MRS, 2nd BI-ANNUAL-2023 (01.07.2023 to 31.12.

2023) DISTRICT CHINIOT

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite

b) Dressing of earthwork (done by machinery or otherwise 100Sft. 306.10 -- sq.m 32.95 -- i) The surface area dressed is to be
and left undressed) to designed section. taken for measurement.

ii) The item is applicable where the


dressing is done by the contractor
other than the one who executed the
work.
21 Excavation in foundation of building, bridges and other
structures, including dagbelling, dressing, refilling in layers around 17.1 to 17.5 If refilling is not required, reduce labor and
structure with excavated earth, watering and ramming lead composite rate by Rs 720/- P.%0 Cft or
upto one chain (30 m)lift upto 5 ft (1.5m). Rs 25.50/- P.Cu.m and surplus earth will
1) By M anual be adjusted accordingly.
i) in sand, ashes or loose soil 1000 Cft. 11,711.05 -- Cu.m 413.65 --
ii) in ordinary soil. 1000 Cft. 13,669.90 -- Cu.m 482.80 --
iii) in hard soil or soft murum. 1000 Cft. 15,298.80 -- Cu.m 540.35 --
2) a) By Excavator
i) Sand,ashes or loose soil Per %0Cft 3,896.65 6,074.60 Cu.m 137.45 214.30
ii) Ordinary soil Per %0Cft 7,143.85 9,452.65 Cu.m 252.05 333.50
iii) Hard soil or Soft murum Per %0Cft 7,468.55 10,416.15 Cu.m 263.50 367.50
b) Lift from 5ft (1.5m) to 15 ft (4.5 m):-
i) Sand,ashes or loose soil Per %0Cft 4,546.10 7,268.55 Cu.m 160.40 256.45
ii) Ordinary soil Per %0Cft 8,442.70 11,328.70 Cu.m 297.85 399.70
iii) Hard soil or Soft murum Per %0Cft 8,767.45 12,451.90 Cu.m 309.30 439.30
c) Lift above 15 ft (4.5 m):-
i) Sand,ashes or loose soil Per %0Cft 5,195.50 8,462.45 Cu.m 183.30 298.55
ii) Ordinary soil Per %0Cft 9,741.60 13,204.80 Cu.m 343.70 465.85
iii) Hard soil or Soft murum Per %0Cft 10,066.30 14,487.65 Cu.m 355.15 511.15
22 Cutting hard rock such as granite, ballast, hard lime stone or 1000 Cft. 105,188.15 119,459.20 cu.m 3,715.25 4,219.30 17.1 to 17.5 Tools and plants required shall be the
sand stone, etc. with chisels and hammers, for small liability of the contractor.
foundations.

23 Extra for excavation requiring shoring. 1000 Cft. 1,721.30 2,253.50 cu.m 60.80 79.60 17.1 to 17.5 Composite rate includes materials,
i.e. plank, etc.
24 Compaction of earthwork (soft, ordinary or hard soil) :- ditto

a) Mixing, moistening earth to optimum moisture content 1000 Cft. 1,541.85 -- cu.m 54.45 --
in layers for compaction, etc. complete.

b) Compaction by rolling with animal driven


roller/hand rammed:

i) soft or sandy soil 1000 Cft. 1,948.30 -- cu.m 68.80 --


1) The rate does not include hire
ii) ordinary soil 1000 Cft. 2,273.05 -- cu.m 80.30 -- charges of the roller.
2) Roller to be 'supplied by
iii) hard soil 1000 Cft. 2,597.75 -- cu.m 91.75 -- Government

iv) admixture of shingle 1000 Cft. 2,922.50 -- cu.m 103.20 --

c) Ramming earthwork (all types of soil). 1000 Cft. 1,948.30 -- cu.m 68.80 --

Chap-3 (Earthwork) Page 30