BOQ - North Disposal Facility Repairs - Rev2
BOQ - North Disposal Facility Repairs - Rev2
No. SECTION A
Sub Total -
3 Facilities for Contractor
Electrician HR 1 -
Boilermaker HR 1 -
Draftsman HR 1 -
General Worker HR 1 -
Sub Total -
5 ECSA REQUIREMENT
Sub Total -
6 HEALTH AND SAFETY
Sub Total -
Page 1 of 4
9 Meetings
UNIT Qty
Sub Total -
10 Disbursements
UNIT Qty
Sub Total -
11 Transformer Design and Manufacturing
UNIT Qty
Sub Total -
Page 2 of 4
Item Unit Qty Rate Amount
No. SECTION A
Sub Total -
3 Facilities for Contractor
Technician HR 1 -
Boilermaker HR 1 -
Fence installers HR 1 -
General Worker HR 1 -
Sub Total -
5 ECSA REQUIREMENT
Sub Total -
Page 3 of 4
9 Meetings
UNIT Qty
Sub Total -
10 Disbursements
UNIT Qty
Sub Total -
11 Security Enclave and small civils
UNIT Qty
Complete Alarm installation linked to SoC GSM and VHF, mine spec EA 1 -
Fence Energizer Namtek Merlin M185 EA 1 -
Electric fence full height (15MX15M Area) SUM 1
Build Reinforced Bund wall Around Sump 9 square meters M^2 9
Painting of structure at sump pump – (Yellow and Black Glossy Enamel) SUM 1
Dismantling of all old structures SUM 1
Clean
9m out Sump
lattice mast, area
must+/-
be2lowered
-3m deep
and raised as required. PR Eng. Certificate – SUM 1
Galvanized EA 1 -
Plinth for mast as per design (Pr.eng.) EA 1 -
Relevant licenses EA 1 -
Orange stainless steel enclosure 600x400x260 EA 1 -
Wireless link - 300 Mbps Sub Term, Int 23 dBi dual-polarity antenna, 2xFast
Ethernet (POE out), 300 mW EA 1 -
transmit power - Infinet External outdoor lightning protection unit, GigabitEthernet
passthrough, built-in lightning protection EA 1 -
Supply and install BARB wire around fence on the outside 3 x coils M 180
Crusher stone in fenced area 100mm thick – Addition to BOQ M^2 225
Clear view fencing 15x15x2.4m with spikes EA 1
Sub Total -