SLAB REBARS
STEP 1:
STEP 2:
STEP 3:
Sides 4
Layers 2
STEP 3:
Ties 30 cm ties
Length of Tie 0.437
(from table)
Area of Slab 2.16 sq. m
STAIRS
STAIRS
DIMENSION
DESCRIPTION QTY VOLUME TOTAL VOLUME CEMENT (pcs) SAND (cu.m) GRAVEL (cu.m)
WIDTH LENGTH THK
Threads 40.000 0.300 0.175 0.000 0.000 0.000 0.000 0.000
Threads 6.000 0.250 0.175 0.000 0.000 0.000 0.000 0.000
Threads 6.000 0.200 0.175 0.000 0.000 0.000 0.000 0.000
landing 4.000 1.250 1.500 0.000 0.000 0.000 0.000 0.000
Landing beam 3.000 0.400 0.200 0.000 0.000 0.000 0.000 0.000
Stairway Column 3.000 0.400 0.250 0.000 0.000 0.000 0.000 0.000
TOTAL 0.000 0.000 0.000 0.000
with wastage (10%) 0.000 0.000 0.000
MATERIAL LABOR
ITEM NO. DESCRIPTION QUANTITY UNIT TOTAL
UNIT COST COST UNIT COST COST
CONCRETE
Stairs
Concrete Puring (one bagger) 3000 psi 0.000 cu.m 711.970 0.000
Portland Cement 0.000 bags 250.000 0.000
Fine Sand 0.000 cu.m 950.000 0.000
3/4 Gravel 0.000 cu.m 1000.000 0.000
TOTAL 0.000 0.000 0.000