Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

3.

00

4.50 0.15 0.15


0.64 1.43 0.63

3.00
3.90

4.50
SHED- PLAN ROOF PLAN

0.94
0.10
PLAN

3.50
3.50

2.00
TREE

1.60
0.15

0.35

0.45
0.15
BRICK MASONRY

FRONT ELEVATION SIDE ELEVATION


ELEVATION

SHED
18 TREE WITH SITTING BASE(AS CHAUTARI) 10
GL
0.35
0.58
0.65

WALL SECTION

23
2.
WATER
1.80

FOUNTAIN PIPING
1.80

SCULPTURE OF MUD POT SHIVA STATUE


7.00

PLAN
Plan
SCULPTURE OF MUD POT
CONCRETE SHIVA STATUE

1.39
WATER POURING

0.30
PIPING FOR WATER FOUNTAIN

0.15
CURD POURING

1.50
1.68

WATER LEVEL
YOGURT POURING
0.15

WATER FALL MAIN PIPING CONNECTION


1.50

WATER LEVEL

14 SHIVA STATUE

Elevation
16 SCULPTURE BASED ON THE POND HISTORY

You might also like