SR. NO. TYPE OF ACTIVITY JSA NO.
1 Loading & Unloading RMK/JSA/01
2 Temp. Shed Making RMK/JSA/02
3 Electrical Instalation RMK/JSA/03
4 Excavation RMK/JSA/04
5 GI Sheet Barrication RMK/JSA/05
6 Concrete Work RMK/JSA/06
7 Reinforcement & Shuttering RMK/JSA/07
8 Bar Bending RMK/JSA/08
9 Scaffolding Errection & Dismentaling RMK/JSA/09
10 Column,Slab Shuttering & Pouring RMK/JSA/10
11 Power Tool Operation RMK/JSA/11
12 Masonary & Plaster Work RMK/JSA/12
13 Hot Work RMK/JSA/13
14 Hoisting & Rigging RMK/JSA/14
15 Anti Termite RMK/JSA/15
16 Painting RMK/JSA/16
17 Roofing & Cladding RMK/JSA/17
18 Water Proofing Work RMK/JSA/18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental .
Job/ Activity: Loading-Unloading 1 Document No.: RMK / RA / 01
Location: All around site Date:
RISK ASSESMENT
Job/ activity Job steps/ Methods Hazards Identified Risk Involved Control Measures
Safety induction training will be conducted for all workers.
Tool box talk shall be taken before start the work.
Work permit shall be obtained on daily basis.
Mobilization of new wrong practices due to Personal injury/ property
PPE's will be used by all workers (safety helmet, reflective jacket, safety
manpower lack awareness damage
shoes, hand gloves etc.)
trained workforce shall be deployed for work.
work will be done under proper supervision.
Vehicle can get reverse Personal injury/ property chocker/stopper should be provided to vehicle.
due to slope surface damage ensure that vehicle park at even surface.
cut injury gloves provided to workers whos involve in this activity.
sharp edge of material sling / web belt can sharp edge will be protected / covered by cloth or pad.
damaged cut proof gloves will be provided to specific task.
Material unloading from two person will holding to material during unloading-loading.
Material can unbalance Material damaged /
vehicle/ truck
due to long length personal injury double sling will be provided to loading-unloading of material by hydra.
Proper access will be provided for movement.
Person can fall/ tripp or
access will be maintained clean & without obstacle.
material topple due to Personal injury/ property
guy rope will be provided to material during shifting.
uneven/ improper damage
material shifting will be done by correct method of shifting.
Material Loading- access
unloading & trained workforce shall be deployed for work.
shifting Only Trained work force deploying for unloading Work
Untrained Manpower or Major Injury / Material Fall/
(Manually & Only Trained and expieriance operator having valid liecence to allowed to
Mechanically) operator vehicle toppled
crane operation
Before start using crane or lifting tools satutary compliance complete
Material unloading from ( Form 12, Insurance, Registration record ) to be submitted
vehicle/ truck by using Improper crane or Material fall / sling or belt Checked SWL of crane used for unloading
crane / hydra Lifting tolls damage / Only Inspected crane and Lifting tackles can allowed to used
Before start the work sling / web belt will be checked.
correct size of sling will be used for unloading/ loading.
Sling / web belt can
Material can fall down/
came out from lifting Safety latch to lifting hook will be provided & ensured it is properly working.
personal injury
hook.
Material will be stacked on base which can provide gap between material
& ground.
material stacking at Material can fall down/ material will be stacked up to only 04 feet hieght.
Material stacking
more hieght. personal injury Material will be stacked with sagrigation as per types.
load over the G.I.Sheet will be kept to avoid fying due to air
material will be stacked properly at site & batrricade to it.
Emergency pathway shall be clean,clear & assembly point shall be known
Confusion, panic to every worker.
In case of emergency Fall of person/material
situations
Emergency response plan shall be communicated to all workers.
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity: Temporary shed making 2 Document No.: RMK / RA / 02
Location: All around site Date:
RISK ASSESMENT
Job/ activity Job steps/ Methods Hazards Identified Risk Involved Control Measures
Safety induaction training will be conducted for all workers.
Tool box talk shall be taken before start the work.
wrong practices due to Work permit shall be obtained on daily basis.
Mobilisation of new lack of training/ Personal injury/
manpower knowledge regarding property damage PPE's will be used by all workers (safety helmet, reflective
work. jacket, safety shoes, hand gloves etc.)
trained workforce shall be deployed for work.
work will be done under proper supervision.
All area shall be barricaded with tape
Proper scaffolding & platform (600 mm mimimum) shall be used
Scaffolds may collapse Injury to person / for height work
due to uneven surface property damage Scaffold Erection & dismantling work will be done under
supervision.
Scaffold shall be erected properly leveled base.
Working on height/ Injury to person Proper access shall be provided to work place.
scaffolding Improper Access on
scaffold All scaffold material & other material will be stacked properly at
Slip, Trip hazard
work place & work area shall be kept always clean.
Making of
Temporary Shed Fall Of person from Fixed Lifeline before start activity (18 mm nylon rope )
Personal Injury
by using GI Sheet Height Provide full body harness with double lanyard
one standby person will be attended at the ground to avoid the
Unauthorized person tress passer.
Injury to person
Entry
All area shall be barricaded with tape
proper method of material handling will be used.
Material handling &
personal Injury
shifting. Hand gloves shall be used for material handling & shifting work.
RISK ASSESMENT
Job/ activity Job steps/ Methods Hazards Identified Risk Involved Control Measures
Safety induaction training will be conducted for all workers.
Tool box talk shall be taken before start the work.
wrong practices due Work permit shall be obtained on daily basis.
Mobilisation of new to lack of training/ Personal injury/
manpower knowledge regarding property damage PPE's will be used by all workers (safety helmet, reflective jacket,
work. safety shoes, hand gloves etc.)
trained workforce shall be deployed for work.
work will be done under proper supervision.
all legal documents of machine will be checked.
Use of fulaty machine
Only inspected machine will be used for work.
Untrained operator person cot in only trained & license holder operator shall be allowed for work
between pocklen
vehicles shall be kept 2 mtr. Away from the edge.
Excavation up to 03 feet machine working near while movement
banks man/supervisor will be provided to give direction during
for fixing electrical poles edge
reverse movement of vehicle
by powered equipments
Barrication will be provided to all pits.
Fall of signage board shall be provided at site.
Electrical work Unbarricatted pits person/material in
pits proper route shall be demarked for vehicle/man movement.
all work shall be done under competent supervisor
skin irritation/ PVC gloves & gum boot will be used while concrete work.
working with cement
inhallation dust mask,PVC gloves will be provided for mixing of concrete.
concrete work for pole
falling of pole due to after concreting support will be provided to pole from all side.
fixing support will be removed next day after confirmation that concrete
absence of external personal injury
is set properly.
support pole will be fixed in concrete up to 03 feet depth.
only trained workforce will be deployed for job.
full body harness will be used for height work
Personal injury/
fall of person M.S. ladder will be provided for height work.
property damage
ladder will be inspected by safety officer
Cable laying in hook on
M.S. Pole is made as ladder for cable laying.
M.S. Pole @ 5 meter cable will be fixed to M.S hook with pvc cover to avoid friction by
cable damage due to wind pressure.
cable will be tied by cable tie.
friction of cable with electric shock
m.s. hook MS pole will be fixed at 20 mtr. Distance top avoid sag in cable.
No work will be done in live cables.
all joints will be given with proper insulating & loopse at joint place.
joints in cable Improper joint in cable electric shock round knot will be provided to avoid self open of joint due to stree/
load.
cable joint will be kept in vertical position & tied by cable tie.
only authorized person (electrician) will be allowed to electrical
work
electrical gloves will be used for working on live equipments /
electric shock due to supply.
electric shock
use of damaged tools
proper insulated tools will be used for electrical work.
all supply will be isolated before start the work.
GI wire use for earthing in earth pit to all panels.
distribution panel will be kept on platform & fixed by anchor
Distribution Panel fastener.
Installation at location
all distribution panel will be covered & protected from rain fall.
all panel will be kept in lock & key at site.
Open panel / rain Ensure that no water lines laying nearby DB Panel.
fall /leackage curing short circuit / fire
pipe near DB panel 30 mA RCCB & 63 mA MCB will be provided to all DB panels.
all connections shall be given through RCCB & MCB.
Electrical work
all cables will be inserted in RCCB & MCB with proper crimpted.
all sockets in DB panel will be covered.
all joints will be given with proper insulating & loopse at joint place.
connections taking to use of damaged cable
Electric shock / pin top will be provided to all connections
power tools/halogen /
machinery lugs will be used for cable joint & proper insulated.
mercury/ construction
damaged cable joint will be not be kept in water/wet place/sharp objects.
machinery correct size of cable / double insulated,03 core & correct size of cable will be used for
cord connections.
electric shock due connections without pin top will not be allowed at site.
to cut of cable by GI all cable will be laying through pvc flexible pipe in site offices.
sheet double insulated 03 core cable will be used for connections.
cable fitting in site cable damage due to
cable tie by binding wcable will be tied by cable tie.
offices. cut by GI sheet
shock due to cable all tube light will be fitted on wooden Patti & then tied on m.s. pipe.
touch with sheet all work shall be done under competent electrician.
Emergency pathway shall be clean,clear & assembly point shall be
Confusion, panic Fall of known to every worker.
In case of emergency
situations person/material
Emergency response plan shall be communicated to all workers.
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity: Excavation 4 Document No.: RMK / RA / 04
Location: All around site Date:
RISK ASSESMENT
Job/ activity Job steps/ Methods Hazards Identified Risk Involved Control Measures
Safety induaction training will be conducted for all workers.
Tool box talk shall be taken before start the work.
wrong practices due Work permit shall be obtained on daily basis before work start.
Mobilisation of new to lack of training/ Personal injury/
manpower knowledge regarding property damage PPE's will be used by all workers (safety helmet, reflective jacket,
work. safety shoes, hand gloves etc.)
trained workforce shall be deployed for work.
work will be done under proper supervision.
All machinery shall be checked at site before start of work as checklist.
Use Of faulty
machinery Training shall be given to all operator for safe driving & operating of
equipment.
Fatality/ Personal Only trained & license holder operator will be allowed for operation.
injury/ property vehicles shall be kept 2 mtr. Away from the excavated pit edge.
Machine can fall in pit
damaged Proper access & adequate space shall be maintained for machine
operation and man movement.
Use of Powered Man-Movement near Area shall be barricaded & flag man, signal man and supervisor shall
equipments machine boom radius be deployed for control unwated entry/ man movement during
(Pocklen,JCB) for area excavation work.
excavation. all debris & material will be removed from area or kept 1.5 mtr away
from the edge.
Fatality/ Personal
side collapsing vehicle movement shall be kept 2 mtr away from excavated pit.
injury
adequate shoring / protection shall be provided where required.
loose material will be removed from the edge of pit.
Shock due to all underground utilities shall be identified isolated before start the
damaged of live work.
Excavation & Underground utilities
cable, Property All PPE's will be provided to workers as per activity.
Backfilling damage Work will be start after only de-enrgized all live ecrtical cables.
Excavation &
Backfilling
RISK ASSESMENT
Job/ activity Job steps/ Methods Hazards Identified Risk Involved Control Measures
Safety induaction training will be conducted for all workers.
wrong practices due to Tool box talk shall be taken before start the work.
Mobilisation of new lack of training/ Personal injury/ Work permit shall be obtained on daily basis.
manpower knowledge regarding property damage PPE's will be used by all workers (safety helmet, reflective
work. jacket, safety shoes, hand gloves etc.)
trained workforce shall be deployed for work.
work will be done under proper supervision.
Faulty hand tools
Safety Shoes, handgloves, Nose mask Shall be Provide to
used/ sharp edges of
workers
Manual Excavation tools injury to person
underground utilities/
all underground utilities shall be checked & disconnected.
Barrcation by GI live cable
Sheet to work Handling of material &
area ( Height Up Cotton gloves will be provided for GI sheet handling.
GI sheet Cut injury
To 20 Feet) Area shall be barricated.
Only trained person shall be deployed for work
fall of Material/tools
Work done under proper supervision
Personal injury/
Working at height Unauthorised person not allowed in work area
property damage
Full Body Harness shall be provide to workers
Fall of person from
Area shall be barricated.
height
Proper Working platform shall be provided
Emergency pathway shall be clean,clear & assembly point
Confusion, panic Fall of shall be known to every worker.
In case of emergency
situations person/material Emergency response plan shall be communicated to all
workers.
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity: Concrete work 6 Document No.: RMK /RA/06
Location: All around site Date:
RISK ASSESMENT
Job/ activity Job steps/ Methods Hazards Identified Risk Involved Control Measures
Safety induaction training will be conducted for all workers.
wrong practices due Tool box talk shall be taken before start the work.
Mobilisation of new to lack of training/ Personal injury/ Work permit shall be obtained on daily basis before work start.
manpower knowledge regarding property damage PPE's will be used by all workers (safety helmet, reflective jacket,
work. safety shoes, hand gloves etc.)
trained workforce shall be deployed for work.
work will be done under proper supervision.
Nose mask, Gum Boot, Safety goggel, PVC gloves shall be provided
Cement, crush sand Flying dust particles Skin irritation,
for working with cement, crush sand
loading in Hopper inhalation
Chemical in cement Adequate ventilation shall be provided at work place.
Nose mask, Gum Boot, Safety goggel, PVC gloves shall be provided
Fumes, chemical in for working with cement, crush sand
concrete
work will be done under proper supervision.
Proper access shall be provided in pit.
Personal injury due
Ladder / steps shall be used for access.
Improper access in pit to fall in pit
Ladder shall be tied at top & bottom to avoid slip.
No material shall be hold in hand during climbing on ladder.
Concrete in Excavated
Open/ unbarricated All pits shall be hard barricated & cuation board shall be displayed in
Concrete work pit
pit local language.
Vehicle movement shall be allowed 1.5 meter away from the edge of
pit.
Vehicle movement Fatality/ property
Reverse horn shall be ensured during reverse movement of vehicle.
near edge of pit damage
Banks man shall be deployed for direction in case absence of reverse
horn.
Only inspected scaffolding shall be used for height work.
Proper platform shall be provided for height work.
MS jalli shall be provided & tied at both end.
Improper scaffolding,
Defective jalli shall not be used for platform.
platform & access
Proper access shall be provided on scaffold at 500 mm distance
bracing/ ladder will be provided for access.
Ladder shall be tied at top & bottom to avoid slip.
Concrete work at Fatality/ property
Material holding in No material shall be hold in hand during climbing on ladder.
height damage
hand during Rope with bag shall be provided for material shaifting at height near
movement on ladder each ladder
Concrete work at Fatality/ property
height damage
Concrete work
height damage
RISK ASSESMENT
Job/ Activity Job Steps Type Of Hazard Risk Involved Risk Control measures
Safety induaction training will be conducted for all workers.
wrong practices Tool box talk shall be taken before start the work.
Mobilisation of due to lack of Personal injury/ Work permit shall be obtained on daily basis before work start.
new manpower training/ knowledge property damage PPE's will be used by all workers (safety helmet, reflective jacket, safety shoes, hand gloves
regarding work. etc.)
trained workforce shall be deployed for work.
work will be done under proper supervision.
P U Coated hand gloves shall beprovided for bar handling & shifting.
Sharp edges
Reinforcement Shouldar pad shall be provided for steel shifting manually.
Cut injury
shifting at location Proper access shall be provided in yard for material shifting.
Improper access
Pathway shall be maintained always neat & clean.
Proper stacking of ring shall be done.
stacking of steel Personal injury/
Fall of ring Ring shall be stacked in vertical pipe of scaffolding.
ring on platform property damage
No excess ring shall be stacked over platform
Only inspected scaffolding shall be used for height work.
Proper platform shall be provided for height work.
Improper MS jalli shall be provided & tied at both end.
scaffolding, Defective jalli shall not be used for platform.
platform & access Proper access shall be provided on scaffold at 500 mm distance bracing/ ladder will be
provided for access.
Ladder shall be tied at top & bottom to avoid slip.
Reinforcement Fatality/ property
Material holding in damage
work hand during
Reinforcement No material shall be hold in hand during climbing on ladder.
work at Ground & movement on
ladder Rope with bag shall be provided for material shaifting at height near each ladder
height
Full body harness shall be provided with double snap hook.
Fall of person / fall Proper railing (Top, Mid) shall be provided at platform.
of material Safety net shall be provided for fall protection where is needed.
Underneath area shall be barricated & no work shall be allow at underneath area.
Nylon rope shall be provided for material lifting at height.
Material lifting at Rope shall be check before start lifting work, damaged rope shall not be used for lifting.
height No person shall be allow at ground during material lifting.
Underneath area shall be barricated & no work shall be allow at underneath area.
All cables shall be overheaded & tied with cable tie.
Inadequate access
Adequate illumination shall be provided at work place & pathway.
Reinforcement Access shall be maintained neat & clean.
work in dark Personal injury
hours Emergency exit shall be illuminated in dark hours.
improper access
Work shall be done under supervison.
Emergency vehicle shall be available till completion of work.
In case of Confusion, panic Fall of Emergency pathway shall be clean,clear & assembly point shall be known to every worker.
emergency situations person/material
Emergency response plan shall be communicated to all workers.
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity: Bar Bendng 8 Document No.: RMK /RA/08
Location: All around site Date:
RISK ASSESMENT
Job/ Activity Job steps Type Of Hazard Risk Involved Risk Control measures
Safety induaction training will be conducted for all workers.
Tool box talk shall be taken before start the work.
wrong practices due to Work permit shall be obtained on daily basis before work start.
Mobilisation of lack of training/ Personal injury/
new manpower knowledge regarding property damage PPE's will be used by all workers (safety helmet, reflective jacket, safety shoes, hand gloves
work. etc.)
trained workforce shall be deployed for work.
work will be done under proper supervision.
Packing MS strip shall be removed from steel bundle or sharp edge shall be bend down.
No person shall be allow walking over steel bundle in yard.
Sharp edge of packing
Bar shifting at MS strip/ bar Cut injury Steel bar shall be pull from end of the bar.
cutting machine P U Coated hand gloves shall beprovided for bar handling & shifting.
(Manually) Shouldar pad shall be provided for steel shifting manually.
Trip/ Slip due to Proper access shall be provided in yard for material shifting.
Personal injury
Improper access Pathway shall be maintained always neat & clean.
Double insulated cable shall be provided for cutting machine.
Uninsulated cable/ Cable shall be overheaded & joint properly insulated.
Joint/ Improper Proper earthing shall be provided to cutting machine.
earthing/ Fatality due to
Supply to machine shall be taken from DB panel having 30 mA RCCB/ELCB.
electric shock
On-Off switch of machine shall be in working condition.
Machine shall be taken in use after inspection of mechanic & electric department.
Fualty machine
No fualty machine shall not be used.
Unguarded rotating All rotating parts shall be properly guarded.
parts Locking system to blade & guard shall be provided to machine.
Bar Bending &
Job clamp shall be provided to machine.
Cutting work Personal injury
Bar cutting & Improper blade/ blade Proper rating of RPM of blade shall be used.
bending by fitting/ job clamp Spanner & proper tools shall be used for blade fitting.
cutting machine Damaged blade shall not be taken in use, scrap blade shall be properly stacked.
& bending
Only trained person shall be allow for machine operation.
machine Untrained operator
Training shall be provided to operator regurarly.
Eye injury/ Safety goggel & nose mask shall be provided to opeerator.
damage of ear Ear plug shall be provided to reduce noise level.
Flying partcile/ High drum/ Inhalation Adequate ventilation shall be provided at work place.
noise/ Fumes All combustible material shall be removed regularly.
Fire
Flying partcile/ High
noise/ Fumes
Fire extinguisher & buckets shall be provided near machine area.
Fire
Housekeeping shall be maintained in steel yard.
Oil spillage Oil spillage shall be clean immedetaley.
Improper pins of limit Standard locking pins shall be provided.
switch Only trained person shall be allow for machine operation.
All cables shall be overheaded & tied with cable tie.
Inadequate access
Adequate illumination shall be provided at work place & pathway.
work in dark Access shall be maintained neat & clean.
Personal injury
hours Emergency exit shall be illuminated in dark hours.
improper access
Work shall be done under supervison.
Emergency vehicle shall be available till completion of work.
In case of Confusion, panic Fall of Emergency pathway shall be clean,clear & assembly point shall be known to every worker.
emergency situations person/material
Emergency response plan shall be communicated to all workers.
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity:Scaffolding 9 Document No.: RMK / RA /09
Location: All around site Date:
RISK ASSESMENT
Job/ Activity Job steps Type Of Hazard Risk Involved Risk Control measures
Safety induaction training will be conducted for all workers.
Tool box talk shall be taken before start the work.
wrong practices due Work permit shall be obtained on daily basis before work start.
Mobilisation of to lack of training/ Personal injury/
new manpower knowledge property damage PPE's will be used by all workers (safety helmet, reflective jacket, safety shoes, hand gloves
regarding work. etc.)
trained workforce shall be deployed for work.
work will be done under proper supervision.
P U Coated hand gloves shall beprovided for bar handling & shifting.
Material shifting Sharp edges Cut injury/Fall of Shouldar pad shall be provided for steel shifting manually.
from yard to wark person / Fall of
place material Proper access shall be provided in yard for material shifting.
Improper access
Pathway shall be maintained always neat & clean.
Scaffold may tilt & Scaffold shall be erect on even surface otherwise jack shall be provided for leveling.
fall down due to Base plate shall be provided to each vertical pipe of scaffold at base.
Uneven surface All material shall be inspect before start erection.
Scaffold Damaged/ Bent Bent / damaged material shall not be used for scaffolding erection.
Personal injury/
Erection & Scaffold erection material used for Only trained rigger will be deployed for scaffold erection.
property damage
dismantling erection Scaffold erection work shall be done under strict supervision.
Inadequate Adequate supports shall be provided to scaffolding.
supporting to Height ration shall be maintained in scaffolding during erection.
scaffold Proper cross support & bracing shall be provided to scaffolding.
Only inspected scaffolding shall be used for height work.
Proper platform shall be provided for height work.
Improper
MS jalli shall be provided & tied at both end.
scaffolding, platform
& access Defective jalli shall not be used for platform.
Proper access shall be provided on scaffold at 500 mm distance bracing/ ladder will be
Scaffold erection provided for access.
at height Fatality/ property Otherwise Ladder shall be provided and tied at top & bottom to avoid slip.
Material holding in damage
hand during
movement on ladder
Scaffold erection
at height Fatality/ property
Material holding in damage
hand during No material shall be hold in hand during climbing on ladder.
movement on ladder Rope with bag shall be provided for material shaifting at height near each ladder
Full body harness shall be provided with double snap hook.
Fall of person / fall Proper railing (Top, Mid) shall be provided at platform.
of material Safety net shall be provided for fall protection where is needed.
Underneath area shall be barricated & no work shall be allow at underneath area.
Scaffold erection Nylon rope shall be provided for material lifting at height.
at height Material lifting at Personal injury/ Rope shall be check before start lifting work, damaged rope shall not be used for lifting.
height property damage No person shall be allow at ground during material lifting.
Underneath area shall be barricated & no work shall be allow at underneath area.
If scaffold damaged then first scaffold shall be repaired & made safe for dismantling.
Damaged scaffold
Only trained rigger will be deployed for scaffold dismantling.
Material shifting Material shall be shift by using nylon rope from height to ground.
scaffold from height No material shall be allow to throw from height.
Personal injury/
dismanteling at Scaffold Scaffold shall be dimantle as per row wise.
Scaffold property damage
ground & height dismanteling in Before proceed to next row, the entire components are removed.
Erection & unsafe manner
dismantling scaffold dismantling work shall be done under supervison.
Manmovement Underneath area shall be barricated & no work shall be allow at underneath area.
underneath area Standby person shall be deployed at underneath area & cuation board shall be dispalyed
All cables shall be overheaded & tied with cable tie.
Inadequate access
scaffold erection Adequate illumination shall be provided at work place & pathway.
& dismanteling Access shall be maintained neat & clean.
Personal injury
work in dark Emergency exit shall be illuminated in dark hours.
hours improper access
Work shall be done under supervison.
Emergency vehicle shall be available till completion of work.
In case of Confusion, panic Fall of Emergency pathway shall be clean,clear & assembly point shall be known to every worker.
emergency situations person/material
Emergency response plan shall be communicated to all workers.
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity: Column & Slab 10 Document No.: RMK / RA /10
Location: All around site Date:
RISK ASSESMENT
Sr. No. Activity Name Type Of Hazard Risk Involved Risk Control measures
10 Daily Work permit to be taken before starting the work
Tool box Talk shall be held before start of activities.
Use of proper PPE's as per activity (reflective jacket,safety Helmet , Hand Gloves,
Safety Goggles, Safety Shoes, etc.)
Work will be done under supervision
Trip hazard Severe Human Injury. Proper housekeeping should be maintained
All Shuttering material shuld be Stack Properly
Slip /Fall of man &
Injury to person Proper working platform should be provided
material
Work area should be barricaded.
Handgloves shall be provided
Improper handling of
Cut injury Projecting iron bar should be caped at the top or should be bended.
Reinforcement reinfocement bars
Awarness Shall be given by Daily TBT to use Hand gloves while handling material.
erection up to 4 mt
Opening in reinforcement Shutrring ply shall be provided to move on Reinforcement cage. Erect proper scaffold
Height For Coloumn Fall of person
bars on leveled base & should inspect before use
& Slab
Work On height for tieing Proper Working platform should be provided.
reinfocement bar & Full Body Harness with duoble lanyard should be provided.
shuttring plywood Anchorage poine should be defined for anchoring belt.
Fall Person From Height
Hard barrication shall be provided.
Instruction to be given for proper handling of material.
Proper housekeeping should be maintained.
Area Should be barricaded & unauthorised entry restricted.
Shuttering material should be lifting as method.
Fall of shuttering plywood Injury/property damage
While lifting material person should not be present below.
Include proper handling of ply in tool box talk.
Sharp Edges of shuttering Cut injury Inspect shuttering plates, do not use damaged plates. Use of handgloves shall be
plywood monitored.
Improper stacking of Personnel injury / fatal/trip Proper housekeeping shall be maitained. Stacking of material will be done in an
shuttering plywood. /fall isolated area.
Sharp protruding prop injury to person Cover top of the reinforcement bars to avoid protruding points
supprot
Sharp points of Personnel injury Shaarp edges of reinforcement should be bend / protection provided
shuttring around reinforcement bars
reinforcement bars.
shuttring around
reinforcement bars. Nail Piercing Injury to person Loose nail should be removed from site .
Work shall be carried out by competent person under proper supervision of foremen /
incharge.
Improper scaffold Fall of person All scaffold shall be erected as per approved scheme.
Scaffold shall be inspected by responsible person every day
Tag indicating scaffold status shall be attahced to scaffold
In dark period proper illumination should be provided.
Injury to person
Improper illumination All electrical cable joint should properly insulated.
during dark hours
Electrical Shock
ELCB should be provided to Electrical Distrubution Pannel.
All cable should be above ground supported on MS poles at a height of 2.1m.
Sharp Edges of Chute Hand gloves Should be provide for handling chute and ensure use of hand gloves
Cut injury
during handling.
Improper Housekeeping Injury to person Proper housekeeping should be maintained.
Concreting using Fall of vehicle ot Route should be demark for vehicle movement properly. Deploy Banks man to give
Tranjt Mixer Machine Excavated pits signals to vehicles.
Improper Road for Vehicle
Vehicle Movement shuold be 1 mtr away from Excavation pits.
Movement
Only Expierianced, Trained & Liecence holder Driver Should be deployed
All Legal Document of vehicle should be checked by safety officer.
Damaged insulation of All electrical cable joint should properly insulated.
Wire
Use of Vibrator for Route Electrical cable at height of 2.1 meter.
Shock
concrete settling All equipment should have industrial plugs.
Proper housekeeping shall be maintained at work areas.
All material shall be stacked properly away from edges of excavation.
Use of damaged machine Machinery / Vehicles to be checked before use.
Injury to Person
Slab Edge Should be brricated by using nylon rope before start work.
Working Near Slab Edge Person fall
Training shuld Shuold be given To worker about working near slab edge.
Slab Concreting using Full Body Harness with duoble lanyard should be provided.
concrete pump only traine person should be deployed.
Pipeline Fixing Fall of Pipe Nylon Rope Should Be provided to lifting pipe
proper support should be provided for resting pipe line on slab.
Proper Acssess Ladder Should be provided for slab
Ladder Should be Inspect before Used
Injury to person / fall of
Improper Acssess Ladder Should be fixed at top
person
Hand rail should be provided to ladded
Ladder Should not be lees than th reach point
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity: Power tools 11 Document No.: RMK /RA/11
Location: All around site Date:
RISK ASSESMENT
Job/ activity Job steps/ Methods Hazards Identified Risk Involved Control Measures
Safety induction training shall be conducted for all workers.
Tool box talk shall be taken before start the work.
wrong practices due to Work permit shall be obtained on daily basis.
lack of training/ Personal injury/
knowledge regarding property damage PPE's will be used by all workers (safety helmet, reflective jacket,
work. safety shoes, hand gloves etc.)
trained workforce shall be deployed for work.
work will be done under proper supervision.
Only Inspected tools will be used for work.
Power Tools will be checked by mechanic & Electrician before
Use of Fualty/ Damaged issued for use.
power tools Personal Injury/ Cut Body of tools shall be ensured in good condition.
of body part
Damaged tools will be not used for work.
All rotating parts of tools will be guarded.
Unguarded rotating parts
It will be ensured by supervisor before start work.
Working on Double insulated cable wil be provided to all power tools.
Use of Portable power
portable power tools at site. Proper cable joint will be provided with insulated.
tools Improper joint in cable Shock Cable will be overheaded at min 06 feet height.
Supply will be taken from DP panel having 30 mA RCCB.
Cable will be checked before start the work.
Fying particles/ Dust & Eye injury/ Safety goggel & nose mask will be used.
fumes Inhallation PPE's will be ensured by responsible supervisor.
Correct size of blade/ wheel will be used for tools.
Incorrect wheel/ blade
RPM of tools & blade will be chekced before used.
used to rotating tools
Cut of body part Blade/ wheel RPM will be ensured that more than tools.
Improper fitting of blade/ Proper fitting of blade will be ensured by mechanic.
wheel Only defined key & tools will be used for fitting.
safe access will be provided at work place.
Access will be maintained without any obstructions.
Improper access at
Injury to person Ladder will be provided to aproach at height.
ground & height
ladder will be fixed at 75 degree angle & tied at top & bottom
Inspected ladder will be only used.
Open edges near work All open edges will be barricated.
Fall of person
place Safety belt will be used to work near edges.
proper scaffolding & platform will be provided for height work.
proper access will be provided on scaffold.
Improper scaffold &
Working on Injury to person full body harness with double lanyard (Up to 06 meter) & shock
Use of Portable power platform
portable power absorber(Above 06 meter) will be used for height work.
tools
tools Inspected Scaffolding will be only used.
All flammable material will be removed from work area.
Fire due to Spatter Fire watcher will be deployed till completion of work.
Injury to person /
generating during Fire extinguisher will be kept near work. Area.
Property damage
operation Adequate water arrangment will be done.
Housekeeping will be done after completion of work.
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity:Masonary & Plaster 12 Document No.: RMK /RA/12
Location: All around site Date:
RISK ASSESMENT
Job/ activity Job steps/ Methods Hazards Identified Risk Involved Control Measures
Safety induction training shall be conducted for all workers.
Tool box talk shall be taken before start the work.
wrong practices due to Work permit shall be obtained on daily basis.
lack of training/ Personal injury/
Deploying new workforce PPE's will be used by all workers (safety helmet, reflective jacket,
knowledge regarding property damage
work. safety shoes, hand gloves etc.)
trained workforce shall be deployed for work.
work will be done under proper supervision.
Heavy concrete block
Rough surface of block cut injury to hand cotton gloves shall be used for handling of block.
handling
masonory & plaster work work with cement PVC gloves shall be used for work.
Fall/ tripp hazard due to Adequate illumination shall be provided at work place.
Block Work in dark hours Injury to person
Masonory & Inadequate illumination All electrical cable shall be laid on height.
Plaster work
use of damaged Full body harness should be provided with double lanyard.
harness full body harness should be checked before use on daily basis.
serious injury to proper access should be provided.
person Proper scaffold & ladder should be used.
Improper access/ scaffold
scaffold & ladder should be inspected by supervisor.
Masonory & plaster work proper anchorage point to be provided to anchoring belt.
at height no person will be allowed to stand below work area.
ground area should be barricated & one stand by person kept
unwanted person/ Injury to person/ where height work is carried out.
vehicle entry property damaged No vecichle shall be allowed below work area.
caution board 'Height work in progress' should be displayed at
work place.
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity: Hot Work 13 Document No.: RMK /RA/13
Location: All around site Date:
RISK ASSESMENT
Job/ activity Job steps/ Methods Hazards Identified Risk Involved Control
Gas cylinders should be carried Measures
by trolley only.
Gas cylinders should be tied with chain separately from trolley.
Damage of Gas cutting Fire and explosion Do not keep loose cylinders in hands.
set during handling. Neck guard will be fixed with cylinders all the time.
Do not handle the gas cutting set by pipes for handling.
Heat Radiation Stress, fatigue Wear the required PPE (Long Sleeve Coverall, apron, safetyGoggle etc)
Gas cutting. Falling Sparks / Hot bids Enclose the work location through barricading
- if hieght at work Burns, injury Ensure no one is working below the location of gas cut
Use Safety goggle for protection Against Liquid and Chemical Splashes
Cartridge type respirators to be used perform the task
Fall of spatter while
working on height Minor and major inju
Minimise human expose to paint/ thinner
2.Ensure the all electrical equipments are free from any defects
Welding Work 3.Ensure the all electrical tool / connection cables in good
condition and through ELCB (30mA).
4. Provide seperate ELCB to welding machine
Electrocution, 5.All the electric wire joints should be made using industrial sockets only.
nerves damage,
Electrocution internal organs 6.Do not any electrical work during rainy conditions
damage 7.Rout all electrical cables above
Welding at the required the ground
locations of the washer 8.All electrical cables protected from sharp edges
plates. 9. All power connections to be disconnected when not in use
1.Use proper PPE's during activity( welding shield with helmet, welding
appron, hand sleeve, leg guard, rubber shoe etc.)
Direct contact with UV Eye injury, 2.Proper clothing to be used while performing activity
lights skin irritation 3.Reduce the duration of exposer to UV lights with regular intervals
4.Ensure autherised person only perform the task
Ensure the welding machine is in good condition before use
1. Tag defective equipment so it cannot be used before it is repaired
2• Check leads for damage
3• DO NOT use damaged leads or connection
4• Check for defective electrode holders and guns, insulation damage,
overheating or suspected defects
5• Clean all contact surfaces and equipment
Faulty Equpment. 6• Check and tighten all external connections daily
Dirty Equpment. 7• Ensure earth leads are secure
Loose Connections. shocks,Coma,fatal,
8• Clothing and welding gloves need to be dry and gloves free from
Faulty PPE'S holes
9• Safety boots should have rubber soles
RISK ASSESMENT
Electrocution, nerves
4.Electrical hazard damage and interanal
organs damage, tissue
damage at entry and exit
Hoisting & Rigging
ESMENT
Control Measures
All statutory compliances to be done before starting the activity at site (Labour
licence, ESIC/WC policy, PF registration, all related registers, etc)
Take necessary work permit before starting the activity
JSA based tool box meeting should be conducted before starting the activity.
Ensure and other lifting tool tackles is in good condition and certified by 3 rd
party
Ensure work should carried out with competent supervision only
Deploy skilled and experienced man power for the task
Ensure / farana movement area levelled and compacted
Road survey to be carried out before starting the activity
operator should have the valid DL and competency letter and should be
medically fit.
Stay away from suspended load
Provide tag line (min- 3m) while material shifting
Ensure before painting the material, material is stable or is in rigid position
and side supports given or not
Barricade the working area to prevent unauthorised entry
While applying sling to material do not keep hand in between material and
sling
While material positioning do not put hand in-between
gap of member
Ensure proper wooden packing/ supports given to material while positioning
Ensure before moving the crane from one place to other place ensure all
electrical cables routed properly (over head and underground)
Keep safe distance from over head electrical cables
Crane will be carried out in the guidance of flag man/ signal man only
While applying guy rope to column do not keep hand in between column and
guy rope
While positioning column over anchor bolt do not
put hand in-between gap of pedestal and column base plate
Ensure proper wooden packing/
supports given to column while positioning
Before applying the guy rope to column on ground level visual inspection to be
done by competent person
Use any cut- chrome leather hand gloves while fixing the guy rope
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity:Anti Termite 15 Document No.: RMK /RA/15
Location: All around site Date:
RISK ASSESMENT
Job/ activity Job steps/ Methods Hazards Identified Risk Involved Control Measures
Safety induction training will be conducted for all workers.
Tool box talk shall be taken before start the work.
Work permit shall be obtained on daily basis.
Mobilization of new wrong practices due Personal injury/
manpower to lack awareness property damage PPE's will be used by all workers (safety helmet, reflective jacket,
safety shoes, hand gloves etc.)
trained workforce shall be deployed for work.
work will be done under proper supervision.
Material Storage at Site
Anti Termite
Treatement
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity: Painting 16
Location: All around site
RISK ASSESMENT
ESMENT
Control Measures
Safety induction training shall be conducted for all workers.
Tool box talk shall be taken before start the work.
Work permit shall be obtained on daily basis.
PPE's will be used by all workers (safety helmet, reflective jacket,
safety shoes, hand gloves, Nose mask etc.)
trained workforce shall be deployed for work.
work will be done under proper supervision.
paint will be stored in separate room & cool place.
Safe method will be followed for handling & shifting.
Spillage will be cleaned immedeately from ground.
Only trained person will allowe for handling & shifting.
no flamable material will stack along with paint.
hot work will not be allowe near paint storage area.
fire extinguisher & fire bucket will be kept near storage room
paint barrel/ can will not be left in open condition.
Hand gloves will be provided for painting work
safety goggel will be used during painting.
dust mask will be issued & monitor its use.
hot work will not be allowe near painting area.
flammable material will be removed from working place.
Crush sand will be provided over the ground / ground will be
covered by palstic paper.
empty barrel will be stored in separate room with lockabe.
barrel will be transfer out from side by contractor.
miss use of barrels will monitor by supervisor.
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity: Roofing & Cladding 17
Location: All around site
RISK ASSESMENT
Crushing injuries,
Crush between Lacerations, Fractures,
Major injuries and
fatality
Electrocution, nerves
Electrocution damage, internal organs
damage and tissue
damage at entry and exit
Roofing &
Clading Work
Electrocution, nerves
Electrocution damage, internal organs
damage and tissue
damage at entry and exit
ESMENT
Control Measures
All statutory compliances to be done before starting the activity at site (Labor
licence, ESIC/WC policy,PF ragistration, all related ragister’s, etc)
Take necessary work permit before starting the activity
JSA based tool box meeting should be conducted before starting the activity.
Material shifting activity should be carried out in day light only
Do not plan activity in heavy wind pressure
Ensure hydra and other lifting tool tackles is in good condition and certified by
3 rd party
Ensure work should be carried out with competent supervision only
Deploy skilled and experianced man power for the task
Ensure all hydra / farana movement area levelled and compacted
Road survey to be carried out before starting th activity
Hydra/farana operator should have the valid DL and competency letter and
should be medically fit.
Stay away from suspended load
Provide tag line (min- 3m lenghth) while material shifting
Barricade the working area to prevent unauthorised entry
While applying sling to material do not keep hand in between material and
sling
While material lifting do not put hand inbetween gap
of two member Ensure proper wooden packing/ supports
given to material while placing on ground
RISK ASSESMENT
ESMENT
Control Measures
Only trained workers will be deployed for work.
Tool-Box talk will be held before start the work on daily basis.
PPE's will be used as per required in job activity.
Only good condition of wheel barrow will be used for material
shifting.
Dust mask & hand gloves will be used during claening work.
workers movement will be done opposite side of wind flow
Only trained person will be allowed to handling & mixing the
chemical.
During the handling & mixing safety goggel, gloves, mask will be
used.
MSDS will be explained to workers enguaged in activity.
Eye wash arrangement will be done at first-aid center at site.
Other workers will not be allowed in this area during the sprinkling
of chemical
safe procedure of chemical handling will be explained to workers.
Training for Chemical handling,storage will be given to workers.
PPE's (Safety helmet, safety shoes, jacket, hand gloves) will be
used as per required in job activity.
Rubber/ PVC hand gloves & gum boot will be used during work.
Empty can/ barrels will be stacked in secured room/ place.
Can/ barrels will be properly disposed out side from site.