MRS, 2nd BI-ANNUAL-2023 (01.07.2023 to 31.12.

2023) DISTRICT CHINIOT

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite

d) Ramming earhtwork behind retaining walls. 1000 Cft. 2,597.75 -- cu.m 91.75 --

25 Compaction of earthwork with power road roller, including 17.1 (a)


ploughing, mixing, moistening earth to optimum moisture * 411-5 and The rate also includes hire charges of
content in layers, etc. complete: 202-3 machinery, cost of fuel, lubricant, pay
of driver and cleaner, etc.
i) 95% to 100% maximum modified AASHTO dry density. 1000 Cft. -- 1,664.75 cu.m - 58.80

ii) 90% maximum modified AASHTO dry density. 1000 Cft. -- 1,405.60 cu.m - 49.65

iiii) 85% maximum modified AASHTO dry density. 1000 Cft. -- 1,146.45 cu.m - 40.50

26 Extra for wet earthwork. 1000 Cft. 4,546.10 -- cu.m 160.55 - 17.1 to 17.5 That will support a man's weight.

27 Extra for slush or Daldal including dewatering. 1000 Cft. 10,391.05 -- cu.m 367.00 - 17.1 to 17.5 That will not support a man's weight.

28 Extra for puddling. 1000 Cft. 8,149.70 -- cu.m 287.85 - ditto

29 Earthwork on small rain water drains, along canal banks, 100 Rft. 1,233.95 -- Metre 40.45 - ditto
roads and plantation drains, dressed, etc. complete.

30 Filling and compacting soil, earth and boulders behind 1000 Cft. 11,689.90 -- cu.m 412.90 -- 17.1 to 17.5
retaining walls (including excavation of soil and lead upto 50
ft.( 15 m).

31 Dag bailing 3" (75 mm) deep. Per mile 4,878.70 -- Per 3,032.15 -- ditto Dag bailing for layout of borrow pit, to
Km be done by contractors at their own
cost.
32 Turfing slopes of banks or lawns with grass sods including 100Sft. 2,164.80 -- sq.m 232.95 -- ditto
ploughing, laying, setting and watering (Turf got from within a
distance of 5 miles (8 Km.) and maintenance for 15 days).

33 Berm cutting:- 17.1 to 17.5

a) lead upto a single throw of Kassi, phaora or shovel 1000 Cft. 5,844.95 -- cu.m 206.45 --
(without dressing).
b) upto 50 ft(15 m)lead (including dressing). 1000 Cft. 10,412.15 -- cu.m 367.75 --

34 Berm trimming both sides of channels:- 17.1 to 17.5

a) upto 3½ ft. (1.06 m) depth. Per Mile 15,188.80 -- Per Km. 9,493.00 --
b) exceeding 3½ ft. to 5 ft. (1.06 to 1.5 m) depth. Per Mile 21,485.20 -- Per Km. 13,428.25 --
c) exceeding 5 ft. to 8 ft. (1.5 to 2.4 m) depth Per Mile 33,409.20 -- Per Km. 20,880.75 --

35 Ploughing and levelling borrowpits. ditto Area ploughed to be measured.

i) upto 3 ft. (0.9 m) depth. Per Acre 3,247.20 -- Per Hect. 8,024.00 --
ii) above 3 ft. (0.9 m) depth. Per Acre 6,494.40 -- Per Hect. 16,048.00 --