Professional Documents
Culture Documents
Daily Manpower Schedule - ATS-24!11!2023
Daily Manpower Schedule - ATS-24!11!2023
Daily Manpower Schedule - ATS-24!11!2023
1|Page
24-11-2023
Daily Work Schedule-AQ
Leaving
Project # / Planned from Project
SL No. Manpower Resources Location Remark
Details Days Accommod In charge
ation
R1-200
MAV ACCESS 30 01. Govinda Tamang (AQ-178/L3) 03. Suresh Rai (L2/P/AQ-022) Praneshkumar Prabhu Durairaj
6. Days 07:00 Hrs DXB
HOTEL 02. Tek Prasad Gurung (L-2/AQ-140) 04. Ubaraj Gurung (L1 /W AQ-160) 0549977562 (D/AQ010)
DAY SHIFT
01. Ram Chandra Adhikari(L-3/AQ-142)
R1-200 06. Amal P P (L-1/W/AQ-161)
30 02. Akhil Rajendran (L3/B/P/AQ015)
MAV ACCESS 07. Bikash Biswakorma (AQ-172/L1/W) Praneshkumar Prabhu Durairaj
7. Days 03. Purna Bahadur (L2/AQ-106) 18:30 Hrs DXB
WATER PARK 08. Sivaramakrishnan Kintada (AQ-173/L-1) 0564121148 (D/AQ010)
04. Padam Bahadur (L2/P/AQ023)
NIGHT SHIFT 09. Muneer PA (L-1/N/AQ-185)
05. Syam Baby (L1/W AQ-158)
01. Renosh Rajan (L3/ ASST.ENG. /AQ-088)
AQ-200 B Manoj Sivadas
3 Days 02. Mariappan Veeran (L2/B/AQ053) Praneshkumar
8. ELECTRICAL WORKS 08:00 Hrs DXB (AQ-156/D)
03. Bala Murugan (L1/AQ-97/HW) 0564121148
ATLANTIS 04. Noble (L1/ET AQ-157)
2|Page
24-11-2023
Daily Work Schedule-AQ
Leaving
Project # / Planned from Project
SL No. Manpower Resources Location Remark
Details Days Accommod In charge
ation
AQ-100 Bharat Sajy
15. 01. Amal Haridas (AQ-166/QHSE/L1) ….. DIP …..
Camp 0561030244
01. Bharat Sajy (AQ-026) Manoj Sivadas
AQ-100 NA 04. Rafeeque (AQ-031)
(AQ-156/D)
16. 02. Ashraf (PRO/AQ-051) 08:30 hrs --- DIP2
Admin 05. Mubashir (AQ-085)
03. Vishnu Sethurajan (QHSE/AQ-092)
01. Francis K (D/AQ067)
--- 02. Mohammed Hashiq (D/AQ075) 05. Pius Peter (D/AQ083)
17. Drivers 03. Manoj Sivadas (AQ-156/D)
--- --- --- ---
06. Ashik Emam(D/AQ-087)
04. Prabhu Durairaj (D/AQ010)
-- 01. Manu (L3/SUP/B/P/AQ032)
02. Resham Gurung (L3/AQ-103)
03. Fazim Abdul (L2/B/SP/AQ065) 14. Veeramani (L3/SUP/B/P/AQ006)
04. Gayan Chathuranga (AQ-058) 15. Aswin Tinson (L2/B/SP/AQ-066)
05. Mahesh PM (L1/HB/AQ-070) 16. Selvendren Raviraj (L2/AQ074)
06. Dasan KT (L2/P/AQ082) 17. Parjan Gurung (L1/AQ046)
AQ-111 Bharat Sajy
18. 07. Dashakumar (D/A -AQ-21) 18. Jithin Raj (L-2/B/AQ-131) --- --- ---
Vacation 0561030244
08. Ahammed Althaf VM (QC/L1/AQ-122) 19. Arunkumar NK (L3/AQ-137)
09. Sarath Thankappan (L1/AQ043) 20. Prins Sharma (GST/HB/AQ-143)
10. Sarath KS (L1/AQ054) 21. Sanju Sadanandan (L1/AQ069)
11. Muddangula Vijay (l-2/AQ-138) 22. Poojith P (L1/AQ073)
12. Vysakh Vijayakumar (L1/AQ068) 23. Nadarshan (L1/AQ-090)
13. Sumjith Sadanandan (L1/AQ-072)
•
• All medical cases shall be reported to the concerned supervisor 1hr before site mobilization time. Medical certificates shall be endorsed by project supervisor.
• All Site Changes, &Shift Changes Marking Blue Colour
• Camp boss contact information : Prabhu Durairaj -0547967044
• Please be informed that working under the influence of alcohol is strictly prohibited.
3|Page