Professional Documents
Culture Documents
02 - Machine Room WiringWire Connecting
02 - Machine Room WiringWire Connecting
3 Inspect power line length of main power supply of phase, and implement wiring/wire connecting.
Wiring point Home position Destination
3-phase power line
Lower part at right side of
Power supply for Distributing box of building
distributing box
lighting
FSK1
Note) please refer to drawing 003-Invter OCB
Motor
Controller
M/C
M/C
Controller