Professional Documents
Culture Documents
SECTION 01115 Mandatory Provisions: /conversion/tmp/activity - Task - Scratch/707297525
SECTION 01115 Mandatory Provisions: /conversion/tmp/activity - Task - Scratch/707297525
MANDATORY PROVISIONS
A. Any mention in the Divisions of this Project Manual which follow the General
Requirements or indication on drawings of articles, materials, operations, or
methods requires that the CONTRACTOR provide each item mentioned or
indicated, of quality or subject to qualifications noted; perform according to
conditions stated, each operation the same prescribed; and provide therefore all
necessary labor, equipment, and incidentals, even though such mention of
articles, materials, operations, methods, quality, qualifications, or conditions is
not expressed in complete sentences.
(END OF SECTION)
_____________________________________________________________________________
[PROJECT TITLE/PROJECT #] Mandatory Provisions
[B.O.E. MASTER SPECIFICATION] Division 01–GR
[07/01/2001] /conversion/tmp/activity_task_scratch/707297525.doc 01115-1