This setting out/levelling report documents the inspection of a construction project. It includes the project title, inspection date, reference drawings, reference benchmark, grid locations with design and observed levels, and signatures of those who set out and inspected the work. The purpose is to record level measurements in the field and note any discrepancies from the design plans.
This setting out/levelling report documents the inspection of a construction project. It includes the project title, inspection date, reference drawings, reference benchmark, grid locations with design and observed levels, and signatures of those who set out and inspected the work. The purpose is to record level measurements in the field and note any discrepancies from the design plans.
This setting out/levelling report documents the inspection of a construction project. It includes the project title, inspection date, reference drawings, reference benchmark, grid locations with design and observed levels, and signatures of those who set out and inspected the work. The purpose is to record level measurements in the field and note any discrepancies from the design plans.