JOB SAFETY ANALYSIS

INDEX
SR. NO. TYPE OF ACTIVITY JSA NO.
1 Loading & Unloading RMK/JSA/01
2 Temp. Shed Making RMK/JSA/02
3 Electrical Instalation RMK/JSA/03
4 Excavation RMK/JSA/04
5 GI Sheet Barrication RMK/JSA/05
6 Concrete Work RMK/JSA/06
7 Reinforcement & Shuttering RMK/JSA/07
8 Bar Bending RMK/JSA/08
9 Scaffolding Errection & Dismentaling RMK/JSA/09
10 Column,Slab Shuttering & Pouring RMK/JSA/10
11 Power Tool Operation RMK/JSA/11
12 Masonary & Plaster Work RMK/JSA/12
13 Hot Work RMK/JSA/13
14 Hoisting & Rigging RMK/JSA/14
15 Anti Termite RMK/JSA/15
16 Painting RMK/JSA/16
17 Roofing & Cladding RMK/JSA/17
18 Water Proofing Work RMK/JSA/18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental .
Job/ Activity: Loading-Unloading 1 Document No.: RMK / RA / 01
Location: All around site Date:

RISK ASSESMENT
Job/ activity Job steps/ Methods Hazards Identified Risk Involved Control Measures
Safety induction training will be conducted for all workers.
Tool box talk shall be taken before start the work.
Work permit shall be obtained on daily basis.
Mobilization of new wrong practices due to Personal injury/ property
PPE's will be used by all workers (safety helmet, reflective jacket, safety
manpower lack awareness damage
shoes, hand gloves etc.)
trained workforce shall be deployed for work.
work will be done under proper supervision.
Vehicle can get reverse Personal injury/ property chocker/stopper should be provided to vehicle.
due to slope surface damage ensure that vehicle park at even surface.
cut injury gloves provided to workers whos involve in this activity.
sharp edge of material sling / web belt can sharp edge will be protected / covered by cloth or pad.
damaged cut proof gloves will be provided to specific task.
Material unloading from two person will holding to material during unloading-loading.
Material can unbalance Material damaged /
vehicle/ truck
due to long length personal injury double sling will be provided to loading-unloading of material by hydra.
Proper access will be provided for movement.
Person can fall/ tripp or
access will be maintained clean & without obstacle.
material topple due to Personal injury/ property
guy rope will be provided to material during shifting.
uneven/ improper damage
material shifting will be done by correct method of shifting.
Material Loading- access
unloading & trained workforce shall be deployed for work.
shifting Only Trained work force deploying for unloading Work
Untrained Manpower or Major Injury / Material Fall/
(Manually & Only Trained and expieriance operator having valid liecence to allowed to
Mechanically) operator vehicle toppled
crane operation
Before start using crane or lifting tools satutary compliance complete
Material unloading from ( Form 12, Insurance, Registration record ) to be submitted
vehicle/ truck by using Improper crane or Material fall / sling or belt Checked SWL of crane used for unloading
crane / hydra Lifting tolls damage / Only Inspected crane and Lifting tackles can allowed to used
Before start the work sling / web belt will be checked.
correct size of sling will be used for unloading/ loading.
Sling / web belt can
Material can fall down/
came out from lifting Safety latch to lifting hook will be provided & ensured it is properly working.
personal injury
hook.
Material will be stacked on base which can provide gap between material
& ground.
material stacking at Material can fall down/ material will be stacked up to only 04 feet hieght.
Material stacking
more hieght. personal injury Material will be stacked with sagrigation as per types.
load over the G.I.Sheet will be kept to avoid fying due to air
material will be stacked properly at site & batrricade to it.
Emergency pathway shall be clean,clear & assembly point shall be known
Confusion, panic to every worker.
In case of emergency Fall of person/material
situations
Emergency response plan shall be communicated to all workers.
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity: Temporary shed making 2 Document No.: RMK / RA / 02
Location: All around site Date:

RISK ASSESMENT
Job/ activity Job steps/ Methods Hazards Identified Risk Involved Control Measures
Safety induaction training will be conducted for all workers.
Tool box talk shall be taken before start the work.
wrong practices due to Work permit shall be obtained on daily basis.
Mobilisation of new lack of training/ Personal injury/
manpower knowledge regarding property damage PPE's will be used by all workers (safety helmet, reflective
work. jacket, safety shoes, hand gloves etc.)
trained workforce shall be deployed for work.
work will be done under proper supervision.
All area shall be barricaded with tape
Proper scaffolding & platform (600 mm mimimum) shall be used
Scaffolds may collapse Injury to person / for height work
due to uneven surface property damage Scaffold Erection & dismantling work will be done under
supervision.
Scaffold shall be erected properly leveled base.
Working on height/ Injury to person Proper access shall be provided to work place.
scaffolding Improper Access on
scaffold All scaffold material & other material will be stacked properly at
Slip, Trip hazard
work place & work area shall be kept always clean.
Making of
Temporary Shed Fall Of person from Fixed Lifeline before start activity (18 mm nylon rope )
Personal Injury
by using GI Sheet Height Provide full body harness with double lanyard
one standby person will be attended at the ground to avoid the
Unauthorized person tress passer.
Injury to person
Entry
All area shall be barricaded with tape
proper method of material handling will be used.
Material handling &
personal Injury
shifting. Hand gloves shall be used for material handling & shifting work.

Housekeeping will be done after completion of work at site.


Material handling &
shifting All usable material shall be stacked properly & unusable
GI Sheet may be fly in series Injury / material will be removed from the work place.
air due high wind property loss may
GI Sheet will be tied by binding wire & Kept Weight on it.
pressure. occur.
MS pipe will be used for shed except door & window.
MS pipe will be fixed at bottom & top of the sheet on the roof.
Emergency pathway shall be clean, clear & assembly point shall
Confusion, panic Fall of be known to every worker.
In case of emergency
situations person/material
Confusion, panic Fall of
In case of emergency
situations person/material
Emergency response plan shall be communicated to all workers.
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity: Electrical instalation Document No.: RMK /RA /03
Location: All around site Date:

RISK ASSESMENT

Job/ activity Job steps/ Methods Hazards Identified Risk Involved Control Measures
Safety induaction training will be conducted for all workers.
Tool box talk shall be taken before start the work.
wrong practices due Work permit shall be obtained on daily basis.
Mobilisation of new to lack of training/ Personal injury/
manpower knowledge regarding property damage PPE's will be used by all workers (safety helmet, reflective jacket,
work. safety shoes, hand gloves etc.)
trained workforce shall be deployed for work.
work will be done under proper supervision.
all legal documents of machine will be checked.
Use of fulaty machine
Only inspected machine will be used for work.
Untrained operator person cot in only trained & license holder operator shall be allowed for work
between pocklen
vehicles shall be kept 2 mtr. Away from the edge.
Excavation up to 03 feet machine working near while movement
banks man/supervisor will be provided to give direction during
for fixing electrical poles edge
reverse movement of vehicle
by powered equipments
Barrication will be provided to all pits.
Fall of signage board shall be provided at site.
Electrical work Unbarricatted pits person/material in
pits proper route shall be demarked for vehicle/man movement.
all work shall be done under competent supervisor
skin irritation/ PVC gloves & gum boot will be used while concrete work.
working with cement
inhallation dust mask,PVC gloves will be provided for mixing of concrete.
concrete work for pole
falling of pole due to after concreting support will be provided to pole from all side.
fixing support will be removed next day after confirmation that concrete
absence of external personal injury
is set properly.
support pole will be fixed in concrete up to 03 feet depth.
only trained workforce will be deployed for job.
full body harness will be used for height work
Personal injury/
fall of person M.S. ladder will be provided for height work.
property damage
ladder will be inspected by safety officer
Cable laying in hook on
M.S. Pole is made as ladder for cable laying.
M.S. Pole @ 5 meter cable will be fixed to M.S hook with pvc cover to avoid friction by
cable damage due to wind pressure.
cable will be tied by cable tie.
friction of cable with electric shock
m.s. hook MS pole will be fixed at 20 mtr. Distance top avoid sag in cable.
No work will be done in live cables.
all joints will be given with proper insulating & loopse at joint place.
joints in cable Improper joint in cable electric shock round knot will be provided to avoid self open of joint due to stree/
load.
cable joint will be kept in vertical position & tied by cable tie.
only authorized person (electrician) will be allowed to electrical
work
electrical gloves will be used for working on live equipments /
electric shock due to supply.
electric shock
use of damaged tools
proper insulated tools will be used for electrical work.
all supply will be isolated before start the work.
GI wire use for earthing in earth pit to all panels.
distribution panel will be kept on platform & fixed by anchor
Distribution Panel fastener.
Installation at location
all distribution panel will be covered & protected from rain fall.
all panel will be kept in lock & key at site.
Open panel / rain Ensure that no water lines laying nearby DB Panel.
fall /leackage curing short circuit / fire
pipe near DB panel 30 mA RCCB & 63 mA MCB will be provided to all DB panels.
all connections shall be given through RCCB & MCB.
Electrical work
all cables will be inserted in RCCB & MCB with proper crimpted.
all sockets in DB panel will be covered.
all joints will be given with proper insulating & loopse at joint place.
connections taking to use of damaged cable
Electric shock / pin top will be provided to all connections
power tools/halogen /
machinery lugs will be used for cable joint & proper insulated.
mercury/ construction
damaged cable joint will be not be kept in water/wet place/sharp objects.
machinery correct size of cable / double insulated,03 core & correct size of cable will be used for
cord connections.
electric shock due connections without pin top will not be allowed at site.
to cut of cable by GI all cable will be laying through pvc flexible pipe in site offices.
sheet double insulated 03 core cable will be used for connections.
cable fitting in site cable damage due to
cable tie by binding wcable will be tied by cable tie.
offices. cut by GI sheet
shock due to cable all tube light will be fitted on wooden Patti & then tied on m.s. pipe.
touch with sheet all work shall be done under competent electrician.
Emergency pathway shall be clean,clear & assembly point shall be
Confusion, panic Fall of known to every worker.
In case of emergency
situations person/material
Emergency response plan shall be communicated to all workers.
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity: Excavation 4 Document No.: RMK / RA / 04
Location: All around site Date:

RISK ASSESMENT

Job/ activity Job steps/ Methods Hazards Identified Risk Involved Control Measures
Safety induaction training will be conducted for all workers.
Tool box talk shall be taken before start the work.
wrong practices due Work permit shall be obtained on daily basis before work start.
Mobilisation of new to lack of training/ Personal injury/
manpower knowledge regarding property damage PPE's will be used by all workers (safety helmet, reflective jacket,
work. safety shoes, hand gloves etc.)
trained workforce shall be deployed for work.
work will be done under proper supervision.
All machinery shall be checked at site before start of work as checklist.
Use Of faulty
machinery Training shall be given to all operator for safe driving & operating of
equipment.
Fatality/ Personal Only trained & license holder operator will be allowed for operation.
injury/ property vehicles shall be kept 2 mtr. Away from the excavated pit edge.
Machine can fall in pit
damaged Proper access & adequate space shall be maintained for machine
operation and man movement.
Use of Powered Man-Movement near Area shall be barricaded & flag man, signal man and supervisor shall
equipments machine boom radius be deployed for control unwated entry/ man movement during
(Pocklen,JCB) for area excavation work.
excavation. all debris & material will be removed from area or kept 1.5 mtr away
from the edge.
Fatality/ Personal
side collapsing vehicle movement shall be kept 2 mtr away from excavated pit.
injury
adequate shoring / protection shall be provided where required.
loose material will be removed from the edge of pit.
Shock due to all underground utilities shall be identified isolated before start the
damaged of live work.
Excavation & Underground utilities
cable, Property All PPE's will be provided to workers as per activity.
Backfilling damage Work will be start after only de-enrgized all live ecrtical cables.
Excavation &
Backfilling

vehicle cabin shall be protected by glass.


Breaking of hard rock Flying particles Eye injury safety goggel will be issued to workers which engaged in that activity.
Unathorized person will not be allowed near working area.
vehicles shall be kept 2 mtr. Away from the edge.
Reverse horn (Beep Type) mandatory to vehicle movement.
vehicle movement
closed to edge of pit Signal man and supervisor will be provided to give direction during
reverse movement of vehicle
Hard barrication shall be provided to excavated pits.
Fatality/ Personal signage & caution board shall be provided at site.
Vehicle movement for
injury/ property proper route shall be demarked for vehicle & man movement.
debris shifting Man-Movement near damaged
vehicle movement No person shall be allowed near vehicle movement area.
area
Excavation work and other work will not be allowed on saimantensly

Over loaded debris in No debris material shall be over loaded in vehicle.


vehicle all work shall be done under competent supervisor
Adequate lighting arrangement shall be done in dark hour
inadequate Proper route shall be demarked for vehicle/man movement in dark
illumination in dark hours. (Use of refecter tape for route marking)
hours inadequate
vehicle movement in signal man will be deployed to give direction (by wisal & batten) in dark
illumination in dark
dark hours hours.
hours
Hard barricades will be provided to all pits.
Improper vehicle
all cables shall be overheaded at 06 meter hieght.
route identification
signage & direction board will be provided at site.
All machinery shall be checked at site before start of work.
only trained & license holder operator will be allowed for vehicle
operation
vehicles shall be kept 2 mtr. Away from the edge.
Person cot in
between signal man & supervisor will be provided to give direction during
Backfilling & vehicle/pocklen Personal injury/ reverse movement of vehicle
compaction turning radius/during fatality Hard barrication shall be provided to all pits where depth is more than
Excavation & reverse movement of 03 mtr And soft barrication where depth is less than 03 mtr.
Backfilling vehicle.
signage & cautions board shall be provided at site.
proper route shall be demarked for vehicle/man movement.
all work shall be done under competent supervisor
Emergency pathway shall be clean,clear & assembly point shall be
Confusion, panic Fall of known to every worker.
In case of emergency
situations person/material
Emergency response plan shall be communicated to all workers.
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity: Barrication 5 Document No.: RMK /RA/05
Location: All around site Date:

RISK ASSESMENT
Job/ activity Job steps/ Methods Hazards Identified Risk Involved Control Measures
Safety induaction training will be conducted for all workers.
wrong practices due to Tool box talk shall be taken before start the work.
Mobilisation of new lack of training/ Personal injury/ Work permit shall be obtained on daily basis.
manpower knowledge regarding property damage PPE's will be used by all workers (safety helmet, reflective
work. jacket, safety shoes, hand gloves etc.)
trained workforce shall be deployed for work.
work will be done under proper supervision.
Faulty hand tools
Safety Shoes, handgloves, Nose mask Shall be Provide to
used/ sharp edges of
workers
Manual Excavation tools injury to person
underground utilities/
all underground utilities shall be checked & disconnected.
Barrcation by GI live cable
Sheet to work Handling of material &
area ( Height Up Cotton gloves will be provided for GI sheet handling.
GI sheet Cut injury
To 20 Feet) Area shall be barricated.
Only trained person shall be deployed for work
fall of Material/tools
Work done under proper supervision
Personal injury/
Working at height Unauthorised person not allowed in work area
property damage
Full Body Harness shall be provide to workers
Fall of person from
Area shall be barricated.
height
Proper Working platform shall be provided
Emergency pathway shall be clean,clear & assembly point
Confusion, panic Fall of shall be known to every worker.
In case of emergency
situations person/material Emergency response plan shall be communicated to all
workers.
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity: Concrete work 6 Document No.: RMK /RA/06
Location: All around site Date:

RISK ASSESMENT

Job/ activity Job steps/ Methods Hazards Identified Risk Involved Control Measures
Safety induaction training will be conducted for all workers.
wrong practices due Tool box talk shall be taken before start the work.
Mobilisation of new to lack of training/ Personal injury/ Work permit shall be obtained on daily basis before work start.
manpower knowledge regarding property damage PPE's will be used by all workers (safety helmet, reflective jacket,
work. safety shoes, hand gloves etc.)
trained workforce shall be deployed for work.
work will be done under proper supervision.
Nose mask, Gum Boot, Safety goggel, PVC gloves shall be provided
Cement, crush sand Flying dust particles Skin irritation,
for working with cement, crush sand
loading in Hopper inhalation
Chemical in cement Adequate ventilation shall be provided at work place.
Nose mask, Gum Boot, Safety goggel, PVC gloves shall be provided
Fumes, chemical in for working with cement, crush sand
concrete
work will be done under proper supervision.
Proper access shall be provided in pit.
Personal injury due
Ladder / steps shall be used for access.
Improper access in pit to fall in pit
Ladder shall be tied at top & bottom to avoid slip.
No material shall be hold in hand during climbing on ladder.
Concrete in Excavated
Open/ unbarricated All pits shall be hard barricated & cuation board shall be displayed in
Concrete work pit
pit local language.
Vehicle movement shall be allowed 1.5 meter away from the edge of
pit.
Vehicle movement Fatality/ property
Reverse horn shall be ensured during reverse movement of vehicle.
near edge of pit damage
Banks man shall be deployed for direction in case absence of reverse
horn.
Only inspected scaffolding shall be used for height work.
Proper platform shall be provided for height work.
MS jalli shall be provided & tied at both end.
Improper scaffolding,
Defective jalli shall not be used for platform.
platform & access
Proper access shall be provided on scaffold at 500 mm distance
bracing/ ladder will be provided for access.
Ladder shall be tied at top & bottom to avoid slip.
Concrete work at Fatality/ property
Material holding in No material shall be hold in hand during climbing on ladder.
height damage
hand during Rope with bag shall be provided for material shaifting at height near
movement on ladder each ladder
Concrete work at Fatality/ property
height damage

Full body harness shall be provided with double snap hook.

Fall of person / fall of


material

Concrete work
height damage

Proper railing (Top, Mid) shall be provided at platform.


Fall of person / fall of
Safety net shall be provided for fall protection where is needed.
material
Underneath area shall be barricated & no work shall be allow at
underneath area.
Proper joint in cable shall be provided with loop.
Fatality/ personal All electrical cable shall be doubdle insulated.
Improper cable joint/
injury due to
insulation All cables shall be overheaded & tied with cable tie.
Electric shock
Supply for vibrator machine shall be taken from RCCB of 30 mA.
Use of electric vibrator Vibrator shall be inspected by electrician & mechanic before taken in
for concrete setteling use.
Fualty machine
Property damaged/ Ensure all rotating parts shall be properly guarded.
personal injury On-Off switch must be in working condition.
Damaged hose of No damaged hose shall be used for work.
vibrator ensure hose & needle are in healthy condition.
All hydrulic hoses shall be inspected & ensured in good condition.
Damaged houdrulic
Pump shall be kept on even surface & wooden pad shall be provided
hoses/ unguarded Personal injury
below short legging.
rotating parts
All rotating parts shall be fully guarded.
Concrete work Only trained operatior shall be allow for operation.
Operation by Pump shall be protect from unauthorised operation.
Personal injury/
untrained/
property damage After completion of work, pump shall be covered & engine put in Off
Use of concrete pump unauthorised person
mode.
for concreting
Adequate support shall be provided to pipe line.
Improper supporting Proper stand shall be used for pipe line laying & cross wooden chavi /
to pipe line pipe shall be provided in MS stand to avoid slipping.
Personal injury/
No person shall be allow over crossing of pipe line.
property damage
Only designed clamp shall be used for pipe line connecting.
Improper clamping to
High presuure clamp shall be used for hopper end.
pipe line
Emergency switch shall be maintained free from obstruction.
All cables shall be overheaded & tied with cable tie.
Inadequate access
Adequate illumination shall be provided at work place & pathway.
Concrete work in dark Access shall be maintained neat & clean.
Personal injury
hours Emergency exit shall be illuminated in dark hours.
improper access
Work shall be done under supervison.
Emergency vehicle shall be available till completion of work.
Emergency pathway shall be clean,clear & assembly point shall be
Confusion, panic Fall of known to every worker.
In case of emergency
situations person/material
Emergency response plan shall be communicated to all workers.
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity: Reinforcement 7 Document No.: RMK / RA /07
Location: All around site Date:

RISK ASSESMENT

Job/ Activity Job Steps Type Of Hazard Risk Involved Risk Control measures
Safety induaction training will be conducted for all workers.
wrong practices Tool box talk shall be taken before start the work.
Mobilisation of due to lack of Personal injury/ Work permit shall be obtained on daily basis before work start.
new manpower training/ knowledge property damage PPE's will be used by all workers (safety helmet, reflective jacket, safety shoes, hand gloves
regarding work. etc.)
trained workforce shall be deployed for work.
work will be done under proper supervision.
P U Coated hand gloves shall beprovided for bar handling & shifting.
Sharp edges
Reinforcement Shouldar pad shall be provided for steel shifting manually.
Cut injury
shifting at location Proper access shall be provided in yard for material shifting.
Improper access
Pathway shall be maintained always neat & clean.
Proper stacking of ring shall be done.
stacking of steel Personal injury/
Fall of ring Ring shall be stacked in vertical pipe of scaffolding.
ring on platform property damage
No excess ring shall be stacked over platform
Only inspected scaffolding shall be used for height work.
Proper platform shall be provided for height work.
Improper MS jalli shall be provided & tied at both end.
scaffolding, Defective jalli shall not be used for platform.
platform & access Proper access shall be provided on scaffold at 500 mm distance bracing/ ladder will be
provided for access.
Ladder shall be tied at top & bottom to avoid slip.
Reinforcement Fatality/ property
Material holding in damage
work hand during
Reinforcement No material shall be hold in hand during climbing on ladder.
work at Ground & movement on
ladder Rope with bag shall be provided for material shaifting at height near each ladder
height
Full body harness shall be provided with double snap hook.
Fall of person / fall Proper railing (Top, Mid) shall be provided at platform.
of material Safety net shall be provided for fall protection where is needed.
Underneath area shall be barricated & no work shall be allow at underneath area.
Nylon rope shall be provided for material lifting at height.
Material lifting at Rope shall be check before start lifting work, damaged rope shall not be used for lifting.
height No person shall be allow at ground during material lifting.
Underneath area shall be barricated & no work shall be allow at underneath area.
All cables shall be overheaded & tied with cable tie.
Inadequate access
Adequate illumination shall be provided at work place & pathway.
Reinforcement Access shall be maintained neat & clean.
work in dark Personal injury
hours Emergency exit shall be illuminated in dark hours.
improper access
Work shall be done under supervison.
Emergency vehicle shall be available till completion of work.

In case of Confusion, panic Fall of Emergency pathway shall be clean,clear & assembly point shall be known to every worker.
emergency situations person/material
Emergency response plan shall be communicated to all workers.
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity: Bar Bendng 8 Document No.: RMK /RA/08
Location: All around site Date:

RISK ASSESMENT

Job/ Activity Job steps Type Of Hazard Risk Involved Risk Control measures
Safety induaction training will be conducted for all workers.
Tool box talk shall be taken before start the work.
wrong practices due to Work permit shall be obtained on daily basis before work start.
Mobilisation of lack of training/ Personal injury/
new manpower knowledge regarding property damage PPE's will be used by all workers (safety helmet, reflective jacket, safety shoes, hand gloves
work. etc.)
trained workforce shall be deployed for work.
work will be done under proper supervision.
Packing MS strip shall be removed from steel bundle or sharp edge shall be bend down.
No person shall be allow walking over steel bundle in yard.
Sharp edge of packing
Bar shifting at MS strip/ bar Cut injury Steel bar shall be pull from end of the bar.
cutting machine P U Coated hand gloves shall beprovided for bar handling & shifting.
(Manually) Shouldar pad shall be provided for steel shifting manually.
Trip/ Slip due to Proper access shall be provided in yard for material shifting.
Personal injury
Improper access Pathway shall be maintained always neat & clean.
Double insulated cable shall be provided for cutting machine.
Uninsulated cable/ Cable shall be overheaded & joint properly insulated.
Joint/ Improper Proper earthing shall be provided to cutting machine.
earthing/ Fatality due to
Supply to machine shall be taken from DB panel having 30 mA RCCB/ELCB.
electric shock
On-Off switch of machine shall be in working condition.
Machine shall be taken in use after inspection of mechanic & electric department.
Fualty machine
No fualty machine shall not be used.
Unguarded rotating All rotating parts shall be properly guarded.
parts Locking system to blade & guard shall be provided to machine.
Bar Bending &
Job clamp shall be provided to machine.
Cutting work Personal injury
Bar cutting & Improper blade/ blade Proper rating of RPM of blade shall be used.
bending by fitting/ job clamp Spanner & proper tools shall be used for blade fitting.
cutting machine Damaged blade shall not be taken in use, scrap blade shall be properly stacked.
& bending
Only trained person shall be allow for machine operation.
machine Untrained operator
Training shall be provided to operator regurarly.
Eye injury/ Safety goggel & nose mask shall be provided to opeerator.
damage of ear Ear plug shall be provided to reduce noise level.
Flying partcile/ High drum/ Inhalation Adequate ventilation shall be provided at work place.
noise/ Fumes All combustible material shall be removed regularly.

Fire
Flying partcile/ High
noise/ Fumes
Fire extinguisher & buckets shall be provided near machine area.
Fire
Housekeeping shall be maintained in steel yard.
Oil spillage Oil spillage shall be clean immedetaley.
Improper pins of limit Standard locking pins shall be provided.
switch Only trained person shall be allow for machine operation.
All cables shall be overheaded & tied with cable tie.
Inadequate access
Adequate illumination shall be provided at work place & pathway.
work in dark Access shall be maintained neat & clean.
Personal injury
hours Emergency exit shall be illuminated in dark hours.
improper access
Work shall be done under supervison.
Emergency vehicle shall be available till completion of work.

In case of Confusion, panic Fall of Emergency pathway shall be clean,clear & assembly point shall be known to every worker.
emergency situations person/material
Emergency response plan shall be communicated to all workers.
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity:Scaffolding 9 Document No.: RMK / RA /09
Location: All around site Date:

RISK ASSESMENT

Job/ Activity Job steps Type Of Hazard Risk Involved Risk Control measures
Safety induaction training will be conducted for all workers.
Tool box talk shall be taken before start the work.
wrong practices due Work permit shall be obtained on daily basis before work start.
Mobilisation of to lack of training/ Personal injury/
new manpower knowledge property damage PPE's will be used by all workers (safety helmet, reflective jacket, safety shoes, hand gloves
regarding work. etc.)
trained workforce shall be deployed for work.
work will be done under proper supervision.
P U Coated hand gloves shall beprovided for bar handling & shifting.
Material shifting Sharp edges Cut injury/Fall of Shouldar pad shall be provided for steel shifting manually.
from yard to wark person / Fall of
place material Proper access shall be provided in yard for material shifting.
Improper access
Pathway shall be maintained always neat & clean.
Scaffold may tilt & Scaffold shall be erect on even surface otherwise jack shall be provided for leveling.
fall down due to Base plate shall be provided to each vertical pipe of scaffold at base.
Uneven surface All material shall be inspect before start erection.
Scaffold Damaged/ Bent Bent / damaged material shall not be used for scaffolding erection.
Personal injury/
Erection & Scaffold erection material used for Only trained rigger will be deployed for scaffold erection.
property damage
dismantling erection Scaffold erection work shall be done under strict supervision.
Inadequate Adequate supports shall be provided to scaffolding.
supporting to Height ration shall be maintained in scaffolding during erection.
scaffold Proper cross support & bracing shall be provided to scaffolding.
Only inspected scaffolding shall be used for height work.
Proper platform shall be provided for height work.
Improper
MS jalli shall be provided & tied at both end.
scaffolding, platform
& access Defective jalli shall not be used for platform.
Proper access shall be provided on scaffold at 500 mm distance bracing/ ladder will be
Scaffold erection provided for access.
at height Fatality/ property Otherwise Ladder shall be provided and tied at top & bottom to avoid slip.
Material holding in damage
hand during
movement on ladder
Scaffold erection
at height Fatality/ property
Material holding in damage
hand during No material shall be hold in hand during climbing on ladder.
movement on ladder Rope with bag shall be provided for material shaifting at height near each ladder
Full body harness shall be provided with double snap hook.
Fall of person / fall Proper railing (Top, Mid) shall be provided at platform.
of material Safety net shall be provided for fall protection where is needed.
Underneath area shall be barricated & no work shall be allow at underneath area.
Scaffold erection Nylon rope shall be provided for material lifting at height.
at height Material lifting at Personal injury/ Rope shall be check before start lifting work, damaged rope shall not be used for lifting.
height property damage No person shall be allow at ground during material lifting.
Underneath area shall be barricated & no work shall be allow at underneath area.
If scaffold damaged then first scaffold shall be repaired & made safe for dismantling.
Damaged scaffold
Only trained rigger will be deployed for scaffold dismantling.
Material shifting Material shall be shift by using nylon rope from height to ground.
scaffold from height No material shall be allow to throw from height.
Personal injury/
dismanteling at Scaffold Scaffold shall be dimantle as per row wise.
Scaffold property damage
ground & height dismanteling in Before proceed to next row, the entire components are removed.
Erection & unsafe manner
dismantling scaffold dismantling work shall be done under supervison.
Manmovement Underneath area shall be barricated & no work shall be allow at underneath area.
underneath area Standby person shall be deployed at underneath area & cuation board shall be dispalyed
All cables shall be overheaded & tied with cable tie.
Inadequate access
scaffold erection Adequate illumination shall be provided at work place & pathway.
& dismanteling Access shall be maintained neat & clean.
Personal injury
work in dark Emergency exit shall be illuminated in dark hours.
hours improper access
Work shall be done under supervison.
Emergency vehicle shall be available till completion of work.

In case of Confusion, panic Fall of Emergency pathway shall be clean,clear & assembly point shall be known to every worker.
emergency situations person/material
Emergency response plan shall be communicated to all workers.
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity: Column & Slab 10 Document No.: RMK / RA /10
Location: All around site Date:

RISK ASSESMENT

Sr. No. Activity Name Type Of Hazard Risk Involved Risk Control measures
10 Daily Work permit to be taken before starting the work
Tool box Talk shall be held before start of activities.
Use of proper PPE's as per activity (reflective jacket,safety Helmet , Hand Gloves,
Safety Goggles, Safety Shoes, etc.)
Work will be done under supervision
Trip hazard Severe Human Injury. Proper housekeeping should be maintained
All Shuttering material shuld be Stack Properly
Slip /Fall of man &
Injury to person Proper working platform should be provided
material
Work area should be barricaded.
Handgloves shall be provided
Improper handling of
Cut injury Projecting iron bar should be caped at the top or should be bended.
Reinforcement reinfocement bars
Awarness Shall be given by Daily TBT to use Hand gloves while handling material.
erection up to 4 mt
Opening in reinforcement Shutrring ply shall be provided to move on Reinforcement cage. Erect proper scaffold
Height For Coloumn Fall of person
bars on leveled base & should inspect before use
& Slab
Work On height for tieing Proper Working platform should be provided.
reinfocement bar & Full Body Harness with duoble lanyard should be provided.
shuttring plywood Anchorage poine should be defined for anchoring belt.
Fall Person From Height
Hard barrication shall be provided.
Instruction to be given for proper handling of material.
Proper housekeeping should be maintained.
Area Should be barricaded & unauthorised entry restricted.
Shuttering material should be lifting as method.
Fall of shuttering plywood Injury/property damage
While lifting material person should not be present below.
Include proper handling of ply in tool box talk.
Sharp Edges of shuttering Cut injury Inspect shuttering plates, do not use damaged plates. Use of handgloves shall be
plywood monitored.
Improper stacking of Personnel injury / fatal/trip Proper housekeeping shall be maitained. Stacking of material will be done in an
shuttering plywood. /fall isolated area.
Sharp protruding prop injury to person Cover top of the reinforcement bars to avoid protruding points
supprot
Sharp points of Personnel injury Shaarp edges of reinforcement should be bend / protection provided
shuttring around reinforcement bars
reinforcement bars.
shuttring around
reinforcement bars. Nail Piercing Injury to person Loose nail should be removed from site .
Work shall be carried out by competent person under proper supervision of foremen /
incharge.
Improper scaffold Fall of person All scaffold shall be erected as per approved scheme.
Scaffold shall be inspected by responsible person every day
Tag indicating scaffold status shall be attahced to scaffold
In dark period proper illumination should be provided.
Injury to person
Improper illumination All electrical cable joint should properly insulated.
during dark hours
Electrical Shock
ELCB should be provided to Electrical Distrubution Pannel.
All cable should be above ground supported on MS poles at a height of 2.1m.
Sharp Edges of Chute Hand gloves Should be provide for handling chute and ensure use of hand gloves
Cut injury
during handling.
Improper Housekeeping Injury to person Proper housekeeping should be maintained.
Concreting using Fall of vehicle ot Route should be demark for vehicle movement properly. Deploy Banks man to give
Tranjt Mixer Machine Excavated pits signals to vehicles.
Improper Road for Vehicle
Vehicle Movement shuold be 1 mtr away from Excavation pits.
Movement
Only Expierianced, Trained & Liecence holder Driver Should be deployed
All Legal Document of vehicle should be checked by safety officer.
Damaged insulation of All electrical cable joint should properly insulated.
Wire
Use of Vibrator for Route Electrical cable at height of 2.1 meter.
Shock
concrete settling All equipment should have industrial plugs.
Proper housekeeping shall be maintained at work areas.
All material shall be stacked properly away from edges of excavation.
Use of damaged machine Machinery / Vehicles to be checked before use.
Injury to Person

Slab Edge Should be brricated by using nylon rope before start work.
Working Near Slab Edge Person fall
Training shuld Shuold be given To worker about working near slab edge.
Slab Concreting using Full Body Harness with duoble lanyard should be provided.
concrete pump only traine person should be deployed.
Pipeline Fixing Fall of Pipe Nylon Rope Should Be provided to lifting pipe
proper support should be provided for resting pipe line on slab.
Proper Acssess Ladder Should be provided for slab
Ladder Should be Inspect before Used
Injury to person / fall of
Improper Acssess Ladder Should be fixed at top
person
Hand rail should be provided to ladded
Ladder Should not be lees than th reach point
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity: Power tools 11 Document No.: RMK /RA/11
Location: All around site Date:

RISK ASSESMENT
Job/ activity Job steps/ Methods Hazards Identified Risk Involved Control Measures
Safety induction training shall be conducted for all workers.
Tool box talk shall be taken before start the work.
wrong practices due to Work permit shall be obtained on daily basis.
lack of training/ Personal injury/
knowledge regarding property damage PPE's will be used by all workers (safety helmet, reflective jacket,
work. safety shoes, hand gloves etc.)
trained workforce shall be deployed for work.
work will be done under proper supervision.
Only Inspected tools will be used for work.
Power Tools will be checked by mechanic & Electrician before
Use of Fualty/ Damaged issued for use.
power tools Personal Injury/ Cut Body of tools shall be ensured in good condition.
of body part
Damaged tools will be not used for work.
All rotating parts of tools will be guarded.
Unguarded rotating parts
It will be ensured by supervisor before start work.
Working on Double insulated cable wil be provided to all power tools.
Use of Portable power
portable power tools at site. Proper cable joint will be provided with insulated.
tools Improper joint in cable Shock Cable will be overheaded at min 06 feet height.
Supply will be taken from DP panel having 30 mA RCCB.
Cable will be checked before start the work.
Fying particles/ Dust & Eye injury/ Safety goggel & nose mask will be used.
fumes Inhallation PPE's will be ensured by responsible supervisor.
Correct size of blade/ wheel will be used for tools.
Incorrect wheel/ blade
RPM of tools & blade will be chekced before used.
used to rotating tools
Cut of body part Blade/ wheel RPM will be ensured that more than tools.
Improper fitting of blade/ Proper fitting of blade will be ensured by mechanic.
wheel Only defined key & tools will be used for fitting.
safe access will be provided at work place.
Access will be maintained without any obstructions.
Improper access at
Injury to person Ladder will be provided to aproach at height.
ground & height
ladder will be fixed at 75 degree angle & tied at top & bottom
Inspected ladder will be only used.
Open edges near work All open edges will be barricated.
Fall of person
place Safety belt will be used to work near edges.
proper scaffolding & platform will be provided for height work.
proper access will be provided on scaffold.
Improper scaffold &
Working on Injury to person full body harness with double lanyard (Up to 06 meter) & shock
Use of Portable power platform
portable power absorber(Above 06 meter) will be used for height work.
tools
tools Inspected Scaffolding will be only used.
All flammable material will be removed from work area.
Fire due to Spatter Fire watcher will be deployed till completion of work.
Injury to person /
generating during Fire extinguisher will be kept near work. Area.
Property damage
operation Adequate water arrangment will be done.
Housekeeping will be done after completion of work.
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity:Masonary & Plaster 12 Document No.: RMK /RA/12
Location: All around site Date:

RISK ASSESMENT

Job/ activity Job steps/ Methods Hazards Identified Risk Involved Control Measures
Safety induction training shall be conducted for all workers.
Tool box talk shall be taken before start the work.
wrong practices due to Work permit shall be obtained on daily basis.
lack of training/ Personal injury/
Deploying new workforce PPE's will be used by all workers (safety helmet, reflective jacket,
knowledge regarding property damage
work. safety shoes, hand gloves etc.)
trained workforce shall be deployed for work.
work will be done under proper supervision.
Heavy concrete block
Rough surface of block cut injury to hand cotton gloves shall be used for handling of block.
handling

masonory & plaster work work with cement PVC gloves shall be used for work.

Fall/ tripp hazard due to Adequate illumination shall be provided at work place.
Block Work in dark hours Injury to person
Masonory & Inadequate illumination All electrical cable shall be laid on height.
Plaster work
use of damaged Full body harness should be provided with double lanyard.
harness full body harness should be checked before use on daily basis.
serious injury to proper access should be provided.
person Proper scaffold & ladder should be used.
Improper access/ scaffold
scaffold & ladder should be inspected by supervisor.
Masonory & plaster work proper anchorage point to be provided to anchoring belt.
at height no person will be allowed to stand below work area.
ground area should be barricated & one stand by person kept
unwanted person/ Injury to person/ where height work is carried out.
vehicle entry property damaged No vecichle shall be allowed below work area.
caution board 'Height work in progress' should be displayed at
work place.
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity: Hot Work 13 Document No.: RMK /RA/13
Location: All around site Date:

RISK ASSESMENT

Job/ activity Job steps/ Methods Hazards Identified Risk Involved Control
Gas cylinders should be carried Measures
by trolley only.
Gas cylinders should be tied with chain separately from trolley.
Damage of Gas cutting Fire and explosion Do not keep loose cylinders in hands.
set during handling. Neck guard will be fixed with cylinders all the time.
Do not handle the gas cutting set by pipes for handling.

Oxygen & DA cylinders should be kept separately at the distance of


minimum three meters.
Handling & Storage of gas There should be clear demarcation of empty & full cylinders.
cutting set at required Check with soap water for leakage periodically.
location. Protect the cylinders from direct sun light.
Storage of cylinders. Fire and explosion There should not be storage of any flammable material near gas cylinders
stacking.
Provide board of No Smoking near gas cylinders stacking.
Gas cylinders should be kept up right.
Store gas cylinder away from the heat source.

Assess Work Area For Trip, Slip and


Fall Hazards Such As Fallen
Assess Work Trip, Slip & Fall Fractures, Injuries Branches, Debris On Ground,
Area Exposed Nails. Remove or Highlight
With Traffic Cone. Refer To Job Aid
On Fall Prevention.

Gas Cutting Work


All inflammable material should be removed from near by area.
Use basic PPE's, Hand gloves, Apron, Leg guard, Chine guard, Cutting
Gas Cutting Work goggles etc.
Fire extinguisher/Sand bucket should be provided at working area.
Explosion, burns and Ensure there should not be any flammable material kept near by.
Fire hazard fatality Put off if torch is not in use.
Spark lighter to be use only for ignition.
Operator should remove the hisg visibility jacket before use og gas cutting
set.

Heat Radiation Stress, fatigue Wear the required PPE (Long Sleeve Coverall, apron, safetyGoggle etc)

Gas cutting. Falling Sparks / Hot bids Enclose the work location through barricading
- if hieght at work Burns, injury Ensure no one is working below the location of gas cut

Only NM cutting set to be use.


Hoses of the cylinders should be in well condition.
Flash back arrester provided on both ends of hose pipe.
Explosion or burst of gas Burns, fatality Only certified person will operate the gas cutting set.
cutting pipe/cylinders First open the torch valve then open cylinder valve.
Opener should be use to open the valve from cylinders.

Use Safety goggle for protection Against Liquid and Chemical Splashes
Cartridge type respirators to be used perform the task
Fall of spatter while
working on height Minor and major inju
Minimise human expose to paint/ thinner

1.Take necessary work permit before starting the activity.


2.Ensure the proper ground & road condition .

3. Ensure presence fire extiguisher

4. provide appropriate PPE's to workers


Pinch points, Damage
Shifting the Welding 5.. Presence of supervisor
of welding machine Major injury, slip
Machine to the required
while shifting,Material disc, backpain
location from the store. 6. Visual inspection of welding machine before starting the activity.
handling
7. Ensure color coding of cables connected to the welding machine.
8.
Welding machine should be operated by authorized person only.

9.Skilled manpower should be deplotedtoperform the task


10.Use of PPE's.
Always carry the welding machine with the help of 2 persons .
1. Ensure there should not be any flammable material kept within 10mts
range. 2.Remove the all
combustable material from the welding area
3.Welder should remove his visibility jacket & Use basic PPE's(Face shield
with helmet leather Hand gloves, Apron) before starting the activity.
• Fire 4. Ensure fire extinguisher / sand bucket available at working location .
5. All the welding equipments are fitted with the 30milli amp ELCB'S.
• Slips Major (Burn) injury, Use mechanical aids, get help, use correct lifting technique
• Trips Falls Fatal 6 Make sure work area is clean, dry and clear of flammable liquids and
• Other people materials
• Fumes 7. Locate power leads to prevent damage or injury
8.Clear area of unauthorized personal within 10 m
9.Provide screens to prevent welding flashes
10.Locate welder in unsuitable position as good ventilation is essential

1.All electrical connection should be done by authorised electrician only

2.Ensure the all electrical equipments are free from any defects
Welding Work 3.Ensure the all electrical tool / connection cables in good
condition and through ELCB (30mA).
4. Provide seperate ELCB to welding machine
Electrocution, 5.All the electric wire joints should be made using industrial sockets only.
nerves damage,
Electrocution internal organs 6.Do not any electrical work during rainy conditions
damage 7.Rout all electrical cables above
Welding at the required the ground
locations of the washer 8.All electrical cables protected from sharp edges
plates. 9. All power connections to be disconnected when not in use

1.Use proper PPE's during activity( welding shield with helmet, welding
appron, hand sleeve, leg guard, rubber shoe etc.)
Direct contact with UV Eye injury, 2.Proper clothing to be used while performing activity
lights skin irritation 3.Reduce the duration of exposer to UV lights with regular intervals
4.Ensure autherised person only perform the task
Ensure the welding machine is in good condition before use
1. Tag defective equipment so it cannot be used before it is repaired
2• Check leads for damage
3• DO NOT use damaged leads or connection
4• Check for defective electrode holders and guns, insulation damage,
overheating or suspected defects
5• Clean all contact surfaces and equipment
Faulty Equpment. 6• Check and tighten all external connections daily
Dirty Equpment. 7• Ensure earth leads are secure
Loose Connections. shocks,Coma,fatal,
8• Clothing and welding gloves need to be dry and gloves free from
Faulty PPE'S holes
9• Safety boots should have rubber soles

Inhalation and 1.Use filter mask while performin g the activity


breathing 2.Reduce the duration of exposer to fums and vapors with regular
Fumes and vapors problems, damage intervals
of body internal 3.Ensure autherised person only perform the task
organs
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity : Hoisting & Rigging 14
Location: All around site

RISK ASSESMENT

Job/ activity Job steps/ Methods Hazards Identified Risk Involved

Head injury, major injury


1.Hit by material to worker

2.Pinch points Injury to finger, crushing

Material shifting to its


location with the help of
crane

3.Crush between Major injury


4.Topple of farana Major injury to operator/
worker

5.Failure of sling Major injury, fatal,


property damage

1.Crane will struck due to Collision of vehicle,


sludgy condition of road/ injuries and damage of
uncompacted ground property
surface

Major Injuries, fractures,


2. Crush in between fatality and machinery
damage

Crane positioning at the


abreaction location

3.Hit to object / person Major injuries, fatal

Electrocution, nerves
4.Electrical hazard damage and interanal
organs damage, tissue
damage at entry and exit
Hoisting & Rigging

Lifting and placing the


column over anchor bolt top
with the help of crane (SWL
50 ton, member weight max.
05 ton, length- 09 m, width Major Injuries, fractures,
5M) 1. Hit by member fatality
(Portal frame will be lifted
wire rope sling with d
shackel)
2.Pinch points Injury to finger, crushing

3.Fall of material from Head Injury, fractures


height and fatal

4.Failure of sling/crane Major injury, fatal,


property damage

Major Injuries, fractures,


5. Crush in between fatality and machinery
damage

Bolting with main frame 1. Fall of person from Collision of vehicle,


column and anchor bolts height injuries and damage of
property

2. Fall of material from Head Injury, fractures


height and fatal
3.Topple of boom lift Major Injuries, fatal

4.Pinch points Injury to finger, crushing

5.Cut/scratches due to Laceration, abrasions


broken wires of guy rope and property damage
STRUCTURE PVT LTD .

Document No.: RMK /JSA/09


Date:

ESMENT

Control Measures

All statutory compliances to be done before starting the activity at site (Labour
licence, ESIC/WC policy, PF registration, all related registers, etc)
Take necessary work permit before starting the activity
JSA based tool box meeting should be conducted before starting the activity.
Ensure and other lifting tool tackles is in good condition and certified by 3 rd
party
Ensure work should carried out with competent supervision only
Deploy skilled and experienced man power for the task
Ensure / farana movement area levelled and compacted
Road survey to be carried out before starting the activity

operator should have the valid DL and competency letter and should be
medically fit.
Stay away from suspended load
Provide tag line (min- 3m) while material shifting
Ensure before painting the material, material is stable or is in rigid position
and side supports given or not
Barricade the working area to prevent unauthorised entry

While applying sling to material do not keep hand in between material and
sling
While material positioning do not put hand in-between
gap of member
Ensure proper wooden packing/ supports given to material while positioning

Ensure there is sufficient clear space for / F-15 movement


Ensure while operating the /f-15, operator’s vision is clear
Ensure signal man is in safe place while movement
Ensure there is sufficient space between two stacks
Ensure before lifting adjacent material is stable or is in rigid position
Ensure after
shifting the material adjacent material is in stable condition
Barricade the working area to prevent unauthorised entry
Inspect / farana before starting the activity
Ensure all vehicle (/farana) movement area levelled and compacted
Before starting the activity road survey to be carried out
Ensure all vehicle equipment should be operated by authorised person only
nobody permitted
in operator cabin excluding operator

All lifting tool/ tackles to be inspected by competent person before taking in


use Ensure
all tool/ tackle free from any type of damage e
Ensure all / farana / crane movement area levelled and compacted, to avoided
any type of sudden jerk while movement
Provide rubber packing in between material and sling to avoided damage to
sling Ensure
column weight not exceeding the SWL of sling

Ensure all crane movement area should be levelled and compacted


Road survey to be carried out before starting the activity
Avoided water logging on road

Ensure there is sufficient clear space for crane movement


Ensure while operating the crane operator’s vision is clear
Ensure signal man is in safe place while crane movement position and side
supports given or not
Barricade the working area to prevent unauthorised entry

Crane positioning activity should be carried out in day light only


Ensure all / farana / crane movement area levelled and compacted
Road survey to be carried out before starting the activity
Crane will be carried out in the guidance of flag man/ signal man only

Barricade the working area to prevent unauthorised entry

Ensure before moving the crane from one place to other place ensure all
electrical cables routed properly (over head and underground)
Keep safe distance from over head electrical cables
Crane will be carried out in the guidance of flag man/ signal man only

Column erection activity should be going on according to lifting plan only


Column erection activity should be carried out in day light only
Do not plan column erection activity in heavy wind pressure Ensure
all / farana / crane movement area levelled and compacted Road survey
to be carried out before starting the activity Stay away from
suspended load
Provide tag line (min- 3m) while material shifting
Barricade the working area to prevent unauthorised entry
While applying sling to material do not keep hand in between material and
sling
While material positioning do not put hand in-between
gap of member Ensure proper wooden packing/ supports given to
material while positioning

Do not keep any loose material on height Ensure all


hand tools tied properly, hand tool tie off system to be implemented
Erection area to be barricaded to restrict unauthorised entry Provide
sign boards should be provided Deploy skilled
and experienced manpower to perform the height work task

All lifting tool/ tackles to be inspected by competent person before taking in


use Ensure
all tool/ tackle free from any type of damage Ensure all /
farana / crane movement area levelled and compacted, to avoided any type of
sudden jerk while movement Provide rubber packing in
between material and sling to avoided damage to sling
Ensure column weight not exceeding the
SWL of sling

Ensure there is sufficient clear space for swing / movement of crane


Ensure while operating the crane operators vision is clear
Ensure signal man is in safe place while crane movement
Barricade the working area to prevent unauthorised entry

Fall protection to be provided to working at height , workers should be trained


for proper use of full body harness with double lanyard and energy absorber
Workmen will anchor full
body safety harness to boom lift bucket Ensure 100% full body harness
anchorage Deploy skilled
and experienced manpower for the task, workers are trained for working at
height Ensure workers are
physically/medically fit for height work
Ensure all boom lift movement area levelled and compacted to avoided
sudden jerk during operation
LOTO procedure to be followed for all vehicles/equipments for avoided the
unauthorised operation

Do not keep any loose material on height Use


only 12 mm dia wire rope for tie the column Ensure
before deslinging all ( two) guy rope are fixed properly with rigid structure or
peg angle to give stability to erected column
Ensure all ‘U’ clamp are tightened properly
Ensure all hand tools tied properly, hand tool tie
off system to be implemented
Erection area to be barricaded to restrict unauthorised entry
Provide sign boards should be provided Deploy
skilled and experienced manpower to perform the height work task
Inspect boom lift before starting the activity Ensure
all boom lift movement area levelled and compacted Before starting
the activity road survey to be carried out Ensure all vehicle
equipment should be operated by authorised person only
Nobody permitted in operator cabin
excluding operator

While applying guy rope to column do not keep hand in between column and
guy rope
While positioning column over anchor bolt do not
put hand in-between gap of pedestal and column base plate
Ensure proper wooden packing/
supports given to column while positioning

Before applying the guy rope to column on ground level visual inspection to be
done by competent person
Use any cut- chrome leather hand gloves while fixing the guy rope
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity:Anti Termite 15 Document No.: RMK /RA/15
Location: All around site Date:

RISK ASSESMENT

Job/ activity Job steps/ Methods Hazards Identified Risk Involved Control Measures
Safety induction training will be conducted for all workers.
Tool box talk shall be taken before start the work.
Work permit shall be obtained on daily basis.
Mobilization of new wrong practices due Personal injury/
manpower to lack awareness property damage PPE's will be used by all workers (safety helmet, reflective jacket,
safety shoes, hand gloves etc.)
trained workforce shall be deployed for work.
work will be done under proper supervision.
Material Storage at Site

Anti Termite
Treatement
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity: Painting 16
Location: All around site

RISK ASSESMENT

Job/ activity Job steps/ Methods Hazards Identified Risk Involved

wrong practices due to


lack of training/ Personal injury/
knowledge regarding property damage
work.

Handling & storage of


paint
improper handling & spillage/ skin
storage of paint irritation

Painting work Personal injury/


fire
property damage

skin contact due to skin irritation


improper method of eye injury
handling of paint inhalation
Painting work on ground Personal injury/
fire
property damage

spillage of paint earth pollution

Disposel of empty barrels


Miss use of barrel health deaseses
of paint
STRUCTURE PVT LTD .

Document No.: RMK /JSA/09


Date:

ESMENT

Control Measures
Safety induction training shall be conducted for all workers.
Tool box talk shall be taken before start the work.
Work permit shall be obtained on daily basis.
PPE's will be used by all workers (safety helmet, reflective jacket,
safety shoes, hand gloves, Nose mask etc.)
trained workforce shall be deployed for work.
work will be done under proper supervision.
paint will be stored in separate room & cool place.
Safe method will be followed for handling & shifting.
Spillage will be cleaned immedeately from ground.
Only trained person will allowe for handling & shifting.
no flamable material will stack along with paint.
hot work will not be allowe near paint storage area.
fire extinguisher & fire bucket will be kept near storage room
paint barrel/ can will not be left in open condition.
Hand gloves will be provided for painting work
safety goggel will be used during painting.
dust mask will be issued & monitor its use.
hot work will not be allowe near painting area.
flammable material will be removed from working place.
Crush sand will be provided over the ground / ground will be
covered by palstic paper.
empty barrel will be stored in separate room with lockabe.
barrel will be transfer out from side by contractor.
miss use of barrels will monitor by supervisor.
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity: Roofing & Cladding 17
Location: All around site

RISK ASSESMENT

Job/ activity Job steps/ Methods Hazards Identified Risk Involved

MR24 sheet bundle shifting Major injury,


from material yard to its Lacerations, crushing
location with the help of F- Hit by object injuries, slipped disc,
15/Hydra upper limb disorders,
fractures and fatal

Pinch points Cuts, Lacerations,


Crushing injuries

Crushing injuries,
Crush between Lacerations, Fractures,
Major injuries and
fatality

Major injury, fractures,


Topple of farana property damaga and
fatal
Property damage,
Failure of sling fractures, major injuries
and fatal

Sub girt fixing by using Major Injuries, fractures,


electrical drill machine Fall of material fatality

Fall of person Fractures, major injuries


and fatal

Electrocution, nerves
Electrocution damage, internal organs
damage and tissue
damage at entry and exit

Tripping/slipping hazard Fractures, Major injuries


and fatal

Cut enjury Laceration, abrasions

Eye and eye sight


Eye injuty problems, blurred vision
and lost of eye
Insulation fixing on girt Fall of person from roof Fractures, major injuries
and fatal

Roofing &
Clading Work

Head Injury, fractures


Fall of material and fatal

Tripping/slipping hazard Major Injuries, fracrures


and fatal

Head ache, increased


Sun stroke due to heavy sweating, dizziness,
summer stress, fatigue

Skin irritation (Due to


insulation contact with bare Burns, allergy
skin)

sheets shifting from ground


level to roof top by using PP
rope
PP rope( 03 nos) will be fixed
from roof top to ground level Fall of person while lifting Fractures, laceration,
in 45° the sheet major injuries and fatal
PP rope (19mm) fixing :
At ground- peg angle
At roof top- Endwall rafter
Fall of MR24 panel sheet Fractures, laceration,
while lifting major injuries and fatal

Cut enjury Laceration, abrasions

Sun stroke due to heavy Head ache, increased


summer sweating, dizziness,
stress, fatigue

Eye and eye sight


Eye injury problems, blurred vision
and lost of eye

panel placing to its location Head Injury, fractures


and seeming by electrical Fall of material and fatal
seeming machine

Fall of person Fractures, major injuries


and fatal

Electrocution, nerves
Electrocution damage, internal organs
damage and tissue
damage at entry and exit

Tripping/slipping hazard Major Injuries, fractures


and fatal
Cut enjury Laceration, abrasions

Eye and eye sight


Eye injuty problems, blurred vision
and lost of eye

Head ache, increased


Sun stroke due to heavy sweating, dizziness,
summer stress, fatigue
STRUCTURE PVT LTD .

Document No.: RMK /JSA/09


Date:

ESMENT

Control Measures
All statutory compliances to be done before starting the activity at site (Labor
licence, ESIC/WC policy,PF ragistration, all related ragister’s, etc)
Take necessary work permit before starting the activity
JSA based tool box meeting should be conducted before starting the activity.
Material shifting activity should be carried out in day light only
Do not plan activity in heavy wind pressure
Ensure hydra and other lifting tool tackles is in good condition and certified by
3 rd party
Ensure work should be carried out with competent supervision only
Deploy skilled and experianced man power for the task
Ensure all hydra / farana movement area levelled and compacted
Road survey to be carried out before starting th activity
Hydra/farana operator should have the valid DL and competency letter and
should be medically fit.
Stay away from suspended load
Provide tag line (min- 3m lenghth) while material shifting
Barricade the working area to prevent unauthorised entry

While applying sling to material do not keep hand in between material and
sling
While material lifting do not put hand inbetween gap
of two member Ensure proper wooden packing/ supports
given to material while placing on ground

Ensure there is sufficient clear space for hydra/ F-15 movement


Ensure while operating the hydra/f-15, operators vision is clear
Ensure signal man is in safe place while movement
Ensure there is sufficient space between two stacks
Ensure before lifting adjecent material is stable or is in rigid position
Ensure after shifting the material adjecent
material is in stable condition Barricade the working area to prevent
unauthorised entry

Inspect hydra / farana before starting the activity


Ensure all vehicle( hydra/farana) movement area levelled and
compacted Before startingnthe activity road survry to be carried
out Ensure all vehiclea equipement shoulkd be
operated by outherised person only
Nobody permited in operator cabin excluding operator
All lifting tool/ tackls to be inspected by competent person before taking in use
Ensure all
tool/ tackle free from any type of damag
Ensure all hydra / farana / crane movement area levelled and
compacted, to avoide any type of sudden jirk while movement
Provide rubber packing in between material
and sling to avoide damage to sling
Ensure liner sheet bundle weight not exceeding the SWL of
sling

Ensure activity should be going on in competent supervision only


Do not plan the activity in heavy wind pressure
Plan the ctivity in day light only
Do not keep
any loose material on roof top/ roof edge/on scaffolding
Ensure all hand tools tied properly, hand
tool tie off system to be implemented
MR24 panel fixing area to be barricaded to restrict
unautherised entry Sign boards should be provided at
working area Deploy skilled and
experianced manpower to perform the height work task
Do not stack material at the roof
or at the edge of roof Ensure proper house
keeping on roof

Fall protection to be provided to working at height , workers should be trained


for proper use of full body harness with double lanyard and energy absorber
Do not plan the activity in heavy wind pressure
Plan tha ctivity in day light only
Activity
should be carried out with competant supervision only
Ensure 100% anchorage of full body safety harness
Ensure all life lines is in place
and fall protection plan is implemented
Deploy skilled and experianced manpower for
the task, workers are trained for working at height
All electrical connection should be done by authorised Ensure all roof edges
electrician only to be
Ensure the all electrical equipments are free from any defects
Ensure the all electrical tool / connection cables in good condition
and through ELCB (30mA).
All the electric wirejoints
should be made using industrial sockets only. Do not any
electrical work during rainy conditions
Rout all electrical cables above the ground
All electrical cables protected from sharp
edges
Ensure proper house keeping on roof
All path way, gangway, road free from obstructions
Ensure proper illumination while
working All
electrical cables routed properly over head to avoide tripping
Ensure all man movement area is free from any type of spillage like oil,
water, etc
All sharp edges should be protected
Use anty cut- crome leather hand gloves while fixing
the guy rope
Provide eye protection to the workers( Dark safety goggles)Ensure 100% usage
of dark safety goggles during work on roof
Fall protection to be provided to working at height , workers should be trained
for proper use of full body harness with double lanyard and energy absorber
Do not plan the activity in heavy wind pressure
Plan the ctivity in day light only
Activity
should be carried out with competant supervision only
Ensure 100% anchorage of full body safety harness
Ensure all life lines is in place and fall
protection plan is implemented
Deploy skilled and experianced manpower for the task,
workers are trained for working at height
Ensure supervision
Ensure activity should be going on in competent all roof edges to be protected
only
Do not plan the activity in heavy wind pressure
Plan tha ctivity in day light only
Do not keep any
loose material on roof top/ roof edge/on scaffolding
Ensure all hand tools tied properly, hand tool
tie off system to be implemented
Insulation fixing area to be barricaded to restrict unautherised
entry Sign boards should be provided at working area
Deploy skilled and experianced manpower
to perform the height work task
Do not stack material at the roof or at the edge of roof
Ensure proper house keeping on roof

Ensure proper house keeping on roof


All path way, gangway, road free from obstructions
Ensure proper illumination while
working All
electrical cables routed properly over head to avoide tripping
Ensure all man movement area is free from any type of spillage like oil,
water, etc
Rotation of workers who working at height- to mininmise the worker’s exposer
to sun light
Half hour rest after each worker at the interval of 2 hours
Ensure drinking water arrangement at site

Use cover allclothing while working with insulation


Do not handle insulation with bare skin
Use cotton hangloves, dust mask during activity

Fall protection to be provided to working at height , workers should be trained


for proper use of full body harness with double lanyard and energy absorber
Do not plan activity in
heavy wind pressure
Ensure MR24 panel shifting activity should be carried out in day light only
Activity should be carried out
with competant supervision only
While lifting the sheet person will always expose to leading edge, ensure
100% anchorage of full body safety harness
Ensure all life lines is in place and fall protection plan is
implemented
Deploy skilled and experianced manpower for the task, workers are
trained for working at height
Ensure all roof edges to be protected by life line
Do not keep any loose material on roof top/ roof edge
Ensure all hand tools tied properly, hand
tool tie off system to be implemented
Ensure before lifting the MR24 panel sheet , PP rope tied
properly with sheet
Protect all PP rope from sharp edges , to avoide cut or damage to PP
rope MR24 panel fixing
area to be barricaded to restrict unautherised entry Sign
boards should be provided at working area
Deploy skilled and experianced manpower to perform the height work
task

All sharp edges should be protected


Use anty cut- crome leather hand gloves while fixing the
guy rope
Rotation of workers who working at height- to mininmise the worker’s exposer
to sun light
Half hour rest after each worker at
the interval of 2 hours Ensure drinking water
arrangement at site
Provide dark safety goggles to workers while working on roof top

Ensure activity should be going on in competent supervision only


Do not plan the activity in heavy wind pressure
Plan tha ctivity in day light only
Do not keep any loose
material on roof top/ roof edge/on scaffolding
Ensure all hand tools tied properly, hand
tool tie off system to be implemented
MR24 panel fixing area to be barricaded to restrict
unautherised entry Sign boards should be provided at
working area Deploy skilled and
experianced manpower to perform the height work task
Do not stack material at the roof
or at the edge of roof Ensure
proper house keeping on roof

Fall protection to be provided to working at height , workers should be trained


for proper use of full body harness with double lanyard and energy absorber
Do not plan the activity in heavy wind pressure
Plan tha ctivity in day light only
Activity
should be carried out with competant supervision only
Ensure 100% anchorage of full body safety harness
Ensure all life lines is in place and
fall protection plan is implemented
Deploy skilled and experianced manpower for the
task, workers are trained for working at height
Ensure electrician
All electrical connection should be done by authorised all roof edges
onlyto be
Ensure the all electrical equipments are free from any defects
Ensure the all electrical tool / connection cables in good condition
and through ELCB (30mA).
All the electric wirejoints
should be made using industrial sockets only. Do not any
electrical work during rainy conditions
Ensure proper house keeping on roof
All path way, gangway, road free from obstructions
Ensure proper illumination
while working All
electrical cables routed properly over head to avoide tripping
Ensure all man movement area is free from any type of spillage like oil,
water, etc
All sharp edges should be protected
Use anty cut- crome leather hand gloves while fixing
the guy rope
Provide eye protection to the workers( Dark safety goggles)Ensure 100% usage
of dark safety goggles during work on roof

Rotation of workers who working at height- to mininmise the worker’s exposer


to sun light
Half hour rest after each worker at the interval of 2 hours
Ensure drinking water arrangement at site
RMK INFRASTRUCTURE PVT LTD .
Project Site name : Continental
Job/ Activity: Water Proffing 18
Location: All around site

RISK ASSESMENT

Job/ activity Job steps/ Methods Hazards Identified Risk Involved


wrong practice due to
Material shifting at work lack of knowledge Injury to person
place Non
Use ofuse of PPE'swheel
damaged
Major injury to
barrow for material
person
Cleaning of surface for shifting inhallation
dust, fumes generating
applying chemical
Chemical handling by Skin / eye irritation
unauthorised person Inhallation/
Water worker not aware about swallowing
Improper handling by
Proofing work Applying chemical on MSDS person
slab surface
Smell of chemical Headache
Unsafe procedure of contact with body
handling part (skin/eye)
Providing bricks & Lack of use of PPE's Injury to person
mortors work with cement Skin irritation
Stacking of empty Miss use of empty can/
poisoning
barrels/ cans of chemical barrels
STRUCTURE PVT LTD .

Document No.: RMK /JSA/09


Date:

ESMENT

Control Measures
Only trained workers will be deployed for work.
Tool-Box talk will be held before start the work on daily basis.
PPE's will be used as per required in job activity.
Only good condition of wheel barrow will be used for material
shifting.
Dust mask & hand gloves will be used during claening work.
workers movement will be done opposite side of wind flow
Only trained person will be allowed to handling & mixing the
chemical.
During the handling & mixing safety goggel, gloves, mask will be
used.
MSDS will be explained to workers enguaged in activity.
Eye wash arrangement will be done at first-aid center at site.
Other workers will not be allowed in this area during the sprinkling
of chemical
safe procedure of chemical handling will be explained to workers.
Training for Chemical handling,storage will be given to workers.
PPE's (Safety helmet, safety shoes, jacket, hand gloves) will be
used as per required in job activity.
Rubber/ PVC hand gloves & gum boot will be used during work.
Empty can/ barrels will be stacked in secured room/ place.
Can/ barrels will be properly disposed out side from site.