOR
b) The Consumer hereby agrees that neither TNB nor its employees, servants, The Consumer shall at any time use its best endeavor to obtain the highest power
agents, representatives shall be liable and/or make good the Consumer in respect factor possible close to the value of 1.0 in all the operation of the Consumer’s electrical
of any damage, injury or loss to any of the Consumer’s property and/or life unless installations. A power factor charge shall be imposed on the Consumer based on the
such damage, injury or loss have been proven as a result of any willful act, current rates approved as provided by the Act if the power factor in any month falls
negligence, omission and/or failure to comply with any safety measures as short of the minimum power factor set under the existing TNB policy. Consumers
provided under any written law. under domestic tariff and streetlight tariff are exempted from the power factor charge.
c) The Consumer hereby agrees further that TNB shall not be liable for any cost
incurred, loss and/or damage of industrial goods, product, property or life of the 43. WELDING SET
Consumer as a result of any unavoidable accident, voltage fluctuation, In addition to the applicable tariff rate, Low Voltage, Medium Voltage, High Voltage and
interruption, reduction and/or cessation of the electricity supply, fire or accident Extra High Voltage Consumers who install transformer-operated electric welding set
that may occur in consequence of the supply or the use or misuse which is not equipment will be imposed a charge. Motor-operated welding sets are exempted from
due to the negligence or willful act of TNB and/or its employees. the said charge.

30. PERMISSION FROM LANDLORD 44. CONFIDENTIALITY


If required, the Consumer may assist TNB in getting the permission from the landlord Except as it is or becomes a part of the public domain, all information provided by either
for the connection of electricity supply to the Consumer’s premises. Party under this Contract shall be confidential at all times unless specified otherwise
in writing.

D. MISCELLANEOUS 45. PERSONAL DATA


(a) TNB will comply with the provisions of the Personal Data Protection Act 2010
31. TAXES ("APDP 2010") while processing the Consumer’s personal data under this
(a) Service Tax contract;
The Consumer shall bear and pay its own Service Tax on the services as may be levied (b) TNB may disclose Consumer's personal data to lawyers, debt collection agencies
by the government from time to time. and any third parties appointed by TNB as agents, contractors, service providers
3
and/or professional advisors for any purpose related to the supply of electricity to
the Consumer;
(c) Consumer may make any inquiries, complaints or applications for access or
correction to his/her personal data relating to the electricity supply to TNB;
(d) Consumer hereby agrees that his/her personal data may be transferred outside
Malaysia for a lawful purpose or necessary for and directly related to the activities
of supplying electricity by TNB. In the event of no consent is given by the
Consumer, the personal data may be transferred to a country that have personal
data protection law at least equivalent to the level of protection afforded by PDPA
2010 or for the exercise of any functions conferred on any person by any law; and
(e) TNB Personal Data Protection Policy can be accessed by the Consumer at
https://www.tnb.com.my/pdpa.

E. THE FOLLOWING ADDITIONAL CLAUSES ARE APPLICABLE FOR


BUSINESS/NON-DOMESTIC CONSUMER/LARGE POWER CONSUMER (LPC)

46. MAXIMUM DEMAND


Consumers who are taking supply at Medium Voltage, High Voltage or Extra High
Voltage shall have an obligation to ensure that the Actual Maximum Demand shall not
exceed Declared Maximum Demand;
(i) In the event the Actual Maximum Demand at any time during the prescribed period
exceeds the Declared Maximum Demand, the Actual Maximum Demand shall be
the new Declared Maximum Demand for the billing purpose shall become
effective from the next billing period.
(ii) Notwithstanding the foregoing, in the event the Actual Maximum Demand
exceeds the Declared Maximum Demand and such excess impacts or affects the
safety, security and efficiency of the TNB System, TNB shall in its absolute
discretion reduce the Maximum Demand to the Declared Maximum Demand.

47. CONNECTED LOAD CHARGE (CLC)


The Consumer shall be required to pay a Connected Load Charge (if any) when taking
supply at Medium Voltage, High Voltage or Extra High Voltage based on the prevailing
Tariff and Connection Charges policy.

48. LIQUIDATED DAMAGES


In the event the Consumer fails or ceases to take supply for the period of five (5) years
after supply been given, the Consumer shall pay to TNB Liquidated Damages.
Provided always that the amount and payment of Liquidated Damages shall be
subjected to the prevailing Tariff and Connection Charges policy.

4
TERMA DAN SYARAT-SYARAT BEKALAN BAGI PENGGUNA 17. PERTUKARAN PENGHUNI
Proses pertukaran nama pengguna berdaftar asal kepada pengguna berdaftar baru
yang akan bertanggungan terhadap akaun elektrik sedia ada bagi suatu premis.
DEFINISI
18. PIHAK BERKUASA BEKALAN
1. AKTA Mana-mana pihak berkuasa berkanun yang ditubuhkan oleh Akta Parlimen atau mana-
Akta Bekalan Elektrik 1990 (Akta 447) dan/atau mana-mana peraturan yang dibuat di mana undang-undang lain untuk menjanakuasakan dan/atau rnembekalkan elektrik
bawah ini dan/atau mana-mana pindaan, penyemakan, pengubahsuaian atau enakmen
yang dibuat kepadanya atau apa-apa dari semasa ke semasa. 19. SURUHANJAYA TENAGA
Suruhanjaya Tenaga yang ditubuhkan di bawah Akta Suruhanjaya Tenaga 2001.
2. BORANG PERMOHONAN
Borang permohonan bermaksud borang bagi tujuan permohonan bekalan elektrik sama 20. TARIF
ada dalam bentuk fizikal bercetak atau dalam bentuk digital bagi permohonan secara Kadar yang akan dikenakan kepada Pengguna bagi penggunaan elektrik seperti yang
atas talian, yang mana berkenaan. dirujuk pada ruangan tarif Borang Permohonan sebagaimana diluluskan di bawah Akta.

3. CAJ MINIMUM BULANAN (CMB) 21. TNB


Caj minimum bulanan yang dikenakan ke atas Pengguna di mana bil bulanan elektrik Tenaga Nasional Berhad (200866-W) adalah sebuah syarikat yang ditubuhkan di
(kW dan/atau kWj) adalah kurang daripada jumlah yang ditetapkan berdasarkan Tarif Malaysia di bawah Akta Syarikat 1965 dengan alamat berdaftar di Pejabat Setiausaha
yang terpakai seperti diluluskan oleh kerajaan. Syarikat, Tingkat 2, Ibu Pejabat Tenaga Nasional Berhad, No. 129 Jalan Bangsar,
59200 Kuala Lumpur dan mempunyai cawangan-cawangan di Semenanjung Malaysia.
4. CAJ MINIMUM BULANAN PROJEK (CMBP)
Caj bulanan bersamaan 2% dari kos modal bersih projek bekalan. CMBP dikenakan 22. UNDANG-UNDANG
dalam tempoh lima (5) tahun pertama dari tarikh pembekalan, selepas itu Caj Minimum Mana-mana peruntukan undang-undang di bawah Akta, prinsip undang-undang yang
Bulanan (CMB) akan digunakan. Tertakluk kepada jumlah elektrik yang digunakan, diputuskan oleh mahkamah atau perintah mahkamah yang memberi kesan kepada
Pengguna akan dikenakan jumlah yang lebih tinggi antara CMBP atau penggunaan, sebarang isu berkaitan pemberian bekalan elektrik kepada Pengguna.
berdasarkan tarif yang digunapakai seperti diluluskan oleh Suruhanjaya Tenaga atau
pihak berkuasa yang berkenaan. 23. VOLTAN AMAT RENDAH
Voltan yang biasanya tidak melebihi 50 volt arus ulang alik atau 120 volt arus terus,
5. CAJ SAMBUNGAN sama ada antara konduktor ataupun antara konduktor dengan bumi.
Bayaran awal yang perlu dibayar oleh Pengguna yang memerlukan infrastruktur untuk
bekalan elektrik baru dan/atau untuk menaiktaraf infrastruktur sedia ada bagi 24. VOLTAN AMAT TINGGI
mendapatkan bekalan elektrik tambahan seperti yang diluluskan oleh Suruhanjaya Voltan yang biasanya melebihi 230,000 volt.
Tenaga selaras dengan peruntukan Akta.
25. VOLTAN RENDAH
6. CAJ SAMBUNGAN BEBAN (CSB) Voltan yang biasanya melebihi Voltan Amat Rendah tetapi tidak melebihi 1,000 volt arus
Caj tambahan bagi setiap kilowat yang perlu dibayar oleh Pengguna secara bulanan ulang alik atau 1,500 volt arus terus di antara konduktor, atau 600 volt arus ulang alik
apabila Kehendak Maksimum sebenar yang direkodkan adalah kurang daripada 75% atau 900 volt arus terus antara konduktor dengan bumi.
dari Kehendak Maksimum yang diisytiharkan.
26. VOLTAN SEDERHANA
7. GANTI RUGI BERES Voltan yang biasanya melebihi Voltan Rendah tetapi bersamaan dengan atau tidak
Sejumlah wang yang dikenakan kepada Pengguna yang gagal atau berhenti untuk melebihi 50,000 volt.
mengambil bekalan bagi tempoh lima (5) tahun.
27. VOLTAN TINGGI
8. KEHENDAK MAKSIMUM Voltan yang biasanya melebihi 50,000 volt tetapi bersamaan dengan atau tidak melebihi
Bermaksud untuk mana-mana bulan, kuasa elektrik yang diambil oleh Pengguna diukur 230,000 volt.
dua kali ganda jumlah terbesar kilowatt-jam (kWj) yang dibekalkan dalam mana-mana
tiga puluh (30) minit berturut-turut dalam bulan tersebut.
A. TANGGUNGJAWAB PENGGUNA
9. KEHENDAK MAKSIMUM DIISYTIHARKAN
Bermaksud keperluan kuasa elektrik yang disytiharkan oleh Pengguna dalam kilo-watt 1. MENGAMBIL BEKALAN
(kW) atau mega-watt (MW) seperti yang dikontrakkan dengan TNB. Mengambil bekalan elektrik dipremis tersebut mengikut kadar Tarif menurut peruntukan
Akta.
10. KEHENDAK MAKSIMUM SEBENAR
Bermaksud Kehendak Maksimum seperti yang direkodkan oleh meter kilowatt yang 2. CAJ SAMBUNGAN
dipasang di premis Pengguna di mana Pengguna akan dibilkan secara bulanan untuk Membayar penuh kepada TNB bayaran Caj Sambungan (jika ada) sebelum sebarang
kapasiti kuasa elektrik digunakan. kerja dimulakan oleh TNB, menurut peruntukan di bawah Akta.

11. KONTRAK 3. WANG CAGARAN


Kontrak Bekalan Elektrik yang merangkumi terma dan syarat-syarat serta borang Membayar wang cagaran yang diperlukan bagi menampung caj yang dianggarkan
permohonan bekalan. untuk dua (2) bulan bekalan elektrik sebelum bekalan disambungkan, dengan syarat
bahawa TNB dari masa ke semasa mempunyai hak untuk mengkaji semula jumlah
12. KONTRAKTOR ELEKTRIK BERDAFTAR wang cagaran yang diperlukan berdasarkan kepada jumlah penggunaan elektrik.
Orang yang memegang Perakuan Pendaftaran sebagai Kontraktor Elektrik yang Pembayaran wang cagaran boleh dibuat dalam bentuk tunai, cek, draf bank, perintah
dikeluarkan di bawah Peraturan-Peraturan Elektrik 1994. juruwang atau jaminan bank.
Dengan syarat bahawa, kecuali wang cagaran dalam bentuk jaminan bank, TNB
13. PEMEGANG LESEN hendaklah membayar kepada Pengguna tertakluk kepada apa-apa syarat dan kadar
Orang yang dilesenkan di bawah seksyen 9 Akta. sebagaimana yang ditetapkan sejumlah wang yang bersamaan dengan faedah tahunan
ke atas wang cagaran menurut Akta.
14. PENGGUNA
Orang yang dibekalkan dengan elektrik atau yang premisnya pada masa ini 4. PENJAGAAN DAN PENYELENGGARAAN PEPASANGAN TNB
disambungkan bagi maksud pembekalan elektrik oleh Pihak Berkuasa Bekalan atau Pengguna bersetuju: -
Pemegang Lesen. a) untuk menjaga pepasangan TNB dan mengambil langkah bagi memastikan
bahawa tiada kerosakan atau menyebabkan berlaku usikan ke atas pepasangan
15. PENGGUNA BUKAN KEDIAMAN tersebut;
Mana-mana Pengguna yang memohon bekalan elektrik bagi tujuan selain dari rumah b) untuk membenarkan TNB menyelenggara mana-mana pepasangan dan
persendirian (Rumah persendirian adalah premis domestik yang mana tidak digunakan peralatan elektrik di premis Pengguna pada bila-bila masa untuk tujuan
sebagai hotel, rumah asrama atau digunakan bagi tujuan menjalani sebarang bisnes, keselamatan.
perniagaan, pekerjaan khas atau perkhidmatan). Sekiranya terdapat sebarang kecacatan atau kejanggalan pada pepasangan, TNB
berhak untuk membaik pulih dan menghapuskan kecacatan kecacatan tanpa
16. PENGGUNA KEDIAMAN bertanggungan terhadap sebarang kerosakan selagi ianya bukan disebabkan oleh
Pengguna yang menduduki premis kediaman persendirian yang tidak digunakan kecuaian atau tindakan yang disengajakan oleh TNB, pekerja-pekerjanya atau agen-
sebagai hotel, rumah penginapan atau untuk sebarang bentuk aktiviti atau agennya.
perkhidmatan perniagaan, perdagangan dan professional.
5. PENAMATAN OLEH PENGGUNA pengalihan yang dibuat tanpa kebenaran bertulis, TNB berhak untuk memotong
Tertakluk kepada klausa 26, memberi notis kepada TNB secara bertulis dan hendaklah bekalan tanpa sebarang notis.
disampaikan melalui: -
a) serahan tangan; atau 15. PENGGUNAAN PEPASANGAN UNTUK PENGGUNA LAIN
b) pos berdaftar;atau TNB boleh menggunakan mana-mana bahagian pepasangan yang disediakan oleh
c) pos biasa; atau pihak TNB untuk memberi bekalan kepada pengguna-pengguna yang lain di kawasan
d) elektronik seperti yang ditentukan oleh TNB. berkenaan.

Penamatan Kontrak akan berkuatkuasa tiga (3) hari bekerja selepas TNB menerima 16. PEMERIKSAAN OLEH TNB
notis penamatan. Pengguna hendaklah memberikan akses kepada TNB untuk (a) TNB boleh menjalankan pemeriksaan dan ujian ke atas semua pepasangan
pemotongan bekalan di premis dan sekiranya Pengguna gagal berbuat demikian, sebelum bekalan disambungkan. Walau bagaimanapun, ia adalah menjadi
penamatan tidak akan berkuatkuasa dan Pengguna hendaklah membayar semua caj tanggungjawab Kontraktor Elektrik Berdaftar untuk memastikan bahawa
yang berkaitan dengan penggunaan tenaga elektrik di premis tersebut sehingga pepasangan adalah selamat.
pemotongan bekalan dan penamatan kontrak yang sebenar dapat dilaksanakan. (b) Pengguna hendaklah memaklumkan TNB sebarang cadangan penyambungan
atau pindaan kepada pepasangan supaya TNB boleh menjalankan kerja-kerja
6. PENGOSONGAN PREMIS pemeriksaan dan ujian terhadap penyambungan atau pindaan sekiranya TNB ingin
Sekiranya Pengguna mengosongkan premis tanpa memberi notis seperti di Klausa 5, berbuat demikian.
Pengguna bertanggungjawab membayar semua caj penggunaan elektrik dan apa-apa (c) TNB tidak bertanggungjawab terhadap sebarang kerugian atau kerosakan yang
caj yang perlu dibayar berkenaan dengan pembekalan elektrik sehingga pepasangan disebabkan atau yang berlaku semasa atau selepas ujian akibat sebarang
itu dipotong atau sehingga seorang pengguna lain memohon bekalan elektrik dan kecacatan pada pepasangan itu dan sebarang ujian yang dijalankan oleh TNB
menandatangani suatu kontrak bekalan yang baru. adalah bagi maksudnya sendiri dan tidak boleh disiratkan ada sebarang waranti
TNB berhak untuk tidak memberi bekalan elektrik kepada Pengguna yang bahawa pepasangan itu sesuai bagi kepentingan Pengguna atau ianya telah
mengosongkan premis tersebut di mana-mana premis lain sehingga Pengguna tersebut mematuhi sepenuhnya Akta atau sebarang pindaan selanjutnya yang dibuat di
membayar penuh amaun yang tertunggak. bawahnya.

7. PREMIS DISEWA 17. PEMBERHENTIAN BEKALAN SEMENTARA


Sekiranya premis disewakan, Pengguna/pemilik premis bersetuju: - TNB boleh memberhentikan bekalan ke premis Pengguna untuk sementara waktu bagi
a) untuk memaklumkan penyewa supaya memohon kepada TNB bekalan elektrik apa-apa tujuan yang berkaitan dengan keberkesanan sistem pembekalan elektrik TNB
untuk didaftarkan di bawah nama penyewa melalui proses Pertukaran Penghuni; dengan memberikan notis lebih awal. TNB tidak bertanggungjawab untuk memberi
b) untuk memaklumkan TNB apa-apa pertukaran penyewa dan Pengguna bekalan alternatif setelah pemotongan berlaku.
mempunyai pilihan untuk penyewa memohon Pertukaran Penghuni bagi akaun
tersebut; 18. PERTUKARAN PENGHUNI
c) Pengguna bertanggungjawab sepenuhnya bagi pembayaran bil yang berdaftar di Sekiranya premis Pengguna yang diberikan bekalan elektrik di bawah Kontrak ini
bawah nama Pengguna; disewakan, TNB perlu memaklumkan kepada Pengguna bahawa Pengguna
mempunyai pilihan untuk penyewa memohon Pertukaran Penghuni bagi akaun
8. TANGGUNGJAWAB UNTUK MEMBAIKI KEROSAKAN tersebut..
Pengguna perlu membayar sebarang kerugian terhadap apa-apa kerosakan yang
disengajakan ke atas pepasangan TNB yang berada di premis Pengguna atau yang 19. STATUS PENGGUNA
diakibatkan oleh kecuaian Pengguna atau mana-mana orang di bawah seliaannya. TNB berkewajipan untuk memberikan bekalan elektrik kepada pemilik atau penduduk
yang sah bagi premis tersebut seperti yang yang diperuntukkan oleh Undang-Undang.
9. TIADA GANGGUAN BEKALAN ELEKTRIK KEPADA PENGGUNA LAIN
Menggunakan bekalan elektrik tanpa mengganggu pembekalan elektrik kepada
pengguna-pengguna lain. C. ADALAH DENGAN INI DIPERSETUJUI OLEH KEDUA PIHAK

10. TIADA HALANGAN KEPADA PEPASANGAN TNB 20. SESALUR MENINGKAT DAN SESALUR SISI
(a) Pengguna tidak akan mewujudkan apa-apa halangan dan/atau menjalankan apa- (a) Bagi premis individu, mana-mana pepasangan sesalur dan talian servis dan alat-
apa aktiviti berhampiran dengan mana-mana pepasangan elektrik TNB dan/atau alat tambahan sehingga dan termasuk meter adalah harta TNB.
menempatkan apa-apa kelengkapan yang mungkin menyebabkan bahaya kepada (b) Bagi premis yang berbagai penghuninya di mana sebahagian dari bekalan adalah
nyawa atau harta benda dan/atau membuat pendawaian dan/atau pemasangan bagi tujuan termasuk tetapi tidak dihadkan kepada pemilik, pemaju, pemunya
elektrik kepada mana-mana pendawaian dan pepasangan sedia ada pada mana- pengurusan atau tuan tanah dan lain-lain penghuni bangunan, bekalan tuan tanah
mana premis tanpa terlebih dahulu mendapat kelulusan bertulis daripada dan bekalan setiap penghuni akan mempunyai meter yang berasingan dan dibilkan
Suruhanjaya Tenaga dan/atau TNB. oleh TNB. Pemilik, pemaju, pemunya pengurusan, tuan tanah atau agen masing-
(b) (i) TNB berhak untuk mengambil tindakan yang munasabah untuk menghapuskan masing wajib atas perbelanjaan sendiri memperuntukkan, memiliki,
halangan yang diwujudkan oleh Pengguna atau wakil yang berada di bawah menyelenggara dan membaikpulih sistem elektrik di dalam bangunan termasuk
seliaan/kawalan pihak Pengguna. sesalur meningkat dan sesalur sisi jika difikirkan patut atau perlu. Rekabentuk,
(ii) TNB tidak akan bertanggungan untuk membayar kos kerugian dan/atau pepasangan dan pengendalian sistem elektrik tersebut harus mematuhi segala
kerosakan kepada Pengguna yang berkaitan dengan tindakan penghapusan peruntukan yang telah ditetapkan oleh badan yang bertanggungjawab termasuk
tersebut. Pihak Berkuasa dan TNB selaras dengan Akta.

11. PEPASANGAN TENAGA BOLEH BAHARU 21. PEMBILAN DAN PEMBAYARAN


Semua pepasangan tenaga boleh baharu akan tertakluk kepada garis panduan yang (a) Segala bil termasuk tetapi tidak terhad kepada apa-apa caj lain berkenaan dengan
diluluskan oleh Suruhanjaya Tenaga. amaun yang kena dibayar kepada TNB akan diberikan kepada pengguna secara
bulanan dan hendaklah dibayar dalam masa tiga puluh hari selepas
12. KEBENARAN LALUAN penyerahannya.
Pengguna bersetuju dengan TNB bahawa pekerja, agen, dan/atau wakil TNB (b) Walau apa pun yang dinyatakan sebelum ini, TNB mempunyai hak untuk untuk
dibenarkan untuk memasuki kawasan premis Pengguna pada masa , cara dan keadaan mengenakan Caj Minimum Bulanan sekiranya jumlah bil elektrik bulanan kurang
yang munasabah:- dari amaun yang ditetapkan dalam Buku Tarif.
(a) untuk menjalankan kerja-kerja/pemeriksaan dan/atau ujian dan/atau pembinaan (c) TNB mempunyai hak untuk mengenakan surcaj sebanyak satu peratus (1%)
dan/atau perkara-perkara lain yang berkaitan dengan pembekalan dan sebulan ke atas apa-apa amaun tertunggak yang dikira sehingga pembayaran
pemotongan ke premis Pengguna. sepenuhnya dibuat.
(b) bagi kemasukan di bawah Klausa 12(a) TNB akan membaikpulih apa-apa (d) Pengguna hendaklah bertanggungjawab ke atas bil-bil elektrik yang dikeluarkan
kerosakan, sekiranya ada, disebabkan oleh tindakan tersebut. oleh TNB termasuk jumlah yang belum dibayar kepada TNB, jika ada, selagi akaun
ini didaftarkan di bawah nama Pengguna tanpa mengira apa-apa penggunaan
13. PERAKUAN PEMOHON tenaga elektrik oleh mana-mana pihak ketiga.
Pengguna hendaklah mematuhi pada bila-bila masa Perakuan Pemohon sepertimana (e) Pengguna hendaklah bertanggungjawab untuk membayar semula amaun dalam bil
yang dinyatakan di dalam Borang Permohonan. yang dihantar oleh TNB termasuk apa-apa caj lain yang berkaitan bagi apa-apa
bayaran yang tidak sah yang dibuat oleh Pengguna seperti kad kredit palsu, cek
tendang dan lain-lain.
B. TANGGUNGJAWAB TNB (f) Sekiranya Pengguna gagal membayar apa- apa amaun di bawah Klausa 21(a), (b)
dan (c) maka TNB berhak memotong bekalan elektrik di premis berkenaan.
14. KEDUDUKAN PEPASANGAN TNB (g) Pengguna hendaklah bertanggungjawab untuk membuat bayaran terhadap
TNB akan menentukan kedudukan dan penamatan-akhir masuk talian-talian sesalur sebarang amaun bil elektrik yang belum dijelaskan dan/atau kehilangan
atau kabel termasuk fius-fius “cut-out”, meter dan lain-lain ke premis Pengguna. pendapatan dan/atau kos yang ditanggung TNB akibat dari penggunaan elektrik
Sekiranya Pengguna hendak mengalihkan pepasangan tersebut, kebenaran TNB mesti yang tidak jujur sebagaimana diperuntukkan di bawah Akta.
diperolehi dan kos pengalihan akan ditanggung sepenuhnya oleh Pengguna. Apa-apa (h) TNB berhak untuk membuat pelarasan dan mengemaskini akaun Pengguna
mengikut Undang-Undang.

2
22. PENGALIHAN PEPASANGAN TNB 28. FORCE MAJEURE
Jika Pengguna atau pemilik sesebuah premis meminta TNB supaya mengalihkan atau TNB tidak bertanggungan kepada Pengguna untuk apa-apa pelanggaran terma dan
memindahkan litar bekalan, tiang, bilik pencawang, pilon atau apa-apa pepasangan syarat-syarat Kontrak ini yang disebabkan oleh apa-apa kejadian yang merangkumi
TNB atau peralatan di dalam atau di luar premis Pengguna, tertakluk kepada tetapi tidak terhad kepada kecemasan nasional, peperangan, permusuhan, rusuhan,
persetujuan oleh TNB sekiranya tidak menjejaskan sistem penghantaran/pengagihan kekecohan awam/gangguan sivil, gempa bumi, banjir, disposisi, atau pematuhan apa-
elektrik, segala kos melaksanakan pengalihan atau penempatan semula akan apa perintah kerajaan, kerajaan tempatan atau mana-mana pihak berkuasa lain.
ditanggung sepenuhnya oleh Pengguna atau pemilik yang mana berkenaan.
. 29. INDEMNITI DAN LIABILITI TIDAK BOLEH TUNTUT
23. KEJADIAN KEINGKARAN (a) Pengguna bersetuju untuk menanggung rugi dan akan terus menanggung rugi
Kejadian mana-mana perkara di bawah adalah merupakan kejadian keingkaran di TNB daripada dan terhadap segala tuntutan, perbuatan, gantirugi, tuntutan
bawah Kontrak ini dan ia tidak terhad kepada: mahkamah, prosiding, dan segala kos guaman yang dibawa oleh pihak ketiga ke
(a) Tindakan atau keingkaran Pengguna yang telah menjejaskan kecekapan dan/atau atas TNB, pekerja atau agennya, yang mana TNB mungkin boleh
keselamatan pepasangan TNB. dipertanggungjawabkan akibat daripada perlaksanaan kontrak kecuali disebabkan
(b) Pengguna telah gagal mematuhi dan/atau pelanggaran mana-mana peruntukan oleh kecuaian atau perbuatan sengaja TNB, pekerja atau agennya.
Kontrak ini dan/atau Akta dan/atau melakukan apa-apa kesalahan di bawah Akta. (b) Pengguna bersetuju bahawa TNB, pekerja, pengkhidmat, agen, wakil tidak akan
(c) Pengguna ini telah mendapat kebenaran bagi pelantikan atau mengambilalih oleh bertanggungjawab dan/atau menanggung rugi kepada Pengguna apa-apa
penerima atau pelikuidasi itu sendiri atau keseluruhan atau sebahagian besar kerosakan, kecederaan atau kehilangan terhadap harta Pengguna dan/atau nyawa
daripada harta Pengguna. melainkan kerosakan, kecederaan atau kehilangan telah dibuktikan adalah
(d) Pengguna mengakui secara bertulis ketidakupayaan Pengguna untuk membayar disebabkan oleh perbuatan sukarela, cuai atau tidak melakukan dan/atau
hutang apabila hutang tersebut dituntut. kegagalan untuk mematuhi mana-mana standard keselamatan yang terdapat di
(e) Pengguna membuat serahanhak umum atau penyusunan atau komposisi dengan bawah mana-mana akta.
atau bagi faedah kepada pemiutangnya. (c) Pengguna juga bersetuju selanjutnya bahawa TNB tidak bertanggungan bagi
(f) Memulakan kes secara sukarela atau memfailkan petisyen terhadap mana-mana sebarang kos yang ditanggung, kehilangan dan/atau kerosakan barang-barang
pihak yang ingin mendapatkan kelebihan daripada mana-mana undang-undang industri, produk, harta atau nyawa Pengguna akibat daripada kemalangan yang
yang berkaitan dengan kebankrapan, insolvensi, penstrukturan hutang, tidak dapat dielakkan, ketidaktetapan voltan, gangguan, pengurangan dan/atau
penggulungan atau komposisi. gangguan bekalan elektrik, kebakaran atau kemalangan yang mungkin
(g) Pengguna diletakkan di bawah penerimaan atau pentadbiran khas atau likuidasi. disebabkan oleh bekalan elektrik atau penggunaan atau penyalahgunaan yang
(h) Pengguna ini diisytiharkan muflis/bankrap oleh Mahkamah. tidak disebabkan oleh kecuaian atau perbuatan sengaja TNB dan/atau
(i) Telah berlakunya pembubaran atau kematian di pihak Pengguna. kakitangannya.
(j) Kegagalan untuk membayar jumlah yang ditetapkan di bawah Klausa 21 di atas.
(k) Penggunaan bekalan elektrik secara tidak jujur. 30. KEBENARAN TUAN TANAH
(l) Kegagalan Pengguna mematuhi mana-mana peruntukan di bawah Klausa 13 Sekiranya perlu, Pengguna boleh membantu TNB mendapatkan kebenaran tuan tanah
kontrak ini. bagi penyambungan bekalan elektrik ke premis Pengguna.

Pada tarikh kuatkuasa penamatan Kontrak, TNB akan dilepaskan daripada sebarang
obligasi dan liabiliti di bawah Kontrak ini. D. LAIN-LAIN PERKARA

24. PEMOTONGAN BEKALAN ELEKTRIK 31. CUKAI-CUKAI


TNB boleh memotong bekalan kepada Pengguna dengan memberikan notis bertulis (a) Cukai Perkhidmatan
tidak kurang daripada tujuh (7) hari bekerja terlebih dahulu dalam mana-mana keadaan Pengguna hendaklah menanggung dan membayar Cukai Perkhidmatan yang mungkin
yang dinyatakan di bawah: dikenakan oleh kerajaan ke atas perkhidmatan-perkhidmatan dari semasa ke semasa.
(a) Apa-apa keingkaran oleh Pengguna di bawah Klausa 23 dan keingkaran tersebut
tidak diremedi dalam tempoh yang ditetapkan jika ada; Bagi maksud klausa ini:
(b) Sebarang hak untuk memotong bekalan seperti yang diperuntukkan di bawah
Akta. "Cukai Perkhidmatan" bermaksud Cukai Perkhidmatan yang terpakai bagi Kontrak
menurut Akta Cukai Perkhidmatan;
25. PENAMATAN KONTRAK OLEH TNB
(a) TNB boleh menamatkan Kontrak ini di atas sebab-sebab yang munasabah dengan “Akta Cukai Perkhidmatan” bermaksud sebagai Akta Cukai Perkhidmatan 2018
mengambilkira hal keadaan yang sewajarnya, atau di atas sebab-sebab yang Malaysia termasuk kaedah-kaedah, peraturan atau garis panduan yang dikeluarkan
dibenarkan oleh Undang-Undang dan Kontrak ini dengan memberikan notis secara oleh pihak berkuasa yang berkaitan yang bertanggungjawab ke atas cukai tersebut.
bertulis tidak kurang dari empat belas (14) hari bekerja mengenai niatnya untuk
berbuat demikian. (b) Cukai-Cukai dan Levi-Levi yang Lain
(b) TNB boleh juga menamatkan Kontrak ini di bawah Klausa 23 dengan memberi Kecuali dinyatakan sebaliknya, Pengguna hendaklah bertanggungjawab ke atas semua
notis bertulis empat belas (14) hari bekerja yang bermula dari tarikh tamat tempoh cukai semasa dan akan datang, duti-duti, levi-levi, dan caj-caj yang serupa termasuklah
remedi (sekiranya ada). mana-mana faedah dan penalti yang berkaitan, walau bagaimana cara sekalipun ianya
(c) Sekiranya TNB menerima sebarang notis pemotongan daripada Pengguna maka diperuntukkan (selepas ini dirujuk sebagai ‘Cukai-Cukai Lain’), yang timbul daripada
penerimaan tersebut adalah dianggap sebagai notis penamatan kontrak oleh satu atau yang berkaitan dengan apa-apa jenis pembekalan yang dikenakan oleh
Pengguna tertakluk kepada penyerahan notis oleh TNB di bawah Klausa 25(a). undang-undang.
(d) Jika TNB mendapati bahawa maklumat yang diberikan adalah palsu dan/atau
dipertikaikan dengan kewujudan bukti prima facie yang berhubungan dengan 32. PERUNTUKAN UNDANG UNDANG
pembekalan elektrik dan dibuktikan dengan mana-mana undang-undang yang Kontrak ini adalah tertakluk dan ditafsirkan mengikut Akta dan sebarang Peraturan yang
terpakai, TNB berhak untuk menamatkan Kontrak ini selepas memberi notis dibuat di bawahnya termasuk sebarang pindaan kepadanya serta mana-mana undang-
bertulis tidak kurang daripada 48 jam. undang bertulis lain yang berkaitan.

26. NOTIS 33. PINDAAN, MODIFIKASI ATAU GANTIAN


Melainkan dan kecuali diperuntukkan di bawah Akta dan mana-mana klausa dalam Tiada apa-apa pindaan atau perubahan terhadap Kontrak ini mengikat melainkan ia
Kontrak ini, apa-apa notis, tuntutan atau komunikasi-komunikasi lain yang diperlukan dipersetujui melalui instrumen bertulis yang ditandatangani oleh pihak-pihak yang
atau dibenarkan untuk diberi atau dibuat di bawah Kontrak ini hendaklah dibuat secara berkontrak bagi maksud pindaan tersebut.
bertulis dan hendaklah disampaikan secara serahan tangan atau melalui pos berdaftar
prabayar atau pos biasa atau secara elektronik berdasarkan pilihan pengguna kepada 34. SERAHAN HAK
alamat yang diberikan dalam Kontrak ini. Bukti pengeposan atau penghantaran apa- Pengguna tidak dibenarkan menyerahkan apa-apa hak atau obligasi yang timbul di
apa notis, tuntutan atau komunikasi akan dianggap sebagai bukti penerimaan: bawah Kontrak ini kepada mana-mana pihak ketiga tanpa kebenaran bertulis terlebih
(i) sekiranya disampaikan secara serahan tangan, pada masa ia diserahkan dan telah dahulu daripada TNB.
diakui penerimaannya;
(ii) sekiranya surat dihantar melalui pos, pada hari ketiga (3) Hari Bekerja selepas 35. PENGENEPIAN
pengeposan. Pengetahuan atau keakuran oleh TNB atas pelanggaran mana-mana syarat atau
(iii) sekiranya dihantar secara elektronik, pada masa ia dihantar kepada penerima. tanggungjawab yang terkandung di atas tidak dianggap sebagai atau disifatkan sebagai
(iv) sekiranya dihantar secara pos dan elektronik, pada hari ketiga (3) hari bekerja pengenepian mana-mana syarat atau terma atau mana-mana daripadanya dan walau
selepas pengeposan. apa pun pengetahuan atau keakuran sedemikian, TNB berhak untuk menguatkuasakan
haknya di bawah Kontrak ini.
27. PENYAMPAIAN PROSES UNDANG-UNDANG
Penyampaian sebarang proses undang-undang hendaklah melalui pos berdaftar 36. TEMPOH MASA
prabayar yang dihantar kepada alamat yang diberikan dalam Kontrak ini. Bukti Tempoh masa adalah intipati di bawah Kontrak ini.
pengeposan akan dianggap sebagai bukti penerimaan dan penyampaian berkenaan
hendaklah dianggap lengkap selepas lima (5) hari dari tarikh pengeposan.

3
37. PENGGANTI HAKMILIK mengurangkan Kehendak Maksimum kepada Kehendak Maksimum
Kontrak ini hendaklah mengikat terhadap pengganti hakmilik dan pemegang-pemegang Diisytiharkan.
serah hak yang dibenarkan oleh mana-mana pihak di bawah Kontrak ini.
47. CAJ SAMBUNGAN BEBAN (CSB)
38. DUTI SETEM Pengguna dikehendaki untuk membayar Caj Sambungan Beban (jika ada) apabila
Duti setem di bawah Kontrak ini akan ditanggung dan dibayar sepenuhnya oleh mengambil bekalan pada Voltan Sederhana, Voltan Tinggi atau Voltan Amat Tinggi
Pengguna. berdasarkan dasar semasa Tarif dan polisi Caj Sambungan.

39. KEBOLEHASINGAN 48. GANTIRUGI BERES


Jika satu atau lebih peruntukan di dalam Kontrak ini atau sebahagian darinya tak sah Sekiranya Pengguna gagal atau berhenti mengambil bekalan untuk tempoh lima (5)
atau menjadi tidak sah atau tidak terpakai atas apa-apa juga alasan, ianya tidak akan tahun selepas bekalan diberikan, Pengguna hendaklah membayar kepada TNB Ganti
sama sekali mengganggu atau merosakkan keesahan atau penguatkuasaan Rugi Beres. Dengan syarat bahawa jumlah dan bayaran Gantirugi Beres adalah
peruntukan yang lain. tertakluk kepada dasar semasa Tarif dan polisi Caj Sambungan.

40. PEMASANGAN PERALATAN UNTUK MENJANA ELEKTRIK


Pengguna hendaklah memaklumkan kepada TNB sebarang pemasangan peralatan
bagi tujuan penjanaan di dalam premis Pengguna.

41. POWER QUALITY


Pengguna hendaklah memastikan semua pepasangan elektrik mempunyai immuniti
yang mencukupi terhadap kejadian voltan yang mempunyai tempoh singkat (sag &
swell) dan voltan fana (transient), dan tidak akan menjana (emisi) kejadian kualiti kuasa
lain yang boleh memudaratkan sistem bekalan elektrik. Standard kualiti kuasa yang
berkaitan adalah ditakrifkan dalam buku panduan permohonan bekalan elektrik TNB
(ESAH).

42. FAKTOR KUASA


Pengguna hendaklah pada setiap masa melaksanakan usaha yang terbaik untuk
memperolehi nilai faktor kuasa hampir kepada nilai 1.0 dalam semua operasi
pepasangan elektrik. Caj faktor kuasa akan dikenakan kepada Pengguna, berdasarkan
kadar semasa yang diluluskan berdasarkan Akta sekiranya nilai faktor kuasa bulanan
kurang dari nilai faktor kuasa minimum yang ditetapkan di bawah polisi semasa TNB.
Pengguna di bawah tarif domestik dan tarif lampu jalan adalah dikecualikan caj faktor
kuasa.

43. ALAT KIMPALAN


Selain daripada kadar tarif yang berkaitan, Pengguna Voltan Rendah,Voltan
Sederhana, Voltan Tinggi dan Voltan Amat Tinggi yang memasang alat kimpalan
elektrik yang menggunakan alat ubah akan dikenakan caj. Alat kimpalan elektrik
berkendalian motor adalah dikecualikan caj tersebut.

44. KERAHSIAAN
Melainkan ia adalah atau menjadi sebahagian daripada kepentingan awam, semua
maklumat yang diberikan oleh pihak yang berkontrak adalah sulit pada setiap masa
kecuali dinyatakan sebaliknya secara bertulis.

45. DATA PERIBADI


(a) TNB akan mematuhi peruntukan Akta Perlindungan Data Peribadi 2010 (“APDP
2010”) semasa memproses data peribadi Pengguna di bawah Kontrak ini;
(b) TNB boleh menzahirkan data peribadi Pengguna kepada peguam, agensi-agensi
kutipan hutang dan mana-mana pihak ketiga yang dilantik oleh TNB sebagai
agen, kontraktor, pembekal perkhidmatan dan/atau penasihat profesional bagi
apa-apa tujuan berkaitan pembekalan elektrik kepada Pengguna;
(c) Pengguna boleh membuat sebarang pertanyaan, aduan atau permohonan untuk
akses atau pembetulan kepada data peribadinya yang berkaitan dengan
pembekalan elektrik kepada TNB;
(d) Pengguna dengan ini memberi persetujuan bahawa data peribadi mereka boleh
dipindahkan ke luar Malaysia untuk maksud yang sah atau yang perlu dan
berkaitan dengan aktiviti pembekalan elektrik oleh TNB. Namun begitu, sekiranya
tiada persetujuan yang diberikan oleh Pengguna, pihak TNB boleh melakukan
pemindahan data peribadi tersebut ke negara yang mempunyai undang-undang
perlindungan data peribadi yang sekurang-kurangnya setara dengan tahap
perlindungan yang diberikan oleh APDP 2010 atau bagi tujuan menjalankan apa-
apa fungsi yang diberikan kepada mana-mana orang dibawah mana-mana
undang-undang; dan
(e) Polisi Perlindungan Data Peribadi TNB boleh diakses oleh Pengguna di
https://www.tnb.com.my/pdpa

E. KLAUSA TAMBAHAN BERIKUT TERPAKAI BAGI PERNIAGAAN/ PENGGUNA


BUKAN DOMESTIK / PENGGUNA KUASA BESAR (PKB)

46. KEHENDAK MAKSIMUM


Pengguna yang mengambil bekalan pada tahap Voltan Sederhana, Voltan Tinggi atau
Voltan Amat Tinggi, hendaklah bertanggungjawab untuk memastikan bahawa
Kehendak Maksimum Sebenar tidak melebihi Kehendak Maksimum Diisytiharkan;
(i) Sekiranya Kehendak Maksimum Sebenar melebihi dari Kehendak Maksimum
Diisytiharkan pada bila-bila masa dalam tempoh ditetapkan, Kehendak
Maksimum Sebenar tersebut akan menjadi Kehendak Maksimum
Diisytiharkan yang baru bagi tujuan pembilan dan berkuatkuasa mulai dari
tempoh pembilan yang berikutnya.
(ii) Walau apa pun yang dinyatakan di atas, sekiranya Kehendak Maksimum
Sebenar yang direkodkan melebihi Kehendak Maksimum Diisytiharkan dan
kesan lebihan itu menyebabkan atau menjejaskan keselamatan, keselamatan
dan kecekapan sistem TNB, TNB mengikut budi bicara mutlaknya boleh

You might also like