2 ASME Quality Control System
2 ASME Quality Control System
Working together
for a safer world
ASME Concept
Quality
Control
System
ASME Code
Requirements
Equipment
quality and
safety
Inspection by
Authorized
Inspector, AI
National Board
Registration
4 Working together
for a safer world
1
15/06/2021
Specific Specific
Technical Technical
requirement requirement
Specific
Technical
requirement
Specific Technical
requirement
Quality System
Quality Systems
2
15/06/2021
3
15/06/2021
10. Inspection
11. Test Control
12. Control of M easuring and Test Equipment
13. Handling, Storage and Shipping
14. Inspection and Test Status
15. Control of Non-conforming Items
16. Corrective Action
17. Quality Assurance Records ( Lifetime Records and Non-permanent Records )
18. Audits
19. AIA
* QA M anual shall be distributed to AIA.
* QA M anual shall be available to the ANI.
10
4
15/06/2021
* General
11
1) A Cover Sheet contains the company name, physical address, effective date of the QC
Manual, phone number or other information.
2) A brief description of the products being fabricated and/or work being accomplished
under the Code.
3) Manual revision control system.
4) Provision for review and approval of QC Manual t o maintain it current.
5) Provision for submittal of QC Manual revisions to t he AI for acceptance prior to
implementation.
6) Provision for the custody and control of the Code Symbol Stamp.
7) In case of more than one language, English version is mandatory and translation
control method shall be identified.
8) A glossary of terms.
12
5
15/06/2021
13
2. Organization
14
6
15/06/2021
15
16
7
15/06/2021
4. Material Control
17
2) Provisions to assure that the material received is properly identified and has
documentation (MTR or COC) to satisfy Code requirements.
3) Provisions to assure that only the intended material is used.
4) Procedures for control of substitution of materials.
5) Contents of Purchase Specification including requirements of the applicable
material specification, need for MTR or COC, identification marking, and additional
test requirements, impact test, simulation t est etc.
6) Inform ation t o be provided t o the receiving inspector.
7) If further material testing is required, the applicable procedures for control.
8) Measures to assure the proper marking, handling and storage of material.
9) Procedure for control of stock material and Customer supplied material.
10) The title of responsible person for Certification of MTR f or ASTM materials.
18
8
15/06/2021
1) Provisions for the use of Checklist, Process Sheet, Traveller, etc. for listing of
examinations and tests to be performed and for designation of inspection points.
2) Such Checklist, Process Sheet, Traveller, etc. are made available to the AI prior to start of
fabrication.
3) Measures provide for transferring markings to assure traceability is maintained.
4) If a Coded Marking system is used, it is documented and acceptable to the AI.
19
5) Measures assure that the AI and QC Inspector are inform ed approaching inspection
points.
6) Provisions for repair of material and weldments and concurrence of AI for base
material repair.
7) Measures are established to assure that a final inspection is performed to assure all
specified requirements have been met prior to certifying of the Manufacturer’s
Data Report and/or Code Symbol Stamping.
8) Final pressure test requirements.
9) Provisions for the preparation, certification, and distribution of the M DR.
10) Registration of M D R with National Board.
11) Requirements of Name plate.
12) Documents or records to be reviewed by t he AI.
13) Registration with National Board.
20
9
15/06/2021
21
22
10
15/06/2021
23
6. Correction of Non-conformities
24
11
15/06/2021
6. Correction of Non-conformities
25
6. Correction of Non-conformities
• Procedures for correction of non-conformities
1) Identification
2) Segregation by marking, barrier, or ropes
3) Documentation on NCR
4) Establishment of disposition
(1) Use as is : Need to review by engineering personnel, Accepted by AI, or Customer.
(2) Repair : Review by engineering personnel, if required. Concurrence of AI or
Customer prior to implementation. Repair steps are described in NCR or PCS.
Acceptance standard is same as before.
(3) Replace/Rework : Necessary action shall be taken
(4) Return to supplier
(5) Final verification is required by QC, AI or Customer.
26
12
15/06/2021
Repair of Defects
1) In materials (UG-78)
: Defects in material may be repaired provided acceptance by the AI is first
obtained for the method and extent of repairs.
Defective material that can not be satisfactorily repaired shall be rejected.
2) In weldments (UW-38)
: Defects such as cracks, pinholes, and incomplete fusion, detected visually
or by the test or examination shall be removed by mechanical means or
by thermal gouging process.
27
7. Welding
The quality control system shall include provisions for indicating that welding
conforms to requirements of Section IX as supplemented by this Section.
Manufacturers intending to use AWS Standard Welding Procedures shall describe
control measures used to assure that the welding meets the requirements of this
Section (see PW-1.2) and Section IX.
28
13
15/06/2021
7. Welding
* QC Manual Check Points
5) WPSs are available to the welders in the work area.
6) Who assigns the applicable WPS t o the specific weld joint and how to informs
to the welder.
7) Control measures for qualification of welder and assuring continued welder
qualification in accordance with Section IX.
8) Those responsible for assuring that only qualified welders are assigned to perform
Code welding are identified.
9 ) M easures provide for the storage and conditioning of welding materials.
10) Measures are established for removing or inspecting tack welds.
1 1 ) M easures provide for the right of AI to require requalification of a welder or
procedure for cause.
1 2 ) M easures provide for a system to identify work completed by each welder.
29
8. Non-destructive Examination
The quality control system shall include provisions for identifying nondestructive
examination procedures the Manufacturer will apply to conform with
requirements of this Section.
30
14
15/06/2021
31
32
15
15/06/2021
Records Retention. The Manufacturer or Assembler shall have a system for the
maintenance of radiographs (PW-51.4), UT reports (PW-52.2), Manufacturer’s Data
Reports (PG-113.3), and qualification maintenance records for welders and welding
operators (PW-28.4) and brazers and brazing operators (PB-29.3) as required by this
Section.
33
34
16
15/06/2021
1) Forms used to control f unctions relative to quality are included within t he QC Manual
and t heir use explained in the t ext of the QC Manual.
2) Provisions exist for revision control of the Forms.
3) Index of Forms.
35
36
17
15/06/2021
1) Inspection of pressure relief valves shall be by designated representative of the ASME, as described
in PG‐73.4.
2) The written description of the quality control system shall include reference to the CI and the
ASME designee.
2.1 The valve Manufacturer (or assembler) shall make available to the ASME designee at the
Manufacturer’s plant a current copy of the written description of the applicable quality control
system.
2.2 The valve Manufacturer’s (or assembler’s) quality control system shall provide for the ASME
designee to have access to all drawings, calculations, specifications, procedures, process
sheets, repair procedures, records, test results, and any other documents as necessary for the
designee to perform his duties in accordance with this Section. The Manufacturer may provide
such access either to his own files of such documents or by providing copies to the designee.
37
15. Certification
1) Methods other than written signature may be used for indicating certifications,
authorizations, and approvals where allowed and as described elsewhere in the
Code.
2) Where other methods are employed, control and safeguards shall be provided
and described to ensure the integrity of the certification, authorization, and
approval.
38
18
15/06/2021
39
Engineering Department
40
19
15/06/2021
Purchasing Executive
• Copy of PR
• Copy of PO
• Understand code section – ASME II
Part A
41
• Design drawing
• PO
• ITP
• WPS/PQR/WPQ
• Welder list
• Welding supervisor and welder training on issue of electrodes,
• read and understand WPS and etc.
42
20
15/06/2021
43
44
21
15/06/2021
45
46
22
15/06/2021
47
File “D”---MDR
48
23
15/06/2021
• HT procedure
• Welding consumable control procedure
• Repair procedure
• Coded Marking procedure
• Fabrication and Tolerance procedure
• PWHT procedure, PWHT Instruction, Sample PWHT Chart
• Document control procedure
• Any other available procedures
49
50
24
15/06/2021
• Generally clean
• To segregate area for ASME work, Material inspection, Hold and reject Area
• Area for excess plate , pipe , flanges and small attachment pieces i.e. lug, pad, etc..
• To stamp and identify all material with Material specification and heat no.
• To paint white box for easy detection.
• To place demo vessel on rotator
• To clear safety passage
• To provide table or display board—design drawing, WPS/WPQ, weld map ready
available.
• To standby tool, tong, welding gauge for demo
• Inspector to verify all weld gap, fillet size, weld reinforcement to comply to code
51
Chamni Mosagul
Lloyd’s Register International(Thailand)Ltd./ Inspection Services
22 nd floor, Sirinrat Building, 3388/78 Rama IV Road, Klongton,
Klongtoey, Bangkok 10110 Thailand.
T. +66 2 3675594-7
M. +66 81 9352069
E. Chamni.mosagul@lr.org
Working together
for a safer world