Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

ENVIRONMENTAL PROJECT NO.

ENGINEERING
DIVISION % SUBMITTAL LOG NO.________

PROJECT SPECIFICATIONS APPROVAL FORM


========================================
PROJECT TITLE :
=====================================================
DIVISION / SECTION / TITLE :
======================================================
DESCRIPTION OF ACTIVITY SIGNATURE DATE
======================================================
1. Division/Section reviewed by PE. PE
---------------------------------------------------------------------------------------------------------------------------------------------------------------------
2. Division/Section transmitted to CM / DC for review. PE
---------------------------------------------------------------------------------------------------------------------------------------------------------------------
3. Division/ Section reviewed by CM / DC & returned to the PE. CM/DC
--------------------------------------------------------------------------------------------------------------------------------------------------------------------
4. Division/ Section reviewed by PE and transmitted to SC. PE
---------------------------------------------------------------------------------------------------------------------------------------------------------------------
5. Division/ Section reviewed by SC and transmitted to the WPC SC
---------------------------------------------------------------------------------------------------------------------------------------------------------------------
6. Division/ Section logged, word processed and transmitted copies to the PE. WPC
---------------------------------------------------------------------------------------------------------------------------------------------------------------------
7. Division/ Section back-checked by CM / DC and returned to the PE. CM/DC
----------------------------------------------------------------------------------------------------------------------------------------------------------------------
8. Division/ Section reviewed by PE and transmitted to the WPC. (If needed) PE
---------------------------------------------------------------------------------------------------------------------------------------------------------------------
9. Division/ Section word processed and transmitted copies to the PE.(If needed) WPC
---------------------------------------------------------------------------------------------------------------------------------------------------------------------
10. Division/ Section back-checked by CM / DC and returned to the PE.(If needed) CM/DC
---------------------------------------------------------------------------------------------------------------------------------------------------------------------
11. DIVISION / SECTION FINALIZED PE
======================================================
Abbreviations : SC----Specification Coordinator
PE----Project Engineer
DC----Discipline Coordinator
WPC--Word Processing Coordinator
CM----Construction Manager (GR or when applicable)

/conversion/tmp/activity_task_scratch/707297867.doc

You might also like