Professional Documents
Culture Documents
Report
Report
Report
i
6.4.6 Displacements ..........................................................................................................................13
6.4.7 Damage Limitations ................................................................................................................13
6.4.8 Analysis of the Torsional Irregularity as per Euro Code .....................................................13
6.4.9 Regularity in plan and Elevation ............................................................................................15
6.5 Seismic Auto Seismic Load Calculations ......................................................................................15
6.6 Geometric imperfections ................................................................................................................17
6.7 Second order effects ...........................................................................................................................17
6.8 Beam-Column Joint for Local Ductility Requirement ....................................................................18
7 Load Combination.................................................................................................................................18
8 RESULTS AND CHECKS ...................................................................................................................20
8.1 Seismic Modal Analysis ..................................................................................................................20
8.2 Check Story Drift for Damage limitations & Inter-story Drift Sensitivity ................................20
8.3 Check the model for any warning .................................................................................................21
8.4 Normalized axial force check and verified axial compression ratio ...........................................22
8.5 Stair Design .....................................................................................................................................22
8.6 Footing Pad Design .........................................................................................................................22
8.7 Bending moment diagram &Shear force diagram in the Appendix ...........................................25
8.8 Beam and Column Reinforcement in Appendix ..........................................................................25
8.9 Beam column capacity Ratio in Appendix ....................................................................................25
8.10 Shear Plus Torsion Reinforcement Design for beam .................................................................25
8.11 Retaining wall analysis and design ..............................................................................................27
8.11.1 Soil protection .........................................................................................................................27
ii
Table4. 1Standards used for Load Calculations ............................................................................................3
Table4. 2List of Standards used for Design of Structural Elements ..............................................................3
iii
1. INTRODUCTION
The Consulting Company has been retained to provide a full technical structural design for the
B+G+10+Terrace Apartment Used Building in Bole Sub City, W-01, and Addis Ababa, Ethiopia. The
project site owner ATO SEMERE KASAHUN. The location of the building site with respect to Google
earth satellite image is shown in Figure 1 below. The project is located within a plot that covers an area of
approximately 350 m2
The project consists of Basement floor with 12 Story Residence.
This report has been prepared for purpose of evaluating and further technical development for
consideration and use on the above referenced project.
The report includes recommendatio n on structural design philosophy, structural design criteria,
sustainability and material selection.
The fundamental philosophy of the structural design was to achieve the architectural intent, both
aesthetically and functionally, whilst maintaining safety and economy of design. In this regard, the key
philosophies around which the structural design will be focused include the following:
1
Maintaining simplicity of the structure, as best that can be achieved within the architectural
constraints
Maintaining awareness of build-ability aspects of the structure at each stage of design, with
consultation with building contractors at each stage.
In order that simplicity and economy of structure is achieved, it is intended that the majority of
vertical elements (such as walls and columns) are vertically aligned from roof continuously down
to foundation level, thereby avoiding, as much as possible, transfer structures at ground level.
Transfer structures will add cost and impinge on clearances for horizontal distribution of services
at underside of ground floor level.
Where lift cores are provided within buildings, these shall be used as structural cores to provide
lateral stability to the buildings, supplemented as necessary with additional isolated shear walls
placed, where possible, in partitions lines and in alignment with basement layout.
Providing suitable flexibility for future use and layout of buildings, with an appropriate balance
against cost of structure
2.1 SUSTAINABILITY
It is the intention of consultant to minimize use of materials through efficient design and maximize the
percentage of local raw and manufactured materials in adopted construction methods and embedded in the
design.
Concrete has an inherent fire resistance through control of cover to reinforcement and member size. In
comparison, steelwork requires additional fire protection in the form of intumescent paint or protective
surround of fireboard, block work or concrete.
Concrete construction is a popular practice in Ethiopia, and it has distinct advantages in terms of cost,
availability of materials in the local market which suits the skills of local contractors.
Concrete also has good acoustic properties and provides good thermal mass properties in comparison to that
of steel.
Given that concrete provides a more natural resistance to corrosion than structural steel, with minimal 'whole
life' maintenance requirement for protective coatings, it is recommended that the structural frame is
comprised predominantly of concrete material.
2
Due to the above reasons, Cast-in-situ reinforced concrete was adopted as the primary material for this
project.
3. ANALYSIS SOFTWARES
The following outlines the details of analysis and design software that were adopted for the project:
The principal codes used in this project are as outline in the tables below.
Table4. 1Standards used for Load Calculations
Standard Title
1 ES EN 1991-1:2017 Actions on structures-part 1-1
Standard Title
1 ES EN 1990:2017 Basis of structural design
2 ES EN 1998:2017 Design of structures for earthquake resistance-
3 ES EN 1992:2017 Part 1: General Rules -Seismic Actions and
Rules for Buildings
Design of concrete structures-Part 1-1
4 ES EN 1997:2017 General rules and rules for Buildings
Geotechnical design part 1: General rules
3
5. DESIGN LIFE
The following defines the Design Life Criteria applied to the Primary Structural Systems and
Primary Structural Elements of the project. The Revision History of the applicable criteria is noted
below.
The primary structural systems and elements of the building facilities employ the following
durability design working life limits as the structural engineering basis of design
Based on ES EN 1992:2015 Table4.1 ES-EN206-1 take the main exposure classes is XC which is risk of
carbonation induced corrosion. From this class the sub-class classification based on Environmental
condition for slab, Beam and column, foundation in XC3, XC4&XC2 respectively. Cover to
reinforcement, required to fulfill service life demands
ES EN 1992-1-:2015 4.4.1.2(6) the concrete should be increased by additive safety element ∆𝐶𝑑𝑢𝑟,𝛾 .the
recommended value is 0mm
ES EN1992-1-1:20154.4.1.2(7) ∆𝐶𝑑𝑢𝑟,𝑠𝑡 .without further specification is 0mm.
ES EN 1992-1-1:20154 4.4.1.2(8) for concrete with addition protection (coating) the minimum cover
may be reduced by ∆𝐶𝑑𝑢𝑟,𝑎𝑑𝑑 take 10mm
4
𝐶𝑚𝑖𝑛,𝑑𝑢𝑟 𝑓𝑜𝑟 𝑆4 20 30 25
∆𝐶𝑑𝑢𝑟,𝛾 0 0 0
∆𝐶𝑑𝑢𝑟,𝑠𝑡 0 0 0
∆𝐶𝑑𝑢𝑟,𝑎𝑑𝑑 -10 -10 0
∆𝐶𝑑𝑒𝑣 10 10 10
Concrete cover 20 30 50
5
5.4 Robustness
The structures will be designed for robustness in accordance with ES EN 1991-1-7:2017. The building
structure will be classified as consequence class 2 Upper risk group. Primary structure may be damaged but
will not collapse beyond the limits recommended by the standard.
Minimum fire rating criteria as per EN 1991-1-2:2004 were assumed to be 90 minutes. Concrete covers and
minimum member dimensions will govern this design.
6
k = Interior span k = 1.5 Slab supported on Column k= 1.2
fck = 20 24 28 32 20 24 28 32
r=ro 33.20288 34.40338 35.50735 36.5349 26.56231 27.522704 28.405881 29.227922
r=0.8ro 39.70145 41.52221 43.19657 44.75502 31.76116 33.217767 34.557253 35.804015
r=0.5ro 72.61358 77.57564 82.13872 86.38593 58.09086 62.060509 65.710974 69.108745
r=2ro, r'=0 26.91394 27.51419 18.71078 19.0533 21.53115 22.011352 18.710784 19.053301
r=3ro, r'=ro 27.61271 28.27966 22.09017 22.623724
r-4ro, r=1.5ro 26.51197 27.07385 21.20958 21.659082
r=5ro, r'=2ro 25.80584 26.30033 20.64467 21.04026
r=3ro, r'=0 25.21779 20.174235
Beams L/d = 26.71112 27.29201 21.36889 21.833604
Slabs L/d = 36.45217 37.96279 39.35196 40.64496 29.16173 30.370236 31.481567 32.515969
k = Cantilever k = 0.4
fck = 20 24 28 32
r=ro 8.854102 9.174235 9.468627 9.742641
r=0.8ro 10.58705 11.07259 11.51908 11.93467
r=0.5ro 19.36362 20.68684 21.90366 23.03625
ES EN1992:2015 7.4 Deflection Control. For Solid slab worst condition from panels 6000 end panel
& 5230mm one end continuous panel from Ground to Terrace Level.
Columns: -
Rectangular columns =500x950mm, 450x950mm, 450x900mm, 400x600mm,
400x900mm, 400x800mm, 400x750mm, 400x700mm, 400x600mm,
400x500mm,350x550mm, 350x500mm, & 350x450mm modification factors of the column
sections are summarized below on a tabulation together with other structural members.
Beams: - there are only a rectangular prismatic beam sections used in all framing systems. Section
assignment in modeling have to Report at Appendix.
For Basement- floor beams = 250x400mm
Floor Beams for those intended to support Solid slab = 250x400mm&300x400mm
7
Stair beam=250x400mm
Slabs: - the building has a floor system of solid Slab
Thickness of the solid slab t = 180mm&160mm
Property modification factors are used to reduce moment and torsion stiffness due to crack section. Torsional
stiffness of the cracked section should be set equal to 10% of the torsional stiffness of the un-cracked section.
Unless a more accurate analysis of the cracked elements is performed, the elastic flexural and shear stiffness
properties of concrete and masonry elements may be taken to be equal to one-half of the corresponding
stiffness of the un-cracked elements (ES EN1998:2015-1-1, cl. 4.3.1(7))
Column & Shear wall (Line Element) Beam (Line Element) Slab (Shell-thin Element)
Cross-section(axial) Area=1 Cross-section(axial) Area=1 Shell thin- 𝑓11 = 𝑓22 =0.05
Shear Area in 2 directions=0.5 Shear Area in 2 directions=0.5 Shell thin 𝑓12 =0.001
Shear Area in 3 directions=0.5 Shear Area in 3 directions=0.5 Banding 𝑚11 = 𝑚22 =0.05
Torsional Constant=0.1 Torsional Constant=0.1 Banding 𝑚12 = 0.001
𝐼22 = 𝐼33 = 0.5 𝐼22 = 𝐼33 = 0.5 𝑣13 = 𝑣23 = 0.05
In general, concrete frame, lateral displacement shall not exceed the following limits.
The structure will be designed such that overall sway wind loads with 10 years
return period shall not exceed H/500 (H• Building height).
Inter-story drift shall not exceed h/400(h-building story height) or 10mm
whichever is greater.
The crack width limit shall meet the criteria provided in ES EN 1992-1-1:2017.
6. Design Loads
The structure is subjected to different loading actions and combinations of them. Major loadings on the
structure are gravity loads due to superimposed dead loads and imposed loads on floors and lateral loads
due to wind and seismic actions. The following subsections describe the details of the gravity loads and
lateral Loads
8
6.1 Gravity Loads
Gravity loads are subdivided into structure self-weight, superimposed dead loads (SDL) and super imposed
live loads (LL) per ES EN 1991-1-1:2017 superimposed dead load includes partition walls, topping, screed,
finishes and services. Self-weight of materials to be calculated using the following unit weights. These
values would be used as guide wherever appropriate.
20cm 12kgs/piece
15cm 11kgs/piece
10cm 9-10kg/piece
Soil
1900kg//m3
Water
1000kg//m3
Stone/Tilling
2400kg//m 3
Live load includes floor loads as per occupancy, working weights of equipment, etc. Provision for live load
reductions given in ES EN 1991-1-1:2015 (section 6.3) will be also utilized for optimized design where
appropriate. Live Loads assumptions were assuming with respect the following assumptions:
Based on ES EN 1990:2002 (Basis of structural design) Pavilion bole apartments are to be design
to 50 years design life. It is important assumption as dictates number of other rules which must be
considered in structural design (material durability, reliability management or load return period).
The codes give the minimum requirements. All EC standards are based on empirical observations
from previous buildings. In those buildings designed for these loads do not fall. Buildings must be
designed to resist the maximum loads they are likely to be subjected to during some reference period
T, frequently for ordinary building, taken as 50 years.
9
Table6. 2Live Load Area Category According to ES EN 1991-1-1:2015
10
6.3 Super imposed Dead Loads (SDL)
Dead loads consist of the permanent construction material loads comprising the roof, floor, wall, and
foundation systems, including claddings, finishes, and fixed equipment. The anticipated loads are influenced
by a building's intended use (occupancy and function), configuration (size and shape), and location (climate
and site conditions). Loads provided in table below are typical form of construction.
All roofs with parapets shall be designed with multiple drains so that rainwater may not build up and
overload the roof in the case of a blocked primary drain during a major rain event (i.e. ultimate limit states
with and without accidental load scenarios will not be considered). Similarly, as applicable flat roofs shall
be designed to ensure that they are not susceptible to ponding.
It is envisaged that flood loads shall not be required to be considered in the structural design of the project.
As such, the buildings are sited at a level above the flood plain or have sufficient drainage provisions to
mitigate the risk of impact on the design of the structure.
The following sections describe the seismic load parameters employed in seismic analysis of this project.
The Importance Class reflects the relative importance assigned to a building based its occupancy category.
The recommended values in ES EN 1998:2017 for the importance factors associated with the various
importance classes are also presented in Table 4.3 of ES EN 1998:2017.
Accordingly, for the different importance classes, the design ground acceleration ag is equal to agR times
the importance factor γI. Apartment’s project was assigned to II Importance class which is characteristic
for typical residential buildings. Ethiopia, Addis Ababa Reference peak ground acceleration is 0.1g
Concrete buildings are classified as per their behavior under the effect of the horizontal seismic actions.
Flow Chart below presents approach of selection of the structural type
11
Figure 6. 1Classification of the structural system to a structural type
(Adopted from Euro code 8 compliant seismic analysis and design of RC Buildings)
For this project, it was classified as Dual system equivalent to frame system. Since Response Spectrum
analysis and a low behavior factor were opted for analysis, there was no need to classify the structure based
on the plan and elevation irregularities.
The choice of the behavior factor of this project was mainly governed by the client choice to have a building
that will remain nearly functional after an occurrence of design seismic event. The recommended use of
lower behavior factor to consider Irregularity. i.e. 3.12 for this project and adopting Ductility Class Medium.
Based on the soil investigation report, ground type B was selected for seismic calculations.
Elastic response spectra are grouped in two main categories. The first is characterized as Type 1 spectra and
the second as Type 2 spectra. Values for Type 1 spectra are given in Table 3.6 and are recommended for
regions affected mainly by earthquakes with a surface-wave magnitude Ms greater than 5.5. Values of Type
2 spectra are given in Table 3.7 and are recommended for regions affected mainly by earthquakes with a
surface-wave magnitude Ms not greater than 5.5 For this project seismic analysis Type 2 spectra are
assumed.
12
Figure 6. 2 Response Spectrum Function Definition
6.4.6 Displacements
Deformation of the building structure shall be calculated based on the elastic deformations of the
structural system multiplied by displacement behavior factor.
The “damage limitation requirement” is considered to have been satisfied, if under a seismic action having
a larger probability of occurrence than the design seismic action corresponding to the “no- collapse
requirement”. The damage limitation requirement should be verified in terms of the inter-story drift (dr).
The following limits shall be taken in assessment inter-story drift of the buildings:
Both UBC and EC8 codes account accidental torsional effects assuming that the mass is displaced from
the calculated center of mass, in each direction, a distance equal to 5 percent of the building dimension at
that level perpendicular to the direction of the force considered Li. In the UBC, when the static lateral-
force procedure is applied, the design eccentricity ed is, for regular buildings, equal to:
ed = eo + 0.05 Li
(1) Defining with eo as the eccentricity between the mass center MC and the stiffness center SC.
While for irregular buildings ed is equal to:
ed = eo + 0.05Ax Li
(2) Where
13
(3) While δmax is the maximum displacement at level x and δavg is the average of the displacements at
the extreme points of the structure at level x. The value of Ax must not exceed 3.0.When the dynamic
analysis is applied, in a spatial model the accidental effect can be taken into account using an appropriate
modification of MC or adding the torsional static effects given by the only accidental eccentricity to the
results of dynamic analysis. In the Euro code 8, when the simplified modal response spectrum analysis can
be applied, in a planar model the accidental torsional effects are considered by amplifying the action
effects in the individual load resisting elements, Fi, with a factor δ given by:
14
EQ+Y Direction EQ-Y Direction
Drifts Eccentricity Drifts Eccentricity
Story Dx Max drift Avg drift
Ratio Check Ax
% ABS
Story Dx Max drift Avg drift
Ratio Check Ax
% ABS
Water Tanker 123.67 0.00183 0.001589 1.152 Regular ok 0.05 ok Water Tanker 123.67 0.002012 0.001643 1.224 Irregular 1.0404 0.052 6.433
Roof Terrace 144.12 0.001973 0.001888 1.045 Regular ok 0.05 ok Roof Terrace 144.12 0.002332 0.001931 1.208 Irregular 1.0134 0.051 7.302
Tenth 144.12 0.002456 0.002306 1.065 Regular ok 0.05 ok Tenth 144.12 0.002636 0.00232 1.136 Regular ok 0.05 ok
Ninth 144.12 0.003201 0.002795 1.145 Regular ok 0.05 ok Ninth 144.12 0.003006 0.002779 1.082 Regular ok 0.05 ok
Eighth 144.12 0.003673 0.00317 1.159 Regular ok 0.05 ok Eighth 144.12 0.003384 0.003141 1.077 Regular ok 0.05 ok
Seventh 144.12 0.004242 0.003569 1.189 Regular ok 0.05 ok Seventh 144.12 0.003725 0.003519 1.059 Regular ok 0.05 ok
Sixth 144.12 0.004627 0.003842 1.204 Irregular 1.0067 0.050 7.254 Sixth 144.12 0.003973 0.003778 1.052 Regular ok 0.05 ok
Fifths 144.12 0.00495 0.004033 1.227 Irregular 1.0455 0.052 7.534 Fifths 144.12 0.004105 0.003952 1.039 Regular ok 0.05 ok
Fourth 144.12 0.005047 0.00405 1.246 Irregular 1.0781 0.054 7.769 Fourth 144.12 0.004067 0.003956 1.028 Regular ok 0.05 ok
Third 144.12 0.004924 0.003873 1.271 Irregular 1.1218 0.056 8.084 Third 144.12 0.003825 0.003768 1.015 Regular ok 0.05 ok
Second 144.12 0.004383 0.0034 1.289 Irregular 1.1538 0.058 8.315 Second 144.12 0.003318 0.003298 1.006 Regular ok 0.05 ok
First 144.12 0.003466 0.002637 1.314 Irregular 1.1990 0.060 8.640 First 144.12 0.002571 0.002548 1.009 Regular ok 0.05 ok
Ground 144.12 0.0021 0.001559 1.347 Irregular 1.2600 0.063 9.080 Ground 144.12 0.001554 0.001499 1.036 Regular ok 0.05 ok
Basement 144.12 0.000756 0.000536 1.411 Irregular 1.3826 0.069 9.963 Basement 144.12 0.000547 0.000512 1.07 Regular ok 0.05 ok
Max 0.069 9.963 Max 0.052 7.302
Note -So change All Ecc. Ratio in ETABS model for all diaphragm
This design approach used Response Spectrum Analysis for lateral load for checked the
regularity condition by seeing the mode displacement and mass participation ratio result that
describe in the report page-19, in a section of the seismic modal analysis.
This calculation presents the automatically generated lateral seismic loads for load pattern EFM-EQXT according to EUROCODE8 2004, as
calculated by ETABS.
Direction = X + Eccentricity Y
Structural Period
15
Factors and Coefficients
Seismic Response
Period Used W Fb
Direction
(sec) (kN) (kN)
X + Ecc. Y 3.988 59436.9357 1188.7387
16
6.6 Geometric imperfections
ES EN 1992-1-1:2015 sec (5.2(1)). The unfavorable effects of possible deviations in the geometry of the
structure and the position of loads shall be taken into account in the analysis of members and structures.
Imperfections may be represented by an inclination, I, given by:
i 0 h m
Note: For use of 0 refer the National Annex. The recommended value for 0 is 1/200.
Effect on floor diaphragm, (see ES EN 1992-1-1:2015):
H i θ i (N b N a ) / 2
Effect on roof diaphragm, (see ES EN 1992-1-1:2015:
H i θi N a
Where Na and Nb are longitudinal forces contributing to Hi. (Imp-X&Imp-Y horizontal load applied on
center of diaphragm
Figure 6. 3Imperfection Loads
0 h m I m N i Hi
Water TankerGravity for Sesmic Top 880.2465 0.005 1 0.745356 3.2 9 880.2465 0.003727 3.280485
Roof TerraceGravity for Sesmic Top 5446.747 0.005 1 0.724569 3.2 20 2283.25 0.003623 8.27186
Tenth Gravity for Sesmic Top 11500.88 0.005 1 0.724569 3.2 20 3027.065 0.003623 10.96659
Ninth Gravity for Sesmic Top 17561.19 0.005 1 0.724569 3.2 20 3030.154 0.003623 10.97778
Eighth Gravity for Sesmic Top 23615.43 0.005 1 0.724569 3.2 20 3027.124 0.003623 10.9668
Seventh Gravity for Sesmic Top 29753.86 0.005 1 0.724569 3.2 20 3069.212 0.003623 11.11928
Sixth Gravity for Sesmic Top 35881.65 0.005 1 0.724569 3.2 20 3063.898 0.003623 11.10002
Fifths Gravity for Sesmic Top 42085.43 0.005 1 0.724569 3.2 20 3101.886 0.003623 11.23765
Fourth Gravity for Sesmic Top 48286.26 0.005 1 0.724569 3.2 20 3100.418 0.003623 11.23233
Third Gravity for Sesmic Top 54559.68 0.005 1 0.724569 3.2 20 3136.707 0.003623 11.3638
Second Gravity for Sesmic Top 60828.03 0.005 1 0.724569 3.2 20 3134.177 0.003623 11.35463
First Gravity for Sesmic Top 67198.37 0.005 1 0.724569 3.2 20 3185.172 0.003623 11.53938
Ground Gravity for Sesmic Top 72843.91 0.005 1 0.724569 2.88 20 2822.768 0.003623 10.22645
Basement Gravity for Sesmic Top 75599.62 0.005 1 0.724569 2 20 1377.855 0.003623 4.991755
P-delta analysis is considered on the model by defining the P-delta load of a combination of serviceable
loads of dead load with load multiplier of live load and partition load with a load multiplier of 0.3, by
reducing the live load effect by 30 % and with convergence ratio of 0.001. This analysis is done to
consider the second order effect caused by sway of the frame system which the model inherently considers
the second order moment on columns.
17
6.8 Beam-Column Joint for Local Ductility Requirement
To provide the appropriate amount of ductility in ductility classes M and H, specific provisions for all
structural elements shall be satisfied in each class (see ES EN1998:2015 5.4-5.6). In correspondence with
the different available ductility in the two ductility classes, different values of the behavior factor q are
used for each class (ES EN1998:2015 see 5.2.2.2). The upper limit value of the behavior factor q,
introduced in ES EN1998:2015 3.2.2.5(3) to account for energy dissipation capacity, shall be derived for
each design direction as follows:
ES EN1998-1:20155.5.4
7 Load Combination
Based on ES EN1998:2014 4.3.3.5 Combination of the effects of the components of the seismic action For
Equivalent Static & Response Spectrum Analysis for Ultimate limit state (ULS) each have 64 load
combinations and for geometry imperfection, Gravity, Serviceability and total around 134 Load
Combination used in ETABS model.
18
Table 7.1 Load pattern and Load case
SEISMIC1-7.DL+𝜑𝑖 LL±EQX±0.3EQY±𝐼𝑀𝑃𝑋&𝑌
SEISMIC8-15.DL+ 𝜑𝑖LL±EQX±0.3EQY±𝐼𝑀𝑃𝑋&𝑌
SEISMIC16-24.DL+𝜑𝑖 LL±EQX±0.3EQY±𝐼𝑀𝑃𝑋&𝑌
SEISMIC25-32.DL+ 𝜑𝑖LL±EQX±0.3EQY±𝐼𝑀𝑃𝑋&𝑌
SEISMIC33-40.DL+ 𝜑𝑖 LL±EQY±0.3EQX±𝐼𝑀𝑃𝑋&𝑌
SEISMIC41-48.DL+ 𝜑𝑖 LL±EQY±0.3EQX±𝐼𝑀𝑃𝑋&𝑌
SEISMIC49-56.DL+ 𝜑𝑖 LL±EQY±0.3EQX±𝐼𝑀𝑃𝑋&𝑌
SEISMIC57-64.DL 𝜑𝑖 +LL±EQY±0.3EQX±𝐼𝑀𝑃𝑋&𝑌
Only Imperfection .DL+ 𝜑𝑖 LL±𝐼𝑀𝑃𝑋&𝑌
GQ.1.35DL+1.5LL
For PDelta. DL+ 𝜑𝑖 LL
Note –𝑽𝒂𝒍𝒖𝒆𝒔 𝒐𝒇 𝝋𝒊 ES EN 1990, 2015 for different categories of imposed loads
19
8 RESULTS AND CHECKS
In this project, Modal-Ritz analysis was employed for modal analysis of the building. Ritz vectors can
provide a better basis than do Eigenvectors when used for response-spectrum or time-history analyses that
are based on modal superposition. Figure below indicates that the sum of the effective modal masses for
the modes considered amounts to at least 90% of the total mass of the structure.
8.2 Check Story Drift for Damage limitations & Inter-story Drift Sensitivity
𝑃𝑡𝑜𝑡 . 𝑑𝑟
𝜃=
𝑉𝑡𝑜𝑡 . ℎ
𝜃: is the interstorey drift sensitivity coefficient, 𝑑𝑟 : 𝑖𝑠 𝑡ℎ𝑒 𝑖𝑛𝑡𝑒𝑟𝑠𝑡𝑜𝑟𝑦 𝑑𝑟𝑖𝑓𝑡, ℎ: 𝑖𝑠 𝑡ℎ𝑒 𝑠𝑡𝑜𝑟𝑦 ℎ𝑒𝑖𝑔ℎ𝑡,
𝑉𝑡𝑜𝑡 : 𝑖𝑠 𝑡ℎ𝑒 𝑡𝑜𝑡𝑎𝑙 𝑠𝑒𝑖𝑠𝑚𝑖𝑐 𝑠𝑡𝑜𝑟𝑦 𝑠ℎ𝑒𝑎𝑟
𝑝𝑡𝑜𝑡 : 𝑖𝑠 𝑡ℎ𝑒𝑡𝑜𝑡𝑎𝑙 𝑔𝑟𝑎𝑣𝑖𝑡𝑦 𝑙𝑜𝑎𝑑 𝑎𝑡 𝑎𝑚𝑑 𝑎𝑏𝑜𝑣𝑒 𝑠𝑡𝑜𝑟𝑦 𝑐𝑜𝑛𝑠𝑖𝑑𝑒𝑟𝑒𝑑 𝑖𝑛 𝑡ℎ𝑒 𝑠𝑒𝑖𝑠𝑚𝑖𝑐 𝑑𝑒𝑠𝑖𝑔𝑛 𝑠𝑖𝑡𝑢𝑎𝑡𝑖𝑜𝑛 𝐺
+ 0.3
20
8.3 Check the model for any warning
21
8.4 Normalized axial force check and verified axial compression ratio
22
23
Table8. 1Foundation Load Group
24
8.7 Bending moment diagram &Shear force diagram in the Appendix
8.8 Beam and Column Reinforcement in Appendix
8.9 Beam column capacity Ratio in Appendix
8.10 Shear Plus Torsion Reinforcement Design for beam
Table8. 2 Shear Plus Torsional Stirrup Details
Shear
Stirrup Stirrup Stirrup Stirrup Stirrup Stirrup
Plus Maximu
spacing spacing spacing spacing spacing spacing
Torsion m
Dia- Dia- for for for for for for
Beam ID mm²/m Dia-8 spacing Zone Spacing Lcr=1.5D
10 12 single single single double double double
from (Smax<
leg DIA- leg DIA- leg DIA- leg DIA- leg DIA- leg DIA-
Etabs 0.75d)
8 10 12 8 10 12
output
Basement Beams
178.89 50.2 78.5 113 561.69 877.63 1263.8 842.529 1316.5 1895.7 200 A ST-1-8/200
All BB 178.89 50.2 78.5 113 561.69 877.63 1263.8 842.529 1316.5 1895.7 200 B ST-1-8/200
ST-1-8/100
(25/40) 178.89 50.2 78.5 113 561.69 877.63 1263.8 842.529 1316.5 1895.7 200 C ST-1-8/200
812.78 50.2 78.5 113 123.63 193.16 278.16 185.438 289.75 417.23 200 D ST-1-8/120
Ground Floor Beams
178.89 50.2 78.5 113 561.69 877.63 1263.8 842.529 1316.5 1895.7 200 A ST-1-8/200
GFB-1 178.89 50.2 78.5 113 561.69 877.63 1263.8 842.529 1316.5 1895.7 200 B ST-1-8/200
ST-1-8/100
(25/40) 178.89 50.2 78.5 113 561.69 877.63 1263.8 842.529 1316.5 1895.7 200 C ST-1-8/200
211.35 50.2 78.5 113 475.42 742.84 1069.7 713.13 1114.3 1604.5 200 C ST-1-8/200
336.76 50.2 78.5 113 298.37 466.21 671.34 447.559 699.31 1007 200 A ST-1-8/200
GFB-2 232.61 50.2 78.5 113 431.97 674.95 971.93 647.952 1012.4 1457.9 200 B ST-1-8/200
(25/40) 372.81 50.2 78.5 113 269.52 421.13 606.42 404.281 631.69 909.63 200 C ST-1-8/200
ST-1-8/100
476.85 50.2 78.5 113 210.72 329.24 474.11 316.074 493.87 711.17 200 D ST-1-8/200
GFB-2 511.59 50.2 78.5 113 196.41 306.89 441.92 294.611 460.33 662.87 200 B ST-1-8/190
B/N 1-2 (25/40) 954.51 50.2 78.5 113 105.27 164.48 236.85 157.903 246.72 355.28 200 C ST-1-8/100
194.47 50.2 78.5 113 516.69 807.32 1162.5 775.03 1211 1743.8 200 B ST-1-8/200
GFB-3
360.72 50.2 78.5 113 278.55 435.24 626.75 417.831 652.86 940.12 200 C ST-1-8/200
(25/40)
435.2 50.2 78.5 113 230.88 360.75 519.49 346.324 541.13 779.23 200 D ST-1-8/200
ST-1-8/100
415.56 50.2 78.5 113 241.79 377.8 544.04 362.691 566.71 816.06 201 A ST-1-8/200
GFB-3
302.21 50.2 78.5 113 332.48 519.51 748.09 498.726 779.26 1122.1 202 B ST-1-8/200
B/N 3-4 (25/40)
511.12 50.2 78.5 113 196.59 307.17 442.32 294.882 460.75 663.48 203 C ST-1-8/190
178.89 50.2 78.5 113 561.69 877.63 1263.8 842.529 1316.5 1895.7 200 B ST-1-8/200
GFB-4
178.89 50.2 78.5 113 561.69 877.63 1263.8 842.529 1316.5 1895.7 200 C ST-1-8/200 ST-1-8/100
(25/40)
178.89 50.2 78.5 113 561.69 877.63 1263.8 842.529 1316.5 1895.7 200 D ST-1-8/200
344.09 50.2 78.5 113 292.02 456.28 657.04 438.025 684.41 985.56 200 A ST-2-8/200
GFB-5
232.83 50.2 78.5 113 431.56 674.31 971.01 647.339 1011.5 1456.5 200 B ST-2-8/200
(30/40)
472.08 50.2 78.5 113 212.85 332.57 478.9 319.268 498.86 718.35 200 C ST-2-8/200
ST-2-8/100
472.03 50.2 78.5 113 212.87 332.61 478.95 319.302 498.91 718.43 201 A ST-2-8/200
GFB-5
325.9 50.2 78.5 113 308.32 481.74 693.71 462.473 722.61 1040.6 202 B ST-2-8/200
B/N D-C(25/40)
559.05 50.2 78.5 113 179.73 280.83 404.4 269.6 421.25 606.6 203 C ST-2-8/170
347.6 50.2 78.5 113 289.07 451.67 650.4 433.602 677.5 975.6 200 A ST-2-8/200
GFB-6
231.22 50.2 78.5 113 434.56 679.01 977.77 651.847 1018.5 1466.7 200 B ST-2-8/200 ST-2-8/100
(30/40)
398.64 50.2 78.5 113 252.06 393.84 567.13 378.085 590.76 850.69 200 C ST-2-8/200
338.04 50.2 78.5 113 297.24 464.44 668.8 445.864 696.66 1003.2 200 A ST-2-8/200
GFB-7
193.18 50.2 78.5 113 520.14 812.71 1170.3 780.205 1219.1 1755.5 200 B ST-2-8/200 ST-2-8/100
(25/40)
484.42 50.2 78.5 113 207.42 324.1 466.7 311.135 486.15 700.05 200 C ST-2-8/200
25
First-Tenth Floor Beams
572.64 50.2 78.5 113 175.47 274.17 394.8 263.202 411.25 592.2 200 A ST-1-8/170
F-T FB-1 277.6 50.2 78.5 113 361.96 565.56 814.41 542.939 848.34 1221.6 200 B ST-1-8/200
ST-1-8/100
(25/40) 578.06 50.2 78.5 113 173.82 271.6 391.1 260.734 407.4 586.65 200 C ST-1-8/170
192.09 50.2 78.5 113 523.09 817.33 1176.9 784.632 1226 1765.4 200 D ST-1-8/200
442.21 50.2 78.5 113 227.22 355.03 511.25 340.834 532.55 766.88 200 A ST-1-8/200
F-T FB-2
274.04 50.2 78.5 113 366.66 572.91 824.99 549.993 859.36 1237.5 200 B ST-1-8/200
(25/40)
434.46 50.2 78.5 113 231.28 361.37 520.37 346.913 542.05 780.56 200 C ST-1-8/200
ST-1-8/100
605.94 50.2 78.5 113 165.82 259.1 373.11 248.737 388.65 559.66 200 C ST-1-8/160
F-T FB-2
684.02 50.2 78.5 113 146.9 229.53 330.52 220.344 344.29 495.77 200 C ST-1-8/140
B/N AXI 1&2
685.27 50.2 78.5 113 146.63 229.11 329.91 219.943 343.66 494.87 200 C ST-1-8/140
463.69 50.2 78.5 113 216.7 338.59 487.57 325.045 507.88 731.35 200 A ST-1-8/200
F-T FB-3
287.54 50.2 78.5 113 349.45 546.01 786.26 524.171 819.02 1179.4 200 B ST-1-8/200 ST-1-8/100
(25/40)
437.04 50.2 78.5 113 229.91 359.23 517.3 344.865 538.85 775.95 200 C ST-1-8/200
557.3 50.2 78.5 113 180.3 281.72 405.67 270.447 422.57 608.51 200 A ST-2-8/180
F-T FB-4
295.45 50.2 78.5 113 340.09 531.39 765.21 510.137 797.09 1147.8 200 B ST-2-8/200 ST-2-8/100
(30/40)
505.19 50.2 78.5 113 198.9 310.77 447.51 298.343 466.16 671.27 200 C ST-2-8/190
F-T FB-5 291.28 50.2 78.5 113 344.96 539 776.16 517.44 808.5 1164.2 200 B ST-2-8/200
(30/40) 418.63 50.2 78.5 113 240.02 375.03 540.05 360.032 562.55 810.07 200 C ST-2-8/200
F-T FB-5 B/N 802.25 50.2 78.5 113 125.25 195.7 281.81 187.872 293.55 422.71 201 A ST-2-8/110 ST-2-8/100
AXIS A&B D&E 863.01 50.2 78.5 113 116.43 181.92 261.97 174.645 272.88 392.95 202 B ST-2-8/110
(30/40) 459.87 50.2 78.5 113 218.5 341.4 491.62 327.745 512.1 737.43 203 C ST-2-8/200
488.01 50.2 78.5 113 205.9 321.71 463.27 308.846 482.57 694.9 200 A ST-2-8/200
F-T FB-6
274.85 50.2 78.5 113 365.58 571.22 822.56 548.372 856.83 1233.8 200 B ST-2-8/200 ST-2-8/100
(30/40)
540.76 50.2 78.5 113 185.81 290.33 418.08 278.719 435.5 627.12 200 C ST-2-8/180
436.74 50.2 78.5 113 230.07 359.48 517.65 345.102 539.22 776.48 200 A ST-1-8/200
F-T FB-7
341.04 50.2 78.5 113 294.63 460.36 662.91 441.942 690.53 994.37 200 B ST-1-8/200 ST-1-8/100
(25/40)
655.28 50.2 78.5 113 153.34 239.59 345.01 230.009 359.39 517.52 200 C ST-1-8/150
Roof Terrace Floor Beams
540.06 50.2 78.5 113 186.05 290.71 418.62 279.08 436.06 627.93 200 A ST-1-8/180
RTFB-1 314.09 50.2 78.5 113 319.91 499.86 719.79 479.862 749.79 1079.7 200 B ST-1-8/200
ST-1-8/100
(25/40) 604.08 50.2 78.5 113 166.34 259.9 374.26 249.503 389.85 561.38 200 C ST-1-8/160
178.89 50.2 78.5 113 561.69 877.63 1263.8 842.529 1316.5 1895.7 200 D ST-1-8/200
430.8 50.2 78.5 113 233.24 364.44 524.79 349.861 546.66 787.19 200 A ST-1-8/200
RTFB-2
259.08 50.2 78.5 113 387.83 605.99 872.63 581.751 908.99 1308.9 200 B ST-1-8/200
(25/40)
434.94 50.2 78.5 113 231.02 360.97 519.8 346.531 541.45 779.69 200 C ST-1-8/200
ST-1-8/100
702.02 50.2 78.5 113 143.13 223.64 322.04 214.695 335.46 483.06 200 B ST-1-8/120
RTFB-2
800.03 50.2 78.5 113 125.6 196.24 282.59 188.393 294.36 423.88 200 C ST-1-8/120
B/N AXI 1&2
800.3 50.2 78.5 113 125.55 196.18 282.49 188.329 294.26 423.74 200 C ST-1-8/120
452.66 50.2 78.5 113 221.98 346.84 499.45 332.965 520.26 749.17 200 A ST-1-8/200
RTFB-3
260.18 50.2 78.5 113 386.19 603.43 868.94 579.291 905.14 1303.4 200 B ST-1-8/200 ST-1-8/100
(25/40)
433.9 50.2 78.5 113 231.57 361.83 521.04 347.361 542.75 781.56 200 C ST-1-8/200
422.82 50.2 78.5 113 237.64 371.32 534.7 356.464 556.97 802.04 200 A ST-2-8/200
RTFB-4
224.49 50.2 78.5 113 447.59 699.36 1007.1 671.388 1049 1510.6 200 B ST-2-8/200 ST-2-8/100
(30/40)
491.43 50.2 78.5 113 204.46 319.48 460.05 306.697 479.21 690.07 200 C ST-2-8/200
RTFB-5 294.8 50.2 78.5 113 340.84 532.56 766.89 511.262 798.85 1150.3 200 B ST-2-8/200
(30/40) 487.5 50.2 78.5 113 206.11 322.05 463.75 309.169 483.08 695.63 200 C ST-2-8/200
F-T FB-5 B/N 689.17 50.2 78.5 113 145.8 227.81 328.05 218.698 341.72 492.07 201 A ST-2-8/140 ST-2-8/100
AXIS A&B D&E 684.41 50.2 78.5 113 146.81 229.39 330.33 220.219 344.09 495.49 202 B ST-2-8/140
(30/40) 448.18 50.2 78.5 113 224.2 350.31 504.44 336.293 525.46 756.66 203 C ST-2-8/200
438.87 50.2 78.5 113 228.95 357.74 515.14 343.427 536.61 772.71 200 A ST-2-8/200
RTFB-6
270.8 50.2 78.5 113 371.05 579.76 834.86 556.573 869.65 1252.3 200 B ST-2-8/200 ST-2-8/100
(30/40)
457.65 50.2 78.5 113 219.56 343.06 494 329.335 514.59 741 200 C ST-2-8/180
463.22 50.2 78.5 113 216.92 338.93 488.06 325.375 508.4 732.09 200 A ST-1-8/200
RTFB-7
439.59 50.2 78.5 113 228.58 357.15 514.3 342.865 535.73 771.45 200 B ST-1-8/200 ST-1-8/100
(25/40)
734.58 50.2 78.5 113 136.79 213.73 307.77 205.178 320.59 461.65 200 C ST-1-8/130
Water Tanker Beams
956.5 50.2 78.5 113 105.05 164.14 236.36 157.574 246.21 354.54 200 A ST-1-8/100
WTB-1
545.56 50.2 78.5 113 184.18 287.78 414.4 276.267 431.67 621.6 200 B ST-1-8/180 ST-1-8/100
(25/40)
888.27 50.2 78.5 113 113.12 176.75 254.52 169.678 265.12 381.78 200 C ST-1-8/100
732.37 50.2 78.5 113 137.2 214.37 308.7 205.798 321.56 463.04 200 A ST-1-8/130
WTB-2
560.67 50.2 78.5 113 179.21 280.02 403.23 268.821 420.03 604.85 200 B ST-1-8/180 ST-1-8/100
(25/40)
731.58 50.2 78.5 113 137.35 214.6 309.03 206.02 321.91 463.54 200 C ST-1-8/130
854.2 50.2 78.5 113 117.63 183.8 264.67 176.446 275.7 397 200 A ST-1-8/120
WTB-3
571.82 50.2 78.5 113 175.72 274.56 395.37 263.579 411.84 593.05 200 B ST-1-8/170 ST-1-8/100
(25/40)
714.1 50.2 78.5 113 140.71 219.86 316.59 211.063 329.79 474.89 200 C ST-1-8/140
400.035 50.2 78.5 113 251.18 392.47 565.15 376.767 588.7 847.73 200 A ST-1-8/200
WTB-4
213.7 50.2 78.5 113 470.19 734.67 1057.9 705.288 1102 1586.9 200 B ST-1-8/200 ST-1-8/100
(25/40)
372.81 50.2 78.5 113 269.52 421.13 606.42 404.281 631.69 909.63 200 C ST-1-8/200
26
8.11 Retaining wall analysis and design
The retaining wall is of a shear wall system resisting the retained granular fill by an out of plane bending of
the membrane as similar as slab systems. It is recommended to retain a granular fill than well compacted
selected fill behind the retaining to minimize the hydrostatic pressure that the water is permitted to percolate
through the granular fill and be rid of by the provided sub surface drainage system (installed perforated
pipes). Hence the retaining is intended to support only the granular fill. Characteristic properties of materials
Unit weight of granular fill = 27 KN/m3
Angle of shearing resistance Ø𝑘 = 300
Compressive strength of concrete = C20/25
Rankine active earth pressure = 𝐾𝑎𝑑 = (cos𝐵-v𝑠𝑖𝑛2Ø𝑑𝑓-𝑠𝑖𝑛2𝐵cos𝐵+v𝑠𝑖𝑛2Ø𝑑𝑓-𝑠𝑖𝑛2𝐵) cos B Ø𝑑𝑓=𝑡𝑎𝑛-1
(tanØ𝑘𝛾) = 240
𝐾𝑎𝑑 = 0.4 5Active earth pressure isnPad = 𝐾𝑎𝑑 (𝛾*h22+𝛾 𝑞 h) q is surcharge load, assuming 80 kg vibrating
plate having 14 KN/M
Pad = 27 KN/M2 Assigning this load as a uniform load and perform the analysis following all the
procedures that has to be obeyed while designing wall structures. And please refer the detail on
the structural drawing.
The Design output in Appendix
8.11.1 Soil protection
I recommend RHS Steel temporary or shoring soil protection like its displays in drawing and
detail design and modification is free for Geotechnical engineer or other foundation specialist.
27
ETABS 19.1.0 8/20/2023
A B LY LY C D E
6 (m) 0.8 (m) 1.8 (m) 3.4 (m) 6 (m) 6 (m)
BB(25/40)
BB(25/40)
BB(25/40)
BB(25/40)
1.6 (m)
LX LSW-20
BB(25/40)
BB(25/40)
BB(25/40)
BB(25/40)
BB(25/40)
1.9 (m)
LSW-20 LSW-20
LX LSW-20
1.8 (m)
Land-20
BB(25/40) Land-20
BB(25/40) BB(25/40) BB(25/40)
2
BB(25/40)
BB(25/40)
BB(25/40)
BB(25/40)
BB(25/40)
5.2 (m)
BB(25/40)
BB(25/40)
BB(25/40)
BB(25/40)
6 (m)
A B LY LY C D E
6 (m) 0.8 (m) 1.8 (m) 3.4 (m) 6 (m) 6 (m)
GFB(25/40)
GFB(25/40)
GFB(25/40)
GFB(25/40)
1.6 (m)
Land-20
Land-20
LX LSW-20
GFB(25/40)
GFB(25/40)
GFB(25/40)
GFB(25/40)
GFB(25/40)
1.9 (m)
GFB(25/40)
GFB(25/40)
GFB(25/40)
GFB(25/40)
5.2 (m)
GFB(25/40)
GFB(25/40)
GFB(25/40)
GFB(25/40)
6 (m)
A B LY LY C D E
6 (m) 0.8 (m) 1.8 (m) 3.4 (m) 6 (m) 6 (m)
1'
FB(25/40)
FB(25/40)
1.6 (m)
FS-16 FS-16
FB(25/40) STB(25/40)
FB(25/40) FB(25/40) FB(25/40)
1
1.53 (m)
Land-16
Land-16
LX LSW-20
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
1.9 (m)
LSW-20 LSW-20
FS-16 FS-16 FS-16
FS-16
LX LSW-20
1.8 (m)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
5.2 (m)
FS-16
FS-16 FS-16 FS-16 EB(20/40)
EB(20/40)
FB(30/40) FB(30/40) FB(30/40) FB(30/40)
3
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
6 (m)
A B LY LY C D E
6 (m) 0.8 (m) 1.8 (m) 3.4 (m) 6 (m) 6 (m)
1'
FB(25/40)
FB(25/40)
1.6 (m)
FS-16 FS-16
FB(25/40) STB(25/40)
FB(25/40) FB(25/40) FB(25/40)
1
1.53 (m)
Land-16
Land-16
LX LSW-20
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
1.9 (m)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
5.2 (m)
FS-16 FS-16
EB(20/40) FS-16 FS-16 EB(20/40)
EB(20/40)
EB(20/40)
FB(30/40) FB(30/40) FB(30/40) FB(30/40)
3
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
6 (m)
A B LY LY C D E
6 (m) 0.8 (m) 1.8 (m) 3.4 (m) 6 (m) 6 (m)
1'
FB(25/40)
FB(25/40)
1.6 (m)
FS-16 FS-16
FB(25/40) STB(25/40)
FB(25/40) FB(25/40) FB(25/40)
1
1.53 (m)
Land-16
Land-16
LX LSW-20
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
1.9 (m)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
5.2 (m)
FS-16 FS-16
EB(20/40) FS-16 FS-16 EB(20/40)
EB(20/40)
EB(20/40)
FB(30/40) FB(30/40) FB(30/40) FB(30/40)
3
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
6 (m)
A B LY LY C D E
6 (m) 0.8 (m) 1.8 (m) 3.4 (m) 6 (m) 6 (m)
1'
TTB(25/40)
TTB(25/40)
1.6 (m)
FS-16 FS-16
TTB(25/40) TTB(25/40)
TTB(25/40) TTB(25/40) TTB(25/40)
1
1.53 (m)
Land-16
Land-16
LX LSW-20
TTB(25/40)
TTB(25/40)
TTB(25/40)
TTB(25/40)
TTB(25/40)
1.9 (m)
TTB(25/40)
TTB(25/40)
TTB(25/40)
TTB(25/40)
5.2 (m)
FS-16 FS-16
EB(20/40) FS-16 FS-16 TTB(25/40)
TTB(25/40)
EB(20/40)
TTB(25/40)
TTB(25/40)
TTB(25/40)
TTB(25/40)
6 (m)
A B LY LY C D E
6 (m) 0.8 (m) 1.8 (m) 3.4 (m) 6 (m) 6 (m)
1'
1.6 (m)
WTB(25/40) WTB(25/40)
1
1.53 (m)
LX LSW-20
WTB(25/40)
WTB(25/40)
WTB(25/40)
1.9 (m)
LSW-20 LSW-20
WTS-15 WTS-15
LX LSW-20
1.8 (m)
WTB(25/40) WTB(25/40)
2
WTB(25/40)
WTB(25/40)
WTB(25/40)
5.2 (m)
WTS-15 WTS-15
WTB(25/40) WTB(25/40)
3
6 (m)
4 X
3
RC unit wt- 25 KN/M Width of Staircase 1.5 m
Steps Area(Triangle) 0.0232 m2
Span, L= 5230 mm Landing(cantilever), Lc= 0 mm Volume 0.0348 m3
Geometry
Cover= 15 mm Lf
Use ES Lc
ßa= 30.4 d= 172.18 mm Right
D
EN1992-2015
D= 200.0 Thus ,deff= 178.00 mm
Dmin= 160.00 mm
W.slab 5.86 Left
∑Dead load 9.61
Loading Steps 2.00 Factored
F.finish 1.75 Live Load 3.00 load, Pd= 19.28 KN/M
2
Moment
3
RC unit wt- 25 KN/M 0.0232 m2
Steps Area(Triangle)
Volume 0.0348 m3
Span, L= 5230 mm Landing(cantilever), Lc= 0 mm Density of Concrete 25 KN/m3
Geometry
Cover= 15 mm
Use ES
ßa= 39.5 d= 133.78 mm Lf
EN1992-2015 Lc
Right
D
D= 160.0 Thus ,deff= 138.00 mm
Dmin= 150.00 mm
W.slab 4.69
∑Dead load 8.44
Loading Steps 2.00 Factored Left
F.finish 1.75 Live Load 3.00 load, Pd= 17.41 KN/M
2
Moment
1 1 1 1 1 1 1
A B LY LY C D E
RC(35/45)C-25
RC(35/45)C-25
RC(35/45)C-25
10
RC(35/45)C-25
RC(35/45)C-25
RC(35/45)C-25
RC(35/45)C-25
10 TTB(25/40) 10 10
RC(35/45)C-25
RC(35/45)C-25
RC(35/45)C-25
RC(35/45)C-25
10 STB(25/40) 10 10
RC(35/45)C-25
RC(35/45)C-25
RC(35/50)C-25
RC(35/45)C-25
10 STB(25/40) 10 10
RC(35/50)C-25
RC(35/50)C-25
RC(35/50)C-25
RC(35/55)C-25
10 STB(25/40) 10 10
RC(35/50)C-25
RC(35/50)C-25
RC(40/60)C-25
RC(35/55)C-25
10 STB(25/40) 10 10
RC(40/60)C-25
RC(40/60)C-25
RC(40/60)C-25
RC(35/55)C-30
10 STB(25/40) 10 10
RC(40/60)C-30
RC(40/60)C-30
RC(40/60)C-30
10 STB(25/40) 10 10 RC(35/55)C-30
RC(40/70)C-30
RC(40/70)C-30
RC(40/70)C-30
RC(40/60)C-30
10 STB(25/40) 10 10
RC(40/70)C-30
RC(40/70)C-30
RC(40/70)C-30
RC(40/60)C-30
10 STB(25/40) 10 10
RC(40/80)C-30
RC(40/80)C-30
RC(40/80)C-30
RC(40/60)C-40
10 STB(25/40) 10 10
RC(40/80)C-40
RC(40/80)C-40
RC(40/80)C-40
RC(40/75)C-40
10 STB(25/40) 10 10
RC(40/90)C-40
RC(40/90)C-40
RC(40/90)C-40
RC(40/75)C-40
10 STB(25/40)
X 5
RC(40/90)C-40
RC(40/90)C-40
RC(40/90)C-40
RC(40/75)C-40
Base
Z
A
ETABS 19.1.0
X
10
10
10
10
10
10
10
10
10
10
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
BB(25/40)
TTB(30/40)
GFB(30/40)
RC(50/95)C-40 RC(50/95)C-40 RC(45/95)C-40 RC(45/95)C-40 RC(45/95)C-30 RC(45/90)C-30 RC(45/90)C-30 RC(40/75)C-30 RC(40/75)C-25 RC(40/60)C-25 RC(40/60)C-25 RC(40/50)C-25 RC(40/50)C-25 RC(40/50)C-25
2
2
B LY
LY
10
10
10
10
10
10
10
10
10
10
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
BB(25/40)
TTB(30/40)
GFB(30/40)
WTB(25/40)
RC(50/95)C-40 RC(50/95)C-40 RC(45/95)C-40 RC(45/95)C-40 RC(45/95)C-40 RC(45/90)C-30 RC(45/90)C-30 RC(40/75)C-30 RC(40/75)C-30 RC(40/60)C-30 RC(40/60)C-25 RC(40/50)C-25 RC(40/50)C-25 RC(40/50)C-25
2
10
10
10
10
10
10
10
10
10
10
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
BB(25/40)
TTB(30/40)
GFB(30/40)
WTB(25/40)
RC(50/95)C-40 RC(50/95)C-40 RC(45/95)C-40 RC(45/95)C-40 RC(45/95)C-30 RC(45/90)C-30 RC(45/90)C-30 RC(40/75)C-30 RC(40/75)C-25 RC(40/60)C-25 RC(40/60)C-25 RC(40/50)C-25 RC(40/50)C-25 RC(40/50)C-25
2
10
10
10
10
10
10
10
10
10
10
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
BB(25/40)
TTB(30/40)
GFB(30/40)
First
Base
Sixth
Third
Ninth
Fifths
Tenth
Eighth
Fourth
Ground
Second
Seventh
Basement
Roof Terrace
Water Tanker
8/20/2023
RC(40/75)C-40 RC(40/75)C-40 RC(40/75)C-40 RC(40/60)C-40 RC(40/60)C-40 RC(40/60)C-30 RC(35/55)C-30 RC(35/55)C-30 RC(35/55)C-25 RC(35/55)C-25 RC(35/45)C-25 RC(35/45)C-25 RC(35/45)C-25
3
Z
A
ETABS 19.1.0
X
10
10
10
10
10
10
10
10
10
10
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
BB(25/40)
TTB(30/40)
GFB(30/40)
RC(50/95)C-40 RC(50/95)C-40 RC(45/95)C-40 RC(45/95)C-40 RC(45/95)C-30 RC(45/90)C-30 RC(45/90)C-30 RC(40/75)C-30 RC(40/75)C-25 RC(40/60)C-25 RC(40/60)C-25 RC(40/50)C-25 RC(40/50)C-25 RC(40/50)C-25
3
3
B LY
LY
10
10
10
10
10
10
10
10
10
10
10
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
BB(25/40)
TTB(30/40)
GFB(30/40)
WTB(25/40)
RC(50/95)C-40 RC(50/95)C-40 RC(45/95)C-40 RC(45/95)C-40 RC(45/95)C-30 RC(45/90)C-30 RC(45/90)C-30 RC(40/75)C-30 RC(40/75)C-25 RC(40/60)C-25 RC(40/60)C-25 RC(40/50)C-25 RC(40/50)C-25 RC(40/50)C-25
3
10
10
10
10
10
10
10
10
10
10
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
BB(25/40)
TTB(30/40)
GFB(30/40)
WTB(25/40)
RC(50/95)C-40 RC(50/95)C-40 RC(45/95)C-40 RC(45/95)C-40 RC(45/95)C-30 RC(45/90)C-30 RC(45/90)C-30 RC(40/75)C-30 RC(40/75)C-25 RC(40/60)C-25 RC(40/60)C-25 RC(40/50)C-25 RC(40/50)C-25 RC(40/50)C-25
3
10
10
10
10
10
10
10
10
10
10
10
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
BB(25/40)
TTB(30/40)
GFB(30/40)
First
Base
Sixth
Third
Ninth
Fifths
Tenth
Eighth
Fourth
Ground
Second
Seventh
Basement
Roof Terrace
Water Tanker
8/20/2023
ETABS 19.1.0
RC(40/75)C-40 RC(40/75)C-40 RC(40/75)C-40 RC(40/60)C-40 RC(40/60)C-30 RC(40/60)C-30 RC(35/55)C-30 RC(35/55)C-30 RC(35/55)C-25 RC(35/55)C-25 RC(35/45)C-25 RC(35/45)C-25 RC(35/45)C-25
4
Z
A
10
10
10
10
10
10
10
10
10
10
X WR-20
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
BB(25/40)
TTB(30/40)
GFB(25/40)
RC(45/90)C-40 RC(45/90)C-40 RC(45/90)C-40 RC(40/90)C-40 RC(40/90)C-30 RC(40/75)C-30 RC(40/75)C-30 RC(40/60)C-30 RC(40/60)C-25 RC(40/60)C-25 RC(40/50)C-25 RC(40/50)C-25 RC(40/50)C-25
4
4
B LY
LY
10
10
10
10
10
10
10
10
10
10
WR-20
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
BB(25/40)
TTB(30/40)
GFB(25/40)
RC(45/90)C-40 RC(45/90)C-40 RC(45/90)C-40 RC(40/90)C-40 RC(40/90)C-30 RC(40/75)C-30 RC(40/75)C-30 RC(40/60)C-30 RC(40/60)C-25 RC(40/60)C-25 RC(40/50)C-25 RC(40/50)C-25 RC(40/50)C-25
4
10
10
10
10
10
10
10
10
10
10
WR-20
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
BB(25/40)
TTB(30/40)
GFB(25/40)
RC(45/90)C-40 RC(45/90)C-40 RC(45/90)C-40 RC(40/90)C-40 RC(40/90)C-30 RC(40/75)C-30 RC(40/70)C-30 RC(40/60)C-30 RC(40/60)C-25 RC(40/60)C-25 RC(40/50)C-25 RC(40/50)C-25 RC(40/50)C-25
4
10
10
10
10
10
10
10
10
10
10
WR-20
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
FB(30/40)
BB(25/40)
TTB(30/40)
GFB(25/40)
RC(40/75)C-40 RC(40/75)C-40 RC(40/75)C-40 RC(40/60)C-40 RC(40/60)C-30 RC(40/60)C-30 RC(35/55)C-30 RC(35/55)C-30 RC(35/55)C-25 RC(35/55)C-25 RC(35/45)C-25 RC(35/45)C-25 RC(35/45)C-25
4
Base
Sixth
Third
Ninth
Fifths
Tenth
Eighth
Fourth
Ground
Second
Seventh
Basement
Roof Terrace
Water Tanker
8/20/2023
ETABS 19.1.0 8/20/2023
4 3 2 LX LX 1 1'
A A A A A A A
Water Tanker
RC(35/45)C-25
RC(35/45)C-25
RC(35/45)C-25
10 10 10 10
RC(35/45)C-25
RC(35/45)C-25
RC(35/45)C-25
10 10 10 10
RC(35/45)C-25
RC(35/45)C-25
RC(35/45)C-25
10 10 10 10
RC(35/55)C-25
RC(35/55)C-25
RC(35/55)C-25
10 10 10 10
RC(35/55)C-25
RC(35/55)C-25
RC(35/55)C-25
10 10 10 10
RC(35/55)C-30
RC(35/55)C-30
RC(35/55)C-30
10 10 10 10
RC(35/55)C-30
RC(35/55)C-30
RC(35/55)C-30
10 10 10 10
RC(40/60)C-30
RC(40/60)C-30
RC(40/60)C-30
10 10 10 10
RC(40/60)C-40
RC(40/60)C-30
RC(40/60)C-30
10 10 10 10
RC(40/60)C-40
RC(40/60)C-40
RC(40/60)C-40
10 10 10 10
RC(40/75)C-40
RC(40/75)C-40
RC(40/75)C-40
10 10 10 10
RC(40/75)C-40
RC(40/75)C-40
RC(40/75)C-40
RC(40/75)C-40
RC(40/75)C-40
RC(40/75)C-40
Base
RC(45/90)C-40 RC(45/90)C-40 RC(45/90)C-40 RC(40/90)C-40 RC(40/90)C-30 RC(40/75)C-30 RC(40/75)C-30 RC(40/60)C-30 RC(40/60)C-25 RC(40/60)C-25 RC(40/50)C-25 RC(40/50)C-25 RC(40/50)C-25
4
Z
B
Y
10
10
10
10
10
10
10
10
10
10
BB(25/40)
TTB(25/40)
GFB(25/40)
RC(50/95)C-40 RC(50/95)C-40 RC(45/95)C-40 RC(45/95)C-40 RC(45/95)C-30 RC(45/90)C-30 RC(45/90)C-30 RC(40/75)C-30 RC(40/75)C-25 RC(40/60)C-25 RC(40/60)C-25 RC(40/50)C-25 RC(40/50)C-25 RC(40/50)C-25
3
10
10
10
10
10
10
10
10
10
10
10
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
BB(25/40)
TTB(25/40)
GFB(25/40)
WTB(25/40)
RC(50/95)C-40 RC(50/95)C-40 RC(45/95)C-40 RC(45/95)C-40 RC(45/95)C-30 RC(45/90)C-30 RC(45/90)C-30 RC(40/75)C-30 RC(40/75)C-25 RC(40/60)C-25 RC(40/60)C-25 RC(40/50)C-25 RC(40/50)C-25 RC(40/50)C-25
2
B
B
LX
10
10
10
10
10
10
10
10
10
10
10
10
10
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
BB(25/40)
TTB(25/40)
GFB(25/40)
WTB(25/40)
B
LX
RC(40/90)C-40 RC(40/90)C-40 RC(40/80)C-40 RC(40/80)C-30 RC(40/70)C-30 RC(40/70)C-30 RC(40/60)C-30 RC(40/60)C-25 RC(35/50)C-25 RC(35/50)C-25 RC(35/45)C-25 RC(35/45)C-25 RC(35/45)C-25 RC(35/45)C-25
1
10
BB(25/40)
GFB(25/40)
B
1'
First
Base
Sixth
Third
Ninth
Fifths
Tenth
Eighth
Fourth
Ground
Second
Seventh
RC(45/90)C-40 RC(45/90)C-40 RC(45/90)C-40 RC(40/90)C-40 RC(40/90)C-30 RC(40/75)C-30 RC(40/75)C-30 RC(40/60)C-30 RC(40/60)C-25 RC(40/60)C-25 RC(40/50)C-25 RC(40/50)C-25 RC(40/50)C-25
4
Z
C
Y
10
10
10
10
10
10
10
10
10
10
BB(25/40)
TTB(25/40)
GFB(25/40)
RC(50/95)C-40 RC(50/95)C-40 RC(45/95)C-40 RC(45/95)C-40 RC(45/95)C-30 RC(45/90)C-30 RC(45/90)C-30 RC(40/75)C-30 RC(40/75)C-25 RC(40/60)C-25 RC(40/60)C-25 RC(40/50)C-25 RC(40/50)C-25 RC(40/50)C-25
3
10
10
10
10
10
10
10
10
10
10
10
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
BB(25/40)
TTB(25/40)
GFB(25/40)
WTB(25/40)
RC(50/95)C-40 RC(50/95)C-40 RC(45/95)C-40 RC(45/95)C-40 RC(45/95)C-40 RC(45/90)C-30 RC(45/90)C-30 RC(40/75)C-30 RC(40/75)C-30 RC(40/60)C-30 RC(40/60)C-25 RC(40/50)C-25 RC(40/50)C-25 RC(40/50)C-25
2
C
C
LX
10
10
10
10
10
10
10
10
10
10
10
10
10
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
BB(25/40)
TTB(25/40)
GFB(25/40)
WTB(25/40)
C
LX
RC(40/90)C-40 RC(40/90)C-40 RC(40/80)C-40 RC(40/80)C-30 RC(40/70)C-30 RC(40/70)C-30 RC(40/60)C-30 RC(40/60)C-25 RC(35/50)C-25 RC(35/50)C-25 RC(35/45)C-25 RC(35/45)C-25 RC(35/45)C-25 RC(35/45)C-25
1
10
BB(25/40)
GFB(25/40)
C
1'
First
Base
Sixth
Third
Ninth
Fifths
Tenth
Eighth
Fourth
Ground
Second
Seventh
RC(45/90)C-40 RC(45/90)C-40 RC(45/90)C-40 RC(40/90)C-40 RC(40/90)C-30 RC(40/75)C-30 RC(40/70)C-30 RC(40/60)C-30 RC(40/60)C-25 RC(40/60)C-25 RC(40/50)C-25 RC(40/50)C-25 RC(40/50)C-25
4
Z
D
Y
10
10
10
10
10
10
10
10
10
10
10
BB(25/40)
TTB(25/40)
GFB(25/40)
RC(50/95)C-40 RC(50/95)C-40 RC(45/95)C-40 RC(45/95)C-40 RC(45/95)C-30 RC(45/90)C-30 RC(45/90)C-30 RC(40/75)C-30 RC(40/75)C-25 RC(40/60)C-25 RC(40/60)C-25 RC(40/50)C-25 RC(40/50)C-25 RC(40/50)C-25
3
10
10
10
10
10
10
10
10
10
10
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
BB(25/40)
TTB(25/40)
GFB(25/40)
WTB(25/40)
RC(50/95)C-40 RC(50/95)C-40 RC(45/95)C-40 RC(45/95)C-40 RC(45/95)C-30 RC(45/90)C-30 RC(45/90)C-30 RC(40/75)C-30 RC(40/75)C-25 RC(40/60)C-25 RC(40/60)C-25 RC(40/50)C-25 RC(40/50)C-25 RC(40/50)C-25
2
D
D
LX
10
10
10
10
10
10
10
10
10
10
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
FB(25/40)
BB(25/40)
TTB(25/40)
GFB(25/40)
WTB(25/40)
D
LX
RC(40/90)C-40 RC(40/90)C-40 RC(40/80)C-40 RC(40/80)C-30 RC(40/70)C-30 RC(40/70)C-30 RC(40/60)C-30 RC(40/60)C-25 RC(40/60)C-25 RC(35/50)C-25 RC(35/50)C-25 RC(35/45)C-25 RC(35/45)C-25 RC(35/45)C-25
1
BB(25/40)
GFB(25/40)
D
1'
First
Base
Sixth
Third
Ninth
Fifths
Tenth
Eighth
Fourth
Ground
Second
Seventh
4 3 2 LX LX 1 1'
E E E E E E E
Water Tanker
RC(35/45)C-25
RC(35/45)C-25
RC(35/45)C-25
RC(35/45)C-25
10 10 10 10
RC(35/45)C-25
RC(35/45)C-25
RC(35/45)C-25
10 10 10 10
RC(35/45)C-25
RC(35/45)C-25
RC(35/45)C-25
10 10 10 10
RC(35/55)C-25
RC(35/55)C-25
RC(35/55)C-25
10 10 10 10
RC(35/55)C-25
RC(35/55)C-25
RC(35/55)C-25
10 10 10 10
RC(35/55)C-30
RC(35/55)C-30
10 10 10 RC(35/55)C-30 10
RC(35/55)C-30
RC(35/55)C-30
RC(35/55)C-30
10 10 10 10
RC(40/60)C-30
RC(40/60)C-30
RC(40/60)C-30
10 10 10 10
RC(40/60)C-30
RC(40/60)C-30
RC(40/60)C-30
10 10 10 10
RC(40/60)C-40
RC(40/60)C-40
RC(40/60)C-40
10 10 10 10
RC(40/75)C-40
RC(40/75)C-40
RC(40/75)C-40
10 10 10
RC(40/75)C-40
RC(40/75)C-40
RC(40/75)C-40
RC(40/75)C-40
RC(40/75)C-40
RC(40/75)C-40
Base
1 1 1 1 1 1 1
A B LY LY C D E
Water Tanker
11.8638
33.6845
-6.1416
-133.185 -236.8119 -313.9624 -267.696 -144.8816
Tenth
18.3836
-13.7117
-321.8495 -436.5779 -517.4972 -514.0505 -344.9035
Ninth
16.2737
-17.961
-28.1924
X
-147.2635
2 2 2 2 2 2 2
A B LY LY C D E
Water Tanker
Z
-2580.8334 -4259.1825 -4908.7699 -4374.945 -2551.7341
Ground
X
20.844
3 3 3 3 3 3 3
A B LY LY C D E
Water Tanker
Z
-2756.5979 -4761.0371 -4703.8197 -4741.5717 -2672.4094
Ground
X
-1169.8577 -5106.2596 -5051.7163 -5051.7979 -1110.1891
Basement
4 4 4 4 4 4 4
A B LY LY C D E
Water Tanker
Roof Terrace
Z
-2175.976 -3826.6276 -3767.068 -3579.4188 -2210.2187
Ground
X
-721.7642 -1817.1632 -1678.4735 -1663.9916 -739.3589
Basement
1 1 1 1 1 1 1
A B LY LY C D E
-37.4666
-57.728
Water Tanker
-20.5181 -62.4856 -42.4683
14.8863
34.1241
-78.4298
-73.5344
-88.2124
-86.2428 -99.0831 -83.4809 -95.9833-76.9591 -87.0511-69.0365 -81.4659-63.7898 -73.8684 -57.6392-68.2305 -51.0322 -62.8119-60.1607
42.3748 59.7386 51.7855 Roof Terrace
-52.4061 -41.1706 -46.5646 -65.3065 -38.5256
46.5875
28.3165 19.3106
31.1236
59.6302
-104.7602
-107.5042
-85.6954
44.1734 44.5983 56.6093 70.8779 28.2947
Tenth
-34.2807 -43.313 -53.0819 -64.6751 -36.0164
14.955
50.9914
41.8009
60.3887
-109.2156
-105.4226
-92.0601
31.8142
40.0475 50.6446 62.6268 67.1738 34.2268
Ninth
-41.8241 -49.3761 -55.5315 -82.8843 -41.6514
52.6742
18.8182
42.2231
62.6791
-113.5478
-115.8762
-96.2224
34.731
43.3576
53.4827
63.689
-102.7784
-123.4155
-119.6456
39.1811
27.7578
43.6049
64.3672
-124.4413
-129.2651
-111.3293
42.371
37.0972
45.4123
65.3603
-132.0362
-127.3624
-117.0106
47.2692
43.6018
46.8781
66.3828
-131.0002
-136.3967
-119.3835
49.4909
45.6544
47.5686
66.2463
-133.5389
-139.6254
-119.2783
50.793
45.7299
47.5916
65.8111
-135.6404
-128.8518
-115.4769
48.959
42.1655
46.4403
64.9234
-122.4438
-107.9476
-129.9343
-77.6105
43.7504
-63.7129 93.1176 -86.5784 170.7854 -71.2207 166.0546 -77.4607 201.3696 -100.6485 113.7072
First
-81.2639
53.1089
35.2144
43.7762
62.5516
-114.5707
-116.3867
-77.3004
-116.244
35.2129
Z
-137.8463 178.6129 -176.4242 194.5588 -181.2593 169.5879 -177.7405 243.8703 -190.9705 236.4906
Ground
-63.8674
53.1769
25.3737
52.5095
52.6203
-37.2418
15.5396 -28.576
-47.561
-28.756
X 241.4243
24.4592
14.5357
15.84
155.0092
2 2 2 2 2 2 2
A B LY LY C D E
-66.3686
-90.6937
Water Tanker
-100.7134 -59.7181 -39.4762
34.804
54.0661
33.8379
-123.7167
-124.9663
-118.7033
-103.1852
94.8864 41.1014 Roof Terrace
-57.3602 -39.1619 -42.3377 -43.9234
76.0192
44.361
60.188
72.0232
57.1924
-139.2782
-121.7017
-130.7046
-134.9271
-50.0209 77.48 41.791 35.3214 40.668Tenth
-76.1608 -49.3249 -48.5691 -49.9008
75.7426
58.0216
65.5351
73.2716
45.1567 46.2621
-147.9432
-133.3442
-140.2713
-143.6219
-45.0362 49.0683 71.4568 53.546Ninth
-48.6476 -105.4314 -74.0569 -78.4361 -58.4575
78.457
58.934
66.5807
75.761
68.7174 74.9356
-155.6522
-147.4309
-151.5342
-141.572
67.9391
79.0484
76.4361
69.8597 74.4303
-164.4894
-151.9239
-156.4494
-160.4237
71.6191 83.4402 86.3757
Seventh
-73.0194 -139.8898 -107.325 -116.8858 -90.6764
79.7709
62.3904
69.3219
77.1653
103.2272 112.8366
-172.0275
-160.2996
-163.6837
-168.3075
78.6081 126.2976 91.5967
Sixth
-123.2272 -102.1799 -118.2977 -106.1219
80.9085
64.1895
70.4113
78.3608
96.7799 112.2319
-177.7592
-167.9202
-170.3365
-174.0391
71.7024
78.7768
132.591
-181.9869
-173.4195
-175.9868
-178.2215
67.7054
72.4726
78.4741
-181.8157
-173.8357
-176.4843
-178.5666
-107.6049 113.7765 -124.8554 171.8113 -134.9589 131.1324 -134.335 134.1824 -130.599 144.1572
Third
80.4555
67.9191
72.624
78.2986
-179.1537
-173.6309
-176.1494
-170.762
-107.9796 115.0971 -169.2211 219.5032 -188.3064 188.2064 -190.2093 198.949 -136.9644 153.0603
Second
72.1194
79.8063
67.1614
77.747
-169.0659
-163.7022
-166.8821
-159.977
-112.1267 115.653 -215.9822 261.8883 -235.983 235.898 -281.5245 281.4991 -152.8976 162.8103
First
77.5294
64.8051
70.4087
75.9672
-130.3357
-126.2989
-129.8726
-129.023
Z
-177.939 183.3016 -279.3408 319.7565 -309.5268 277.7506 -347.268 363.1035 -237.7739 257.7086
Ground
61.7878
56.2307
59.3779
61.8002
-33.1329
-34.4463
-29.6639
-32.4453
X
-131.4038 160.8539 -287.5772 356.6998 -302.5475 367.8939 -366.9636 473.6713 -195.3336 249.5057
Basement
19.1752
14.8295
18.1551
18.6461
-142.5573 172.5595 -339.0979 417.8783 -365.5894 460.2405 -503.0757 611.011 -259.9953 307.2102
Base
3 3 3 3 3 3 3
A B LY LY C D E
-48.2518
-53.1002
Water Tanker
26.3416
28.0274
54.1203 77.8966 46.5852
-122.3055
-136.4166
-122.8261
-117.6016
-37.3844 -41.6129 -19.1936 Roof Terrace
-66.5386 -58.2844 -65.0342 -75.3123 -63.3738
77.1067
70.9838
58.0724
79.5937
-142.0674
-130.2852
-128.7194
-141.4507
58.0074 65.6504 62.827 63.8944 51.206Tenth
-42.2077 -61.6463 -57.1543 -61.1889 -50.5906
82.0625
64.7021
64.2148
87.5029
-150.1352
-143.0914
-140.4201
-154.6428
53.1503 56.2835 51.0741 54.1886 57.6482
Ninth
-53.0449 -91.381 -88.7545 -99.4193 -62.706
84.3144
66.3357
65.3777
91.5348
-162.0092
-153.2591
-151.0703
-165.4199
49.7567 85.3131 78.855 84.4496 55.995Eighth
-77.9281 -86.5653 -84.8355 -96.2003 -96.1803
68.0655
67.233
85.1129
93.3524
-173.9754
-164.9523
-163.0018
-177.2909
75.1481 66.4412 63.4683 70.7508 89.3855
Seventh
-75.3941 -123.1819 -119.5395 -135.9967 -92.501
87.2437
69.9982
69.2444
95.1746
-188.3603
-175.1848
-173.4433
-183.902
71.7336
70.996
97.6478
92.659
-192.0687
-184.8264
-183.3744
-197.2199
73.8781
73.3444
99.0627
-192.4131
-191.5046
-204.1801
-201.694
75.2907
74.8033
99.6027
-210.9281
-194.7528
-193.8595
-206.8286
75.8593
75.1576
100.0419
-208.0287
-193.0318
-206.4215
-193.988
-98.1146 122.8443 -148.9167 201.4408 -141.3266 196.2275 -163.0476 217.9559 -122.6872 154.1678
Second
93.0513
75.5532
75.1067
99.6147
-189.4174
-183.3451
-182.3909
-196.1477
-98.6108 120.648 -199.7677 254.5835 -202.9657 253.9172 -247.6822 307.586 -136.6617 169.345
First
82.0493
73.8924
73.0506
97.7572
-143.3773
-143.4025
-146.5268
-118.9456
Z
-157.2804 199.2205 -263.5119 320.1411 -259.406 320.2744 -341.8941 360.0843 -247.1111 234.5897
Ground
64.4244
62.4832
65.6982
48.214
-40.2377
-35.6081
-35.7718
-39.3335
X
-126.3915 162.6576 -275.5152 363.8564 -282.3881 384.6524 -366.3463 468.8456 -198.2715 239.7457
Basement
25.8978
24.2357
24.1915
25.6883
-143.2923 170.8103 -336.6119 419.9481 -365.4144 459.6432 -501.9045 611.238 -257.2425 308.9152
Base
4 4 4 4 4 4 4
A B LY LY C D E
Water Tanker
-99.4389
-94.7395
-95.3149
-92.2803
Roof Terrace
48.1693
49.3341
63.4546
63.5769
68.7935 117.7998 112.0443 121.4798 56.8555
-119.4523
-118.6554
-119.6368
-116.6301
-63.3197 -95.7905 -90.6741 -97.0433 -48.7701 Tenth
55.7309
56.5167
63.2775
63.9445
44.9572 63.8056 63.7835 72.4446 48.5199
-131.1949
-130.2061
-131.7799
-124.9482
-57.3405 -82.6277 -79.4972 -86.5759 -51.9215 Ninth
67.1119
57.2912
57.4954
68.0898
52.8016 79.691 78.4314 88.489 55.6354
-146.1795
-142.7924
-145.1192
-146.696
-50.1819 -74.6222 -72.5462 -81.5015 -49.6179 Eighth
68.7785
59.8758
59.9738
70.0076
70.2039 98.4707 96.5052 108.7067 74.777
-160.3789
-158.5185
-159.8388
-157.2509
-66.4365 -93.3006 -90.1347 -99.9259 -64.2789 Seventh
70.6061
62.1164
62.8386
72.707
64.0215 90.5828 89.5782 102.6624 72.4675
-172.3141
-171.2797
-170.4641
-169.4907
-67.9044 -98.5024 -94.275 -101.4113 -63.9989 Sixth
74.1874
64.5475
65.6551
77.4402
68.5968 91.8219 91.6348 107.1498 79.5513
-185.3042
-184.0998
-184.0744
-178.6964
-78.8428 -84.1781 -82.0222 -97.1811 -80.2692 Fifths
77.3609
68.9851
68.5567
80.9471
-192.4675
-190.4006
71.8378
83.7431
71.33
-199.5031
-200.4061
-198.572
73.9232
73.6871
85.6151
-201.0522
-200.6121
-203.818
74.4638
74.3823
85.259
-192.5323
-187.4235
-189.8809
-189.7993
-103.7359 47.507 -212.2441 91.4925 -210.4975 94.5991 -255.6843 112.9639 -136.2794 71.7841
First
78.971
71.3422
70.9544
82.8341
-67.6414
-67.7334
-67.7361
-44.588959.8424 -74.893
-202.6363 Z94.9592 -312.0285 151.8514 -311.5361 147.5055 -330.2512 220.3616 -202.3111 187.4669
Ground
31.46 -44.995969.7682
67.645
-42.7688 69.673
124.1195
-42.1193
X
225.1424
30.7135
31.7619
-132.9163 166.7321 -240.5496 310.3524 -261.6938 340.0282 -366.3162 447.6533 -247.7658 295.2538
Base
4 3 2 LX LX 1 1'
A A A A A A A
Water Tanker
46.3889
46.8719
35.617
Roof Terrace
-10.1383
-29.3632
-49.793
-42.5237
-46.848 -25.8041 -37.9087 -3.5353
62.5796
67.695
64.767
44.0934 33.4096 34.206
Tenth
-18.8474
-58.3187
-60.6822
-71.143
66.4147
69.0808
32.7372 31.2338 25.3362
63.791
Ninth
-19.0483
-59.4254
-62.5099
-72.2104
69.5143
74.6467
35.0157 32.0751 26.0414
Eighth
-19.0845
-64.3109
-67.364
-76.379
74.3957
79.2598
73.8978
Seventh
-19.2085
-68.5495
-79.8448
-71.6178
77.5966
82.4135
52.4958 50.5928 36.033
Sixth
-19.2982
-71.4328
-83.4541
-74.9885
79.6942
Fifths
-19.3721
-84.8346
-73.3034
-77.2685
81.6593
Fourth
-19.4149
-85.8356
-74.9062
-78.9473
86.194
Third
-19.4093
-74.9854
-85.6342
-78.9769
79.023
Second
-19.345
-71.9029
-76.1907
-82.9032
70.9776
76.9376
First
-19.1737
-78.1366
-67.9422
-70.0644
9.7841
9.7344
Z Ground
-7.8154
-8.8284
-8.7755
-17.5457
16.4904
14.3535
Basement
-13.355
-14.0255
-13.8488
-63.0642
B+G+10+T EtabsElevation
Model-Final-1.EDB
View - A Shear Force 2-2 Diagram (EVN OF ESM&RSM) [kN]
ETABS 19.1.0 8/20/2023
4 3 2 LX LX 1 1'
B B B B B B B
45.4825
36.9344
Water Tanker
-21.4002
-39.9894
107.6601
106.2108
-35.0594 -16.2598 -11.6832
72.7802
20.6124 75.0604 24.1522
Roof Terrace
-71.0711
-96.3385
-75.6559 -106.2026 -9.6394 -11.3197
118.1426
102.3956
43.2534 47.3281 30.843
74.189
Tenth
-69.8384
-92.5569
-123.0804
122.7436
108.1819
82.8373
39.9614 50.9613 33.7
Ninth
-79.3135
-96.5752
-124.7282
126.5754
112.5765
94.3068
59.0913 72.5553 35.3905
Eighth
-100.2714
-88.5343
-128.598
130.5584
117.7501
104.7116
48.8157 60.8746 47.6349
Seventh
-104.8369
-99.0037
-132.4202
134.2406
121.7447
117.3545
72.4008 89.1425 41.4022
Sixth
-108.4638
-108.08
-134.4901
136.6153
124.8353
Fifths
-111.1896
-115.4782
-137.0159
126.0388
131.8195
Fourth
-112.3618
-119.1325
-138.0541
134.1022
114.3211
Third
-105.9456
-118.974
-136.7759
134.1298
Second
-103.1486
-114.6991
-134.4059
123.3694
104.414
First
-96.4904
-104.6187
-129.7218
100.8787
81.0624
Z Ground
-74.4871
-84.4334
-91.3811
-87.541
16.0822
Basement
-12.7989
-13.3895
-29.1713
-106.436
B+G+10+T EtabsElevation
Model-Final-1.EDB
View - B Shear Force 2-2 Diagram (EVN OF ESM&RSM) [kN]
ETABS 19.1.0 8/20/2023
4 3 2 LX LX 1 1'
C C C C C C C
-70.8822
-56.7826
Water Tanker
-59.7181 -62.4856
40.8938
30.9878
77.8966
-101.4352
-113.608
-85.8455
-41.6129 41.1014 59.7386 Roof Terrace
-65.0342 -39.1619 -46.5646
49.3633
43.7971
67.4699
112.0443
-129.6985
-100.659
-95.3164
-90.6741 62.827 41.791 56.6093 Tenth
-57.1543 -49.3249 -53.0819
69.2886
46.4337
47.0484
63.7835 45.1567
-133.5144
-107.2586
-102.5121
-79.4972 51.0741 62.6268 Ninth
-88.7545 -74.0569 -55.5315
71.1447
47.7203
51.6828
78.4314 68.7174
-140.9277
-113.7067
-117.025
-72.5462 78.855 59.0949 Eighth
-84.8355 -76.4792 -68.9361
72.3737
50.6529
56.6103
96.5052 69.8597
-148.1561
-121.2256
-117.7301
-90.1347 63.4683 79.1214 Seventh
-119.5395 -107.325 -63.1433
73.0986
54.3726
63.495
89.5782 103.2272
-154.0953
-129.0348
-125.2998
-94.275 94.2329 61.9668 Sixth
-111.9685 -102.1799 -88.374
74.4491
56.9401
69.1485
91.6348 96.7799
-152.2456
-128.4075
-132.7179
59.5709
73.7528
108.2135
-131.4874
-155.203
-131.891
60.6725
75.8849
81.4249
-145.3121
-131.7681
-127.032
60.3824
75.5786
89.6999
-141.2762
-122.0688
-121.9835
72.7367
-131.0615
-110.3122
-110.6537
55.0073
65.4859
-104.081
-84.3962
-37.9608
-92.161
43.5476
63.9731
56.8569
-36.9859
-54.2789
-26.9078
Y 241.4243
-25.695
21.238
17.8461
64.4244
4 3 2 LX LX 1 1'
D D D D D D D
-42.7499
-39.04
Water Tanker
-39.4762 -42.4683
23.1152
19.5415
46.5852 33.8379
-113.5324
-84.2558
-91.3096
-19.1936 51.7855 Roof Terrace
-75.3123 -42.3377 -65.3065
39.7662
50.3411
69.8346
121.4798
-132.3227
-103.4454
-107.3429
-97.0433 63.8944 35.3214 70.8779 Tenth
-61.1889 -48.5691 -64.6751
70.5824
46.6343
54.2402
72.4446 46.2621
-138.9636
-112.8639
-119.1587
-86.5759 54.1886 67.1738 Ninth
-99.4193 -78.4361 -82.8843
73.1466
49.5629
54.7642
88.489 74.9356
-125.0525
-131.5784
-148.105
53.3096
57.7243
108.7067 74.4303
-158.3762
-131.4946
-142.2981
-99.9259 70.7508 69.8151 Seventh
-135.9967 -116.8858 -108.4959
75.7904
57.9401
60.9082
102.6624 112.8366
-166.7739
-154.3698
-141.668
61.6359
63.6717
-162.2096
-143.34
67.3349
66.9543
118.314 132.591
-170.3663
-147.6717
-162.168
69.7228
69.6433
103.9792
-161.0535
-163.7174
-144.1111
69.9779
70.0307
106.2223
-157.7135
-139.7578
-152.4372
67.6592
67.833
-126.6358
-140.1273
-146.271
62.8754
76.1638
-100.8416
-93.8326
-97.5458
-39.9281
49.6848
49.6572
55.806
-31.7559
-33.7715
-35.7259
-54.4984
28.0743
28.4896
62.3784
4 3 2 LX LX 1 1'
D D D D D D D
-42.7499
-39.04
Water Tanker
-39.4762 -42.4683
23.1152
19.5415
46.5852 33.8379
-113.5324
-84.2558
-91.3096
-19.1936 51.7855 Roof Terrace
-75.3123 -42.3377 -65.3065
39.7662
50.3411
69.8346
121.4798
-132.3227
-103.4454
-107.3429
-97.0433 63.8944 35.3214 70.8779 Tenth
-61.1889 -48.5691 -64.6751
70.5824
46.6343
54.2402
72.4446 46.2621
-138.9636
-112.8639
-119.1587
-86.5759 54.1886 67.1738 Ninth
-99.4193 -78.4361 -82.8843
73.1466
49.5629
54.7642
88.489 74.9356
-125.0525
-131.5784
-148.105
53.3096
57.7243
108.7067 74.4303
-158.3762
-131.4946
-142.2981
-99.9259 70.7508 69.8151 Seventh
-135.9967 -116.8858 -108.4959
75.7904
57.9401
60.9082
102.6624 112.8366
-166.7739
-154.3698
-141.668
61.6359
63.6717
-162.2096
-143.34
67.3349
66.9543
118.314 132.591
-170.3663
-147.6717
-162.168
69.7228
69.6433
103.9792
-161.0535
-163.7174
-144.1111
69.9779
70.0307
106.2223
-157.7135
-139.7578
-152.4372
67.6592
67.833
-126.6358
-140.1273
-146.271
62.8754
76.1638
-100.8416
-93.8326
-97.5458
-39.9281
49.6848
49.6572
55.806
-31.7559
-33.7715
-35.7259
-54.4984
28.0743
28.4896
62.3784
1 1 1 1 1 1 1
A B LY LY C D E
25.8675
36.3189
Water Tanker
-15.6059
-41.2291
-11.6832
85.6597
59.4074
24.155844.027550.054 49.1238 37.5143 53.1066 40.0263 54.8578 40.9741 55.3236 40.6634 54.4936 39.5487 53.3095 37.2148 50.4472 33.966 48.4042 31.9473 45.8258 29.4646 43.6128 27.7151 41.8295 35.8301
47.9847
24.1522 46.8089 35.81
Roof Terrace
-25.4514-34.6545-64.484 -41.4098-49.0134 -45.5545-51.9791 -47.6427 -52.825 -48.3437-51.9046 -47.7498 -49.9092-46.7882 -46.1804 -44.1274 -41.2357-42.3912 -37.9789 -39.9408-34.2991 -38.0783 -30.8588-36.1376 -40.9385
-52.9667
-76.1863
-63.1961
104.4403
-3.5353 -3.8513
75.7002
63.6372
34.206 30.843 40.636 47.5252 23.2118
Tenth
-70.391
-78.32
-97.0706
105.2301
-4.616 -1.8842 -9.9777
65.9372
78.2511
Ninth
-72.0163
-80.5368
-97.8121
108.094
67.7105
80.699
-74.0359 Eighth
-100.6528
-82.2006
111.1676
-10.8217 -8.8199 -0.5892 -18.6964
70.1292
82.961
Seventh
-76.8998
-85.0333
-102.798
113.5191
-13.1841 -9.0919 -4.6696 -21.6179
86.3007
72.517
36.033 41.4022 46.6813 66.9063 34.2935
Sixth
-80.3986
-87.5835
-104.7035
114.6048
-16.0232 -16.945 -9.3627 -28.4294
88.6653
73.9414
Fifths
-105.9589
-82.1981
-88.8805
116.7677
-15.0935 -15.9831 -12.8811 -25.6915
89.4102
74.8969
Fourth
-83.1331
-89.639
-107.708
75.0106
Third
-83.0754
-108.4108
-89.5449
116.1961
73.7939
Second
-81.6511
-88.3877
-106.6209
113.8865
71.1618
First
-78.7725
-85.2601
-104.0162
104.9945
88.3202
-97.8525
14.7721
35.5511
18.2482
X 53.6578 119.9306
52.8875 41.7038
Basement
-14.9615
-14.607
-36.2436
B+G+10+T EtabsElevation
Model-Final-1.EDB
View - 1 Shear Force 2-2 Diagram (EVN OF ESM&RSM) [kN]
ETABS 19.1.0 8/20/2023
2 2 2 2 2 2 2
A B LY LY C D E
74.2751
55.6361
Water Tanker
-50.9939
-74.8554
109.9321
-16.2598 -22.3227 -26.6328
98.4859
98.2988
71.8294
75.0604 38.3697 20.039
Roof Terrace
-73.414
-103.2509
-95.2744
-99.0268
-37.9087 -11.3197 -20.8701 -21.5183 -24.5354
122.5041
110.2255
122.918
92.5522
33.4096 47.3281 27.7386 26.4076 29.7669
-96.4495 Tenth
-110.5907
-114.1249
-126.7123
123.8568
113.9461
95.9893
31.2338 50.9613 29.1331 26.6457 35.3406
Ninth
-102.4626
-113.8883
-117.9531
-127.8284
117.0306
128.043
99.5065
32.0751 72.5553 45.2969 45.0096 36.9304
Eighth
-107.3436
-117.2909
-121.0369
-131.9027
133.7339
131.6919
-45.8058 -26.9671 -36.9115 -36.848 -49.508
103.7048
120.6252
49.7739 60.8746 40.6471 41.1099 61.1973
Seventh
-113.2237
-121.2158
-124.4075
-135.3634
136.8321
134.4906
-46.5193 -45.6485 -58.2842 -58.221 -53.0013
107.0913
Sixth
-118.0766
-124.1227
-127.5735
-138.0148
140.0947
126.9575
136.8617
-53.0744 -42.0361 -51.2278 -54.4051 -65.227
111.4083
Fifths
-123.5648
-127.9793
-130.74
-140.2007
129.0534
Fourth
-126.6952
-130.3979
-132.1977
-143.9269
141.2412
129.2874
142.4905
Third
-127.2735
-130.5225
-132.2543
-145.633
141.1537
139.7752
128.2205
115.0567
Second
-144.1851
-125.6936
-129.4039
-131.184
138.5547
112.3595
124.336
First
-120.2925
-140.1674
-125.3949
-127.2523
99.0566
94.1196
Z Ground
-90.0264
-96.4259
-100.9401
-101.2039
20.3644
15.2529
16.1411
Basement
-16.3604
-19.4749
-15.5673
-15.5096
B+G+10+T EtabsElevation
Model-Final-1.EDB
View - 2 Shear Force 2-2 Diagram (EVN OF ESM&RSM) [kN]
ETABS 19.1.0 8/20/2023
3 3 3 3 3 3 3
A B LY LY C D E
34.4687
34.99
Water Tanker
-37.489
-36.732
103.4604
114.6337
-35.0594 -45.7321 -24.6003
95.2866
92.5008
20.6124 6.2238
Roof Terrace
-102.2098
-118.331
-97.2691
-105.0387
-25.8041 -9.6394 -4.6026 -2.4219 -12.439
124.1446
118.9453
110.1885
111.0489
44.0934 43.2534 44.5552 48.5617 40.4361
-111.3306 Tenth
-110.7389
-122.8904
-136.185
126.4775
115.4915
114.8348
32.7372 39.9614 36.1639 37.2956 36.9847
Ninth
-116.745
-116.2924
-138.8075
-129.0357
-24.8916 -22.9697 -21.3429 -25.605 -25.4031
128.6334
120.0025
119.0405
131.34
35.0157 59.0913 56.1557 61.2384 39.7719
Eighth
-121.1065
-120.8798
-144.0703
-133.5108
133.2569
135.6005
-39.7124 -20.9049 -19.5615 -23.3592 -42.5782
124.9252
123.8056
52.0537 48.8157 47.3364 52.446 63.2172
Seventh
-126.046
-126.0227
-148.6185
-138.4679
137.8436
127.9802
139.0764
-40.4958 -34.3639 -32.2246 -38.7466 -46.1514
129.22
Sixth
-130.3866
-130.5324
-152.539
-143.2675
142.5186
133.0604
142.1689
134.6118
Fifths
-135.5218
-136.0179
-155.8002
-148.128
145.1858
138.1006
136.4277
Fourth
-138.9365
-139.5511
-160.6222
-150.9365
146.3059
149.4691
139.2103
137.6466
Third
-140.0335
-140.5433
-163.6233
-152.0259
146.3379
148.8388
138.9769
137.3552
Second
-139.6291
-140.1997
-162.5629
-151.7426
138.9254
145.8183
133.5402
First
-135.0967
-135.4954
-147.3184
-155.83
107.9587
75.4838
Z Ground
-93.6226
-81.5909
-108.5874
-110.3851
17.6988
17.7754
18.6511
Basement
-18.8518
-17.7537
-17.6714
-17.9522
B+G+10+T EtabsElevation
Model-Final-1.EDB
View - 3 Shear Force 2-2 Diagram (EVN OF ESM&RSM) [kN]
ETABS 19.1.0 8/20/2023
4 4 4 4 4 4 4
A B LY LY C D E
Water Tanker
95.8612
83.8025
81.2609
91.433
Roof Terrace
-92.3515
-83.9093
-83.7027
-69.2748
-46.848 -75.6559 -71.537 -76.3612 -37.08
120.1788
106.5634
104.1991
100.6674
Tenth
-85.7562
-116.8256
-103.0664
-103.7981
-35.2406 -50.5858 -49.2005 -53.8738 -34.1379
109.1982
124.1492
112.9754
105.9172
Ninth
-91.5923
-120.817
-108.7521
-109.1582
-34.611 -51.5064 -50.2592 -55.6542 -33.8602
131.4899
119.4568
115.9937
111.9756
Eighth
-97.0655
-128.1087
-115.4669
-116.0155
137.5118
-46.2508 -63.673 -61.9681 -68.6992 -45.9804
125.3053
121.8515
117.2763
3.0551
Seventh
-102.0952
-121.435
-122.017
-134.0813
130.1804
126.9069
142.6455
-44.191 -62.172 -60.6083 -67.073 -44.892
121.9314 5.2019
Sixth
-107.3067
-130.6894
-126.8547
-127.4434
135.9268
132.9028
127.0941
146.859
0.585 11.1451
Fifths
-111.8372
-134.598
-132.7912
-133.2403
152.5499
139.8603
136.6786
130.5602
Fourth
-115.2495
-139.6152
-136.6271
-137.0739
156.5736
142.9169
133.3699
3.4466 13.9719
Third
-117.8966
-142.9007
-139.4961
-140.0862
143.7635
156.8047
140.4506
134.0133
Second
-118.245
-142.8324
-140.2166
-140.9607
139.8599
152.4671
130.4089
First
-114.4495
-139.471
-135.5916
-136.1839
9.5513
9.2723
Z Ground
-9.1718
-9.3678
-9.6965
-30.9237
20.0025
20.1755
20.6619
Basement
-20.6512
-19.823
-19.6252
-20.0938
B+G+10+T EtabsElevation
Model-Final-1.EDB
View - 4 Shear Force 2-2 Diagram (EVN OF ESM&RSM) [kN]
ETABS 19.1.0 8/20/2023
4 3 2 LX LX 1 1'
E E E E E E E
Water Tanker
46.1357
42.6095
35.3015
Roof Terrace
-16.0969
-28.0026
-37.4415
-45.6313
-37.08 -12.439 -24.5354 -3.8513
66.7151
63.2973
64.0351
40.4361 29.7669 23.2118
Tenth
-26.1028
-65.7783
-57.4597
-56.5209
-34.1379 -22.0733 -25.8034 -9.9777
70.2834
67.0065
68.2196
36.9847 35.3406 23.2784
Ninth
-26.52
-61.8538
-61.5509
-69.73
76.3824
75.5217
39.7719 36.9304 22.8149
Eighth
-26.4344
-76.0413
-69.1576
-69.2034
-45.9804 -42.5782 -49.508 -18.6964
81.4184
82.1474
82.6194
3.0551 63.2172 61.1973 35.7473
Seventh
-26.7542
-81.0518
-75.2079
-75.4348
87.7835
85.8777
Sixth
-27.0808
-80.4451
-81.2685
-85.4333
91.9969
91.283
Fifths
-27.3325
-84.2774
-85.6153
-88.5826
95.1566
95.5415
Fourth
-27.2409
-87.8144
-91.2107
-89.2843
97.2286
93.7089
Third
-27.2935
-92.2952
-89.459
-90.9676
95.2543
92.3879
Second
-27.2087
-87.4111
-90.5413
-89.2312
88.3986
88.5672
First
-26.1585
-84.4354
-80.8752
-82.1041
13.8934
13.5746
Z Ground
-11.8053
-11.9632
-17.1436
-47.5866
22.7935
23.4474
Basement
-17.7099
-19.7861
-19.5651
-66.2077
B+G+10+T EtabsElevation
Model-Final-1.EDB
View - E Shear Force 2-2 Diagram (EVN OF ESM&RSM) [kN]
ETABS 19.1.0 8/21/2023
4 3 2 LX LX 1 1'
B B B B B B B
45.4825
36.9344
Water Tanker
-21.4002
-39.9894
107.6601
106.2108
-35.0594 -16.2598 -11.6832
72.7802
20.6124 75.0604 24.1522
Roof Terrace
-71.0711
-96.3385
-75.6559 -106.2026 -9.6394 -11.3197
118.1426
102.3956
43.2534 47.3281 30.843
74.189
Tenth
-69.8384
-92.5569
-123.0804
122.7436
108.1819
82.8373
39.9614 50.9613 33.7
Ninth
-79.3135
-96.5752
-124.7282
126.5754
112.5765
94.3068
59.0913 72.5553 35.3905
Eighth
-100.2714
-88.5343
-128.598
130.5584
117.7501
104.7116
48.8157 60.8746 47.6349
Seventh
-104.8369
-99.0037
-132.4202
134.2406
121.7447
117.3545
72.4008 89.1425 41.4022
Sixth
-108.4638
-108.08
-134.4901
136.6153
124.8353
Fifths
-111.1896
-115.4782
-137.0159
126.0388
131.8195
Fourth
-112.3618
-119.1325
-138.0541
134.1022
114.3211
Third
-105.9456
-118.974
-136.7759
134.1298
Second
-103.1486
-114.6991
-134.4059
123.3694
104.414
First
-96.4904
-104.6187
-129.7218
100.8787
81.0624
Z Ground
-74.4871
-84.4334
-91.3811
-87.541
16.0822
Basement
-12.7989
-13.3895
-29.1713
-106.436
B+G+10+T EtabsElevation
Model-Final-1.EDB
View - B Shear Force 2-2 Diagram (EVN OF ESM&RSM) [kN]
ETABS 19.1.0 8/20/2023
4 3 2 LX LX 1 1'
C C C C C C C
67.5524
59.267
Water Tanker
-50.7708
-70.1882
103.9842
-45.7321 -22.3227
77.5179
97.701
38.3697 46.8089
Roof Terrace
-102.2277
-95.1371
-106.892
-71.537 -4.6026 -20.8701
117.2516
96.2283
78.0885
44.5552 27.7386 40.636
Tenth
-89.7969
-119.3614
-124.4643
-49.2005 -12.0273 -26.3165
121.9284
101.2704
81.9719
36.1639 29.1331 43.7161
Ninth
-94.4372
-121.4607
-133.8832
-50.2592 -21.3429 -42.3575
126.1504
106.0617
86.4384
56.1557 45.2969 43.2628
Eighth
-98.4561
-125.6372
-142.6456
-61.9681 -19.5615 -36.9115 -0.5892
130.2064
111.5084
90.6985
47.3364 40.6471 55.3647
Seventh
-103.2413
-129.5634
-148.8633
133.9838
94.9777
68.6575 60.5417 46.6813
Sixth
-107.0512
-132.2227
-156.9376
136.6552
98.3358
58.7583 52.3147 66.4205
Fifths
-109.9964
-134.9352
-162.9239
120.7908
99.6153
Fourth
-111.3528
-136.2037
-166.5138
99.5133
111.948
Third
-105.5402
-135.2615
-167.0594
109.4446
96.8379
Second
-103.0593
-133.1568
-163.8299
103.5892
91.5876
First
-97.2507
-127.9944
-157.478
80.7654
82.3906
Z Ground
-85.2198
-74.6004
-86.3786
-168.1193
33.1164
Basement
-13.1695
-14.0495
-29.8772
-108.9698
B+G+10+T EtabsElevation
Model-Final-1.EDB
View - C Shear Force 2-2 Diagram (EVN OF ESM&RSM) [kN]
ETABS 19.1.0 8/20/2023
4 3 2 LX LX 1 1'
D D D D D D D
33.3332
35.0828
Water Tanker
-34.9664
-30.6285
104.5393
-24.6003 -26.6328
99.5541
76.4277
6.2238 20.039 35.81
Roof Terrace
-75.7791
-83.315
-76.3612 -108.6367 -2.4219 -21.5183
117.7958
113.2446
48.5617 26.4076 47.5252
94.871
Tenth
-90.2475
-95.9223
-125.9405
123.9246
119.9438
101.3421
37.2956 26.6457 44.7536
Ninth
-96.9277
-101.9488
-129.4039
129.2602
125.6573
-55.6542 -25.605 -43.5751
107.3546
61.2384 45.0096 57.8818
Eighth
-102.3553
-107.3734
-134.8837
134.4636
133.1519
-68.6992 -23.3592 -36.848
114.0775
52.446 41.1099 49.0366
Seventh
-108.6696
-113.2432
-139.8659
139.3496
119.3326
138.727
75.359 60.9612 66.9063
Sixth
-113.8749
-118.4626
-143.6321
143.3866
142.8053
124.2215
Fifths
-118.3709
-122.8135
-147.3855
145.2757
145.5473
Fourth
-120.5636
-149.2605
-124.9781
145.3057
146.1822
Third
-113.947
-125.128
-149.0953
143.6504
116.909
Second
-111.7465
-122.7293
-147.2015
137.4674
137.2715
First
-105.3444
-116.2693
-141.274
87.2867
Z Ground
-68.8747
-83.9636
-89.0214
-86.5193
19.8629
20.2962
Basement
-15.414
-16.9166
-16.6056
-103.0691
B+G+10+T EtabsElevation
Model-Final-1.EDB
View - D Shear Force 2-2 Diagram (EVN OF ESM&RSM) [kN]
ETABS 19.1.0 8/20/2023
4 3 2 LX LX 1 1'
E E E E E E E
Water Tanker
46.1357
42.6095
35.3015
Roof Terrace
-16.0969
-28.0026
-37.4415
-45.6313
-37.08 -12.439 -24.5354 -3.8513
66.7151
63.2973
64.0351
40.4361 29.7669 23.2118
Tenth
-26.1028
-65.7783
-57.4597
-56.5209
-34.1379 -22.0733 -25.8034 -9.9777
70.2834
67.0065
68.2196
36.9847 35.3406 23.2784
Ninth
-26.52
-61.8538
-61.5509
-69.73
76.3824
75.5217
39.7719 36.9304 22.8149
Eighth
-26.4344
-76.0413
-69.1576
-69.2034
-45.9804 -42.5782 -49.508 -18.6964
81.4184
82.1474
82.6194
3.0551 63.2172 61.1973 35.7473
Seventh
-26.7542
-81.0518
-75.2079
-75.4348
87.7835
85.8777
Sixth
-27.0808
-80.4451
-81.2685
-85.4333
91.9969
91.283
Fifths
-27.3325
-84.2774
-85.6153
-88.5826
95.1566
95.5415
Fourth
-27.2409
-87.8144
-91.2107
-89.2843
97.2286
93.7089
Third
-27.2935
-92.2952
-89.459
-90.9676
95.2543
92.3879
Second
-27.2087
-87.4111
-90.5413
-89.2312
88.3986
88.5672
First
-26.1585
-84.4354
-80.8752
-82.1041
13.8934
13.5746
Z Ground
-11.8053
-11.9632
-17.1436
-47.5866
22.7935
23.4474
Basement
-17.7099
-19.7861
-19.5651
-66.2077
B+G+10+T EtabsElevation
Model-Final-1.EDB
View - E Shear Force 2-2 Diagram (EVN OF ESM&RSM) [kN]
0.062 0.076 0.123 0.179 0.199 0.231 0.272 0.282 0.289 0.337 0.417 0.439 N/A
1
Z
A
0.072 0.184 0.196 0.243 0.270 0.316 0.380 0.399 0.415 0.448 0.491 0.538 N/A
ETABS 19.1.0
X
0.045 0.070 0.083 0.108 0.138 0.155 0.187 0.222 0.261 0.267 0.275 0.262 0.275 N/A
1
0.097 0.220 0.228 0.272 0.306 0.337 0.370 0.442 0.543 0.560 0.598 0.630 0.649 N/A
1
B LY
1
LY
0.076 0.196 0.194 0.239 0.272 0.302 0.335 0.394 0.472 0.493 0.522 0.548 0.550 N/A
0.040 0.070 0.093 0.122 0.153 0.172 0.210 0.221 0.252 0.308 0.310 0.339 0.360 N/A
1
0.069 0.215 0.221 0.263 0.294 0.327 0.367 0.379 0.451 0.575 0.602 0.646 0.650 N/A
0.065 0.100 0.148 0.214 0.234 0.266 0.306 0.309 0.310 0.353 0.421 0.427 N/A
1
0.047 0.169 0.203 0.250 0.276 0.322 0.384 0.405 0.419 0.448 0.506 0.593 N/A
First
Base
Sixth
Third
Ninth
Fifths
Tenth
Fourth
Ground
Second
Seventh
Basement
Roof Terrace
Water Tanker
8/21/2023
0.050 0.082 0.119 0.184 0.209 0.242 0.282 0.291 0.296 0.329 0.401 0.383 N/A
2
Z
A
0.047 0.190 0.238 0.298 0.329 0.380 0.450 0.472 0.495 0.533 0.618 0.658 N/A
ETABS 19.1.0
X
0.020 0.041 0.059 0.075 0.089 0.100 0.125 0.176 0.208 0.251 0.272 0.315 0.350 N/A
2
0.042 0.135 0.196 0.223 0.251 0.270 0.311 0.378 0.427 0.486 0.567 0.658 0.700 N/A
2
B LY
2
0.019 0.044 0.058 0.065 0.075 0.087 0.108 0.150 0.169 0.221 0.262 0.315 0.355 N/A
2
0.035 0.122 0.172 0.187 0.211 0.235 0.267 0.312 0.345 0.393 0.456 0.553 0.577 N/A
0.020 0.046 0.066 0.079 0.091 0.097 0.121 0.174 0.209 0.256 0.279 0.336 0.320 N/A
2
0.035 0.128 0.182 0.207 0.236 0.251 0.289 0.355 0.406 0.464 0.542 0.661 0.719 N/A
0.062 0.127 0.170 0.258 0.289 0.323 0.357 0.348 0.336 0.356 0.420 0.380 N/A
2
0.047 0.185 0.235 0.292 0.321 0.371 0.438 0.455 0.480 0.499 0.595 0.648 N/A
First
Base
Sixth
Third
Ninth
Fifths
Tenth
Eighth
Fourth
Ground
Second
Seventh
Basement
Roof Terrace
Z
A
0.056 0.196 0.265 0.334 0.365 0.424 0.503 0.508 0.553 0.566 0.640 0.668 N/A
ETABS 19.1.0
X
0.019 0.046 0.063 0.074 0.086 0.093 0.118 0.176 0.216 0.274 0.317 0.421 0.399 N/A
3
0.037 0.134 0.203 0.235 0.264 0.278 0.315 0.381 0.433 0.479 0.560 0.681 0.706 N/A
3
B LY
3
LY
0.037 0.136 0.200 0.228 0.257 0.270 0.304 0.364 0.414 0.447 0.509 0.625 0.707 N/A
0.019 0.044 0.072 0.084 0.097 0.103 0.129 0.189 0.229 0.286 0.322 0.414 0.421 N/A
3
0.037 0.129 0.210 0.238 0.268 0.282 0.320 0.386 0.437 0.489 0.573 0.681 0.699 N/A
0.058 0.137 0.170 0.257 0.287 0.310 0.340 0.331 0.342 0.355 0.411 0.371 N/A
3
0.056 0.169 0.272 0.340 0.370 0.411 0.475 0.490 0.533 0.529 0.608 0.649 N/A
First
Base
Sixth
Third
Ninth
Fifths
Tenth
Eighth
Fourth
Ground
Second
Basement
Roof Terrace
Water Tanker
8/21/2023
0.028 0.042 0.093 0.139 0.157 0.183 0.216 0.224 0.230 0.266 0.328 0.309 N/A
4
Z
A
0.073 0.117 0.302 0.374 0.402 0.458 0.530 0.542 0.546 0.566 0.584 0.593 N/A
ETABS 19.1.0
X
0.014 0.044 0.054 0.066 0.089 0.123 0.145 0.197 0.212 0.239 0.304 0.358 N/A
4
0.067 0.125 0.268 0.346 0.386 0.398 0.437 0.488 0.484 0.507 0.548 0.609 N/A
4
B LY
4
LY
0.068 0.127 0.265 0.343 0.382 0.395 0.434 0.485 0.481 0.505 0.538 0.609 N/A
0.014 0.040 0.062 0.076 0.099 0.144 0.174 0.213 0.225 0.252 0.311 0.365 N/A
4
0.071 0.144 0.273 0.349 0.387 0.412 0.453 0.490 0.487 0.513 0.548 0.609 N/A
0.030 0.073 0.112 0.168 0.186 0.212 0.244 0.246 0.244 0.274 0.321 0.287 N/A
4
0.072 0.132 0.293 0.368 0.395 0.448 0.519 0.531 0.535 0.553 0.569 0.595 N/A
First
Base
Sixth
Third
Ninth
Fifths
Tenth
Eighth
Fourth
Ground
Second
Basement
Roof Terrace
Water Tanker
8/21/2023
ETABS 19.1.0 8/21/2023
A B LY LY C D E
6 (m) 0.8 (m) 1.8 (m) 3.4 (m) 6 (m) 6 (m)
204 204 204 204 204 204 204 204 204 204 204 204
1' 204 204 204 204 204 204 204 204 204 204 204 204
253
603
614
569
242
0
0
1.6 (m)
284 204
204 204
360 204
204 268
382 204
204 267
367 204
204 244
323 204
204 204
316 204 297 244 204 219 204 204 204 204 204 204
1 204 204 204 204 204 204 204 204 204 204 204 204
1.53 (m)
204
204
231
204
242
204
233
204
292
204
LX
1.9 (m)
204
204
204
204
204
204
204
204
0
LX
204
204
204
204
204
204
204
204
225
234
1.8 (m)
216 204 204 248 204 204 204 204 204 204 204 211
2 204 204 204 204 204 204 204 204 204 204 204 204
204
204
204
204
204
204
220
204
275
204
5.2 (m)
204
204
204
204
204
204
204
204
204
204
204
204
204
204
204
204
204
204
229
228
265 204 232 233 204 232 232 204 234 233 204 258
3 204 204 204 204 204 204 204 204 204 204 204 204
204
204
204
204
204
204
206
204
256
204
6 (m)
204
204
204
204
204
204
204
204
204
204
Y
204
204
204
204
204
204
204
204
224
204
298 204 278 274 204 278 272 204 282 274 204 295
4 X
204 204 204 204 204 204 204 204 204 206 204 205
B+G+10+T Etabs
PlanModel-Final-1.EDB
View - Basement - Z = -1.3 (m) Longitudinal Reinforcing (Eurocode 2-2004)
ETABS 19.1.0 8/21/2023
A B LY LY C D E
6 (m) 0.8 (m) 1.8 (m) 3.4 (m) 6 (m) 6 (m)
164 164 164 164 164 164 164 164 164 164 164 164
1' 164 164 164 164 164 164 164 164 164 164 164 164
222
516
499
457
204
0
0
1.6 (m)
302 204
204 204
266 204
204 252
249 204
204 249
262 204
204 224
345 204
204 204
882 0 920 387
541 204 299
486 926 0 923 939 0 826
1 395 825 416 204
254 204
248 204
230 419 832 418 427 798 371
1.53 (m)
336
290
570
266
663
305
741
337
540
455
LX
1.9 (m)
204
204
390
632
626
204
204
0
0
LX
287
337
479
227
664
539
630
332
450
541
1.8 (m)
585
273
599
278
325
557
448
711
5.2 (m)
204
204
571
563
590
204
204
0
0
294
339
512
304
522
300
616
328
444
563
1031 0 1081 1081 0 1080 1102 25 1100 870 0 845
3 460 1013 487 487 1021 486 498 1061 507 397 526 387
295
258
803
373
825
377
679
312
651
328
6 (m)
204
204
921
934
488
204
295
58
71
Y
250
308
732
375
737
381
621
288
575
359
437 204 465 455 204 466 466 204 444 566 277 563
4 X
482 204 450 465 204 455 456 204 481 449 282 464
B+G+10+T Etabs
Plan
Model-Final-1.EDB
View - Ground - Z = 1.5 (m) Longitudinal Reinforcing (Eurocode 2-2004)
ETABS 19.1.0 8/21/2023
A B LY LY C D E
6 (m) 0.8 (m) 1.8 (m) 3.4 (m) 6 (m) 6 (m)
1'
204
0
204
0
1.6 (m)
242 204
0
204 204
204
204
1040
727
331
808
364
831
373
484
973
446
LX
1.9 (m)
204
292
314
204
466
586
204
334
0
0
LX
650
300
654
309
785
449
901
414
880
476
1.8 (m)
824
370
828
371
949
432
966
442
5.2 (m)
204
266
517
513
243
358
511
0 0
0
0 164
731
342
746
344
878
891
469
411
447 164
1392 245 1376 1351 0 1342 1345 0 1344 1438 19 1415
3 665 937 656 641 852 636 637 839 637 693 1056 679
1082
778
352
975
447
979
449
508
989
455
6 (m)
425
880
866
877
204
416
16
13
0
Y
1067
749
340
970
444
968
443
500
930
422
1413 245 1411 1379 245 1378 1376 245 1395 1348 245 1395
4 X
678 748 677 657 678 657 656 673 667 639 726 667
A B LY LY C D E
6 (m) 0.8 (m) 1.8 (m) 3.4 (m) 6 (m) 6 (m)
1'
204
0
204
0
1.6 (m)
218 204
0
204 204
204
204
408
204
443
210
702
321
808
364
384
204
LX
1.9 (m)
204
321
204
321
555
800
204
301
0
0
LX
351
204
480
227
604
372
691
426
283
204
1.8 (m)
803 160 1193 1002 0 607 1049 24 1216 1150 104 753
2 683 1193 550 449 674 409 495 1060 563 525 1139 652
333
204
862
385
763
387
647
331
321
204
5.2 (m)
204
204
761
744
629
204
206
0 0 0
0
164 164
0 204
204
0
324
204
774
401
880
394
680
336
281
204
395 164
0
186
217
872 163 1242 1361 146 1204 1140 20 1151 1248 183 800
3 515 1196 577 647 1179 556 519 1057 526 581 1215 514
1092
1054
1084
415
212
514
510
521
430
204
6 (m)
1092
1107
1119
461
250
234
262
461
0
Y
467
221
996
554
987
543
994
579
389
223
B+G+10+T Etabs
Plan View
Model-Final-1.EDB
- Roof Terrace - Z = 36.7 (m) Longitudinal Reinforcing (Eurocode 2-2004)
ETABS 19.1.0 8/21/2023
A B LY LY C D E
6 (m) 0.8 (m) 1.8 (m) 3.4 (m) 6 (m) 6 (m)
1'
1.6 (m)
204
204
564
264
283
204
LX
1.9 (m)
204
204
678
204
341
0
LX
204
285
635
348
320
204
1.8 (m)
837
423
329
204
5.2 (m)
375
873
204
337
0
9
318
249
605
537
249
222
4 X
B+G+10+T Etabs
Plan View
Model-Final-1.EDB
- Water Tanker - Z = 39.7 (m) Longitudinal Reinforcing (Eurocode 2-2004)
ETABS 19.1.0 8/21/2023
1 1 1 1 1 1 1
A B LY LY C D E
1575
3255
2058
515 0 580 409 204 315 510 0 531 782 34 626 Roof Terrace
433 632 275 204 204 204 240 431 249 354 898 487
1575
1575
2203
2389
241 212 210
789 0 662 341 204 304 609 0 610 855 0 889 Tenth
356 555 305 204 204 204 283 439 283 382 728 399
1575
1575
1969
1575
242 213 221
782 0 709 390 204 338 649 0 664 864 0 837 Ninth
354 560 324 204 204 204 299 436 305 385 734 375
1575
1575
1750
1575
259 225 240
859 0 764 436 204 385 699 0 700 863 0 876 Eighth
383 553 346 207 204 204 320 436 320 385 727 392
1750
1750
1803
1925
287 247 274
902 0 814 476 204 423 758 0 754 914 0 927 Seventh
406 548 366 225 204 204 344 435 343 413 720 420
1750
1750
2400
1925
302 255 294
934 0 881 539 204 479 837 0 813 963 204 967 Sixth
424 541 394 252 204 243 375 431 366 440 719 442
2400
2400
2400
1925
332 270 331
954 0 924 591 204 524 884 0 847 984 204 985 Fifths
435 539 418 275 204 288 396 427 379 452 721 453
2400
2400
2400
1925
347 281 351
978 0 938 614 204 546 900 0 870 1002 204 1015 Fourth
449 528 426 285 204 303 405 427 389 462 706 470
2800
2800
2800
2400
996 0 937 621 204 551 899 0 873 1003 204 1037 Third
459 521 426 288 204 303 405 426 390 463 699 482
2800
2800
2800
2400
964 0 914 598 204 530 873 0 848 983 204 1010 Second
441 521 413 278 204 278 391 426 379 452 699 467
3200
3200
3200
2400
921 0 857 544 204 476 806 0 787 931 0 971 First
417 518 383 255 204 230 363 424 355 422 697 445
3200
3200
3200
3000
Z 882 0 920 541 204 486 926 0 923 939 0 826 Ground
395 825 416 254 248 230 419 832 418 427 798 371
3600
3600
3600
3000
316 204 297 244 204 219 204 204 204 204 204 204 Basement
204 204 204 204 204 204 204 204 204 204 204 204
3000
3600
3600
3600
3000
Base
2 2 2 2 2 2 2
A B LY LY C D E
2682
5574
2735
803 160 1193 1002 0 607 1049 24 1216 1150 104 753 Roof Terrace
683 1193 550 449 674 409 495 1060 563 525 1139 652
3041
2279
2000
2039
2799
1132 0 1191 1013 0 818 1094 0 1110 1165 0 1090 Tenth
515 977 549 453 677 375 494 852 503 534 932 492
1577
2000
2000
2000
1575
1069 0 1202 1044 0 810 1090 0 1129 1177 0 1027 Ninth
480 983 555 466 680 372 492 847 513 540 938 459
1662
2400
2400
2400
1849
1099 0 1197 1068 245 847 1105 0 1120 1174 0 1056 Eighth
497 974 551 480 680 388 500 847 508 538 930 473
1925
2400
2400
2400
1925
1153 0 1223 1138 245 931 1169 0 1168 1196 0 1118 Seventh
527 966 567 519 683 421 536 847 535 551 925 507
1925
3000
3000
3000
1999
1200 0 1274 1195 245 1000 1218 0 1216 1249 0 1165 Sixth
553 964 596 551 683 448 564 846 562 582 924 534
1925
3000
3000
3000
1925
1231 0 1313 1247 245 1058 1263 0 1256 1288 0 1198 Fifths
571 961 619 580 682 474 589 841 586 604 923 552
1925
4050
4050
4050
1925
1284 0 1342 1284 245 1100 1301 0 1289 1316 0 1252 Fourth
602 943 635 602 684 498 612 841 605 620 907 583
2400
4050
4050
4050
2400
1321 0 1341 1287 245 1115 1305 0 1291 1319 0 1290 Third
623 933 635 603 684 506 614 841 606 622 899 605
2400
4275
4275
4275
2400
1294 0 1323 1266 245 1109 1285 0 1275 1302 0 1265 Second
608 933 624 591 685 502 602 840 596 612 899 591
2400
4275
4275
4275
2400
1245 0 1254 1193 245 1063 1218 0 1211 1240 0 1224 First
579 939 585 549 688 477 564 840 560 576 898 567
3000
4275
4275
4275
3000
4750
4750
4750
3000
X
216 204 204 248 204 204 204 204 204 204 204 211 Basement
204 204 204 204 204 204 204 204 204 204 204 204
3000
4750
4750
4750
3000
Base
3 3 3 3 3 3 3
A B LY LY C D E
3217
2783
2843
872 163 1242 1361 146 1204 1140 20 1151 1248 183 800 Roof Terrace
515 1196 577 647 1179 556 519 1057 526 581 1215 514
3503
2605
2000
2421
3144
1269 5 1209 1143 0 1119 1114 0 1126 1246 51 1199 Tenth
593 1042 559 521 853 508 505 844 511 580 1087 553
1929
2000
2000
2000
1916
1206 8 1233 1159 0 1106 1122 0 1131 1270 55 1139 Ninth
557 1045 572 530 856 500 509 841 514 593 1091 519
2089
2400
2400
2400
2171
1235 1.994E-01 1226 1153 0 1122 1133 0 1129 1265 48 1166 Eighth
574 1037 568 527 855 510 515 842 514 590 1083 534
1925
2400
2400
2400
1925
1288 0 1277 1227 0 1202 1213 0 1207 1310 42 1238 Seventh
604 1029 597 569 855 554 561 842 557 617 1078 575
2388
3000
3000
3000
2404
1355 0 1350 1296 0 1270 1284 0 1274 1385 42 1302 Sixth
643 1030 640 608 855 594 602 843 596 661 1078 612
2099
3000
3000
3000
2354
1404 0 1410 1361 0 1338 1351 0 1339 1445 42 1352 Fifths
672 1030 676 647 851 633 641 839 634 697 1077 641
2337
4050
4050
4050
2323
1475 0 1456 1412 0 1393 1406 0 1390 1492 245 1425 Fourth
715 1007 704 677 852 666 674 840 664 726 1063 685
2400
4050
4050
4050
2400
1538 0 1475 1428 0 1411 1422 0 1409 1510 245 1480 Third
754 992 715 687 852 676 683 840 675 737 1055 718
2400
4275
4275
4275
2400
1518 0 1475 1423 0 1407 1417 0 1404 1507 245 1467 Second
742 995 715 684 851 674 680 840 672 735 1055 710
2400
4275
4275
4275
2400
1392 245 1376 1351 0 1342 1345 0 1344 1438 19 1415 First
665 937 656 641 852 636 637 839 637 693 1056 679
3000
4275
4275
4275
3000
4750
4750
4750
3000
X
265 204 232 233 204 232 232 204 234 233 204 258 Basement
204 204 204 204 204 204 204 204 204 204 204 204
3000
4750
4750
4750
3000
Base
4 4 4 4 4 4 4
A B LY LY C D E
Water Tanker
681 0 1052 950 0 910 897 0 954 941 0 647 Roof Terrace
559 978 471 429 828 413 408 827 431 425 925 583
2770
4814
2000
2000
2607
1017 0 986 946 0 974 950 0 983 878 0 977 Tenth
455 779 443 427 684 438 429 680 442 400 747 439
1575
2000
2000
2000
1575
952 0 1006 973 0 969 964 0 988 924 0 924 Ninth
429 784 451 438 682 436 434 680 444 419 751 418
1575
2000
2000
2000
1575
1098 0 1100 1092 0 1091 1089 0 1103 1055 0 1077 Eighth
496 777 497 493 683 492 491 680 499 472 745 484
1925
2400
2400
2400
1925
1196 0 1190 1183 0 1180 1180 245 1192 1144 0 1174 Seventh
551 772 548 544 683 542 542 679 549 522 741 539
1925
2400
2400
2400
1925
1276 245 1273 1264 0 1257 1261 245 1269 1233 0 1257 Sixth
597 765 595 590 682 586 589 679 593 572 740 586
1925
2400
2400
2400
1925
1338 245 1364 1356 0 1348 1350 245 1356 1314 245 1320 Fifths
633 766 649 644 682 639 640 678 644 619 742 622
1925
3000
3000
2800
1925
1419 245 1425 1412 245 1405 1408 245 1413 1375 245 1399 Fourth
681 753 685 677 683 673 675 679 678 655 728 669
2400
3000
3000
3000
2400
1482 245 1474 1454 245 1448 1453 245 1460 1423 245 1466 Third
720 746 715 702 683 699 702 678 706 684 722 710
2400
3600
3600
3600
2400
1477 245 1489 1466 245 1462 1466 245 1471 1433 245 1468 Second
716 746 724 710 682 707 710 679 713 690 721 711
2400
3600
3600
3600
2400
1413 245 1411 1379 245 1378 1376 245 1395 1348 245 1395 First
678 748 677 657 678 657 656 673 667 639 726 667
3000
4050
4050
4050
3000
Z 437 204 465 455 204 466 466 204 444 566 277 563 Ground
482 204 450 465 204 455 456 204 481 449 282 464
3000
4050
4050
4050
3000
298 204 278 274 204 278 272 204 282 274 204 295 Basement
204 204 204 204 204 204 204 204 204 206 204 205
3000
4050
4050
4050
3000
Base
LX LX LX LX LX LX LX
A B LY LY C D E
Water Tanker
438 438
438 438
Roof Terrace
438 438
438 438
Tenth
438 438
438 438
Ninth
438 438
438 438
Eighth
438 438
438 438
Seventh
438 438
438 438
Sixth
438 448
438 438
Fifths
483 493
485 483
Fourth
522 529
524 524
Third
553 556
555 556
Second
563 558
567 564
First
523 520
529 530
Z Ground
532 507
435 474
Basement
Base
B+G+10+T Etabs
Elevation
Model-Final-1.EDB
View - LX Spandrel Longitudinal Reinforcing (mm²) (Eurocode 2-2004)
ETABS 19.1.0 8/21/2023
LX LX LX LX LX LX LX
A B LY LY C D E
Water Tanker
900
900
Roof Terrace
1315
1315
Tenth
1566
1584
Ninth
1606
1608
Eighth
1529
1462
Seventh
1382
1271
Sixth
1073
905
Fifths
900
900
Fourth
900
900
Third
900
900
Second
1564
1815
First
2467
3165
Z
Ground
3794
X
4072
Basement
4094
4237
Base
B+G+10+T Etabs
Elevation
Model-Final-1.EDB
View - LX Pier Longitudinal Reinforcing Areas (mm²) (Eurocode 2-2004)
ETABS 19.1.0 8/21/2023
4 3 2 LX LX 1 1'
LY LY LY LY LY LY LY
Water Tanker
950
950
Roof Terrace
1360
1591
Tenth
1755
1846
Ninth
1943
2124
Eighth
2018
2173
Seventh
2115
2194
Sixth
2218
2138
Fifths
2185
2122
Fourth
2232
2303
Third
2383
2597
Second
2728
3144
First
3323
4694
Z
Ground
4538
Y
6873
Basement
5383
5603
Base
B+G+10+T Etabs
Elevation
Model-Final-1.EDB
View - LY Pier Longitudinal Reinforcing Areas (mm²) (Eurocode 2-2004)
ETABS 19.1.0 8/21/2023
A B LY LY C D E
6 (m) 0.8 (m) 1.8 (m) 3.4 (m) 6 (m) 6 (m)
178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89
1'
295.52
627.90
677.53
300.67
611.61
1.6 (m)
309.13 306.31
303.98 301.16
727.46 692.65
785.15 747.38
634.59 626.84
178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89
1
1.53 (m)
178.89
178.89
178.89
178.89
178.89
LX
1.9 (m)
178.89
178.89
178.89
178.89
178.89
LX
178.89
178.89
178.89
178.89
178.89
1.8 (m)
178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89
2
178.89
178.89
178.89
178.89
178.89
5.2 (m)
178.89
178.89
178.89
178.89
178.89
178.89
178.89
178.89
178.89
178.89
178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89
3
178.89
178.89
178.89
178.89
178.89
178.89
178.89
178.89
178.89
178.89
6 (m)
178.89
178.89
178.89
178.89
178.89
178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89
4 X
B+G+10+T
Plan View
Etabs
- Basement
Model-Final-1.EDB
- Z = -1.3 (m) Shear Plus Torsion Reinforcing, (Av/s+2*At/s) (Eurocode 2-2004)
ETABS 19.1.0 8/21/2023
A B LY LY C D E
6 (m) 0.8 (m) 1.8 (m) 3.4 (m) 6 (m) 6 (m)
143.11 143.11 143.11 143.11 143.11 143.11 143.11 143.11 143.11 143.11 143.11 143.11
1'
204.20
445.79
427.05
410.51
212.48
1.6 (m)
215.43 215.42
215.47 215.44
470.58 468.16
451.45 449.04
431.48 429.07
338.38 193.21 412.28 178.89 178.89 178.89 485.68 196.58 360.51 355.52 194.62 329.82
1
1.53 (m)
178.89
570.74
178.89
355.28
362.28
LX
1.9 (m)
178.89
178.89
178.89
778.83
194.05
LX
178.89
302.80
950.92
289.90
178.89
1.8 (m)
347.61 229.69 399.57 312.52 216.05 347.54 376.71 229.95 370.61 381.16 231.69 343.63
2
178.89
283.66
178.89
287.74
288.25
5.2 (m)
178.89
178.89
178.89
191.57
178.89
178.89
260.76
257.51
275.78
178.89
343.68 236.66 382.26 383.49 239.41 380.85 391.25 247.28 436.31 562.50 326.18 475.48
3
178.89
395.07
403.69
559.54
178.89
178.89
227.31
231.84
301.44
178.89
6 (m)
178.89
336.02
337.41
414.71
178.89
178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89 178.89
4 X
B+G+10+T
Plan View
Etabs
- Ground
Model-Final-1.EDB
- Z = 1.5 (m) Shear Plus Torsion Reinforcing, (Av/s+2*At/s) (Eurocode 2-2004)
ETABS 19.1.0 8/21/2023
A B LY LY C D E
6 (m) 0.8 (m) 1.8 (m) 3.4 (m) 6 (m) 6 (m)
1'
178.89
178.89
1.6 (m)
179.43
178.89
192.55
181.99
436.01 339.80 584.49 178.89 178.89 178.89 649.48 297.09 503.46 385.11 217.29 398.80
1
1.53 (m)
557.18
583.69
508.44
515.56
417.57
LX
1.9 (m)
197.24
178.89
237.03
227.28
454.01
LX
409.89
331.69
453.48
692.97
445.31
1.8 (m)
486.90 277.41 442.29 436.82 259.93 360.64 410.35 265.04 406.23 418.33 275.54 472.21
2
374.89
309.14
394.10
314.07
317.86
5.2 (m)
178.89
208.63
225.75
208.29
252.41
201.37 143.11 143.11
172.98
303.27
342.00
286.22
287.43
290.23
191.06
202.61
515.39 318.44 430.83 414.59 283.10 414.00 413.74 281.46 410.47 457.19 859.16 497.90
3
428.58
477.45
521.54
433.14
428.62
269.88
245.08
259.97
256.46
254.73
6 (m)
460.71
508.95
566.15
443.25
433.10
553.87 275.45 398.23 383.67 259.33 385.45 386.38 278.88 382.79 500.41 267.83 453.59
4 X
B+G+10+T
Plan Etabs
View - Model-Final-1.EDB
First - Z = 4.7 (m) Shear Plus Torsion Reinforcing, (Av/s+2*At/s) (Eurocode 2-2004)
ETABS 19.1.0 8/21/2023
A B LY LY C D E
6 (m) 0.8 (m) 1.8 (m) 3.4 (m) 6 (m) 6 (m)
1'
178.89
178.89
1.6 (m)
178.89
178.89
178.89
178.89
463.09 440.76 692.77 178.89 178.89 178.89 736.94 383.85 565.46 405.21 206.07 361.88
1
1.53 (m)
604.49
705.22
502.48
494.01
411.15
LX
1.9 (m)
384.67
444.86
383.54
799.68
264.53
LX
492.26
421.24
799.68
327.70
459.24
1.8 (m)
440.12 269.76 457.04 459.45 216.98 288.71 386.35 257.08 406.92 413.03 263.65 420.37
2
297.22
364.54
245.93
387.54
289.99
5.2 (m)
218.31
208.74
210.44
178.89
178.89
143.11 143.11 143.11
178.89 178.89 178.89
143.11
196.28
200.57
350.40
362.00
290.65
178.89
162.47 159.93
192.58
195.62
692.56 687.81 439.75 487.53 294.64 464.40 401.68 253.38 398.31 446.35 778.22 390.80
3
457.34
437.91
431.64
422.22
430.79
304.37
314.12
256.71
250.63
256.70
6 (m)
508.50
542.13
434.08
424.69
455.74
425.48 222.58 390.35 351.67 214.66 350.65 350.02 219.83 343.66 494.17 224.34 411.46
4 X
B+G+10+T
Plan ViewEtabs
- RoofModel-Final-1.EDB
Terrace - Z = 36.7 (m) Shear Plus Torsion Reinforcing, (Av/s+2*At/s) (Eurocode 2-2004)
ETABS 19.1.0 8/21/2023
A B LY LY C D E
6 (m) 0.8 (m) 1.8 (m) 3.4 (m) 6 (m) 6 (m)
1'
1.6 (m)
178.89
369.31
856.27
LX
1.9 (m)
178.89
215.70
572.54
LX
178.89
292.25
658.40
1.8 (m)
372.23
634.69
5.2 (m)
359.83
212.19
315.86
782.58
401.44
832.78
4 X
B+G+10+T
Plan View Etabs
- Water
Model-Final-1.EDB
Tanker - Z = 39.7 (m) Shear Plus Torsion Reinforcing, (Av/s+2*At/s) (Eurocode 2-2004)
ETABS 19.1.0 8/21/2023
LX LX LX LX LX LX LX
A B LY LY C D E
Water Tanker
438.61 436.41
0.00 0.00
Roof Terrace
483.77 493.25
0.00 0.00
Tenth
566.11 618.26
0.00 0.00
Ninth
695.49 740.15
0.00 0.00
Eighth
803.60 840.32
0.00 0.00
Seventh
918.96 941.87
0.00 0.00
Sixth
1055.43 1070.76
0.00 0.00
Fifths
1161.04 1171.32
0.00 0.00
Fourth
1247.19 1252.79
0.00 0.00
Third
1313.66 1314.10
0.00 0.00
Second
1330.82 1326.30
0.00 0.00
First
1235.44 1228.72
0.00 0.00
Z
Ground
1115.36 1066.05
0.00 0.00
X
Basement
Base
B+G+10+T Etabs
Elevation
Model-Final-1.EDB
View - LX Spandrel Shear Reinforcing (mm²/m) (Eurocode 2-2004)
ETABS 19.1.0 8/21/2023
LX LX LX LX LX LX LX
A B LY LY C D E
Water Tanker
320.41
320.41
Roof Terrace
450.64
450.64
Tenth
443.37
443.37
Ninth
474.65
474.65
Eighth
477.92
477.92
Seventh
535.99
535.99
Sixth
593.96
593.96
Fifths
661.65
661.65
Fourth
695.31
695.31
Third
920.81
920.81
Second
1226.39
1226.39
First
1577.42
1577.42
Z
Ground
1541.30
X
1541.30
Basement
1128.84
1128.84
Base
LX LX LX LX LX LX LX
A B LY LY C D E
Water Tanker
438.61 436.41
0.00 0.00
Roof Terrace
483.77 493.25
0.00 0.00
Tenth
566.11 618.26
0.00 0.00
Ninth
695.49 740.15
0.00 0.00
Eighth
803.60 840.32
0.00 0.00
Seventh
918.96 941.87
0.00 0.00
Sixth
1055.43 1070.76
0.00 0.00
Fifths
1161.04 1171.32
0.00 0.00
Fourth
1247.19 1252.79
0.00 0.00
Third
1313.66 1314.10
0.00 0.00
Second
1330.82 1326.30
0.00 0.00
First
1235.44 1228.72
0.00 0.00
Z Ground
1115.36 1066.05
0.00 0.00
Basement
Base
B+G+10+T Etabs
Elevation
Model-Final-1.EDB
View - LX Spandrel Shear Reinforcing (mm²/m) (Eurocode 2-2004)
Footing
F-1 Y
Footing Group ISOLATED FOOTING
Super-structure load, Ps (Kn) (Ultimate) 8066.80
Mx (Kn-m) (Ultimate) 72.97 Ly b
My (Kn-m) (Ultimate) -1.04 X
Column width, a (m) * b(m) 0.50 0.95 a
Foundation depth, fd (m) 2.00 Lx
Ultimate bearing capacity, s (Kpa)(3*Qall) 1398.54 Lx
Footing Dimension, (Lx * Ly ) m 3.80 3.80 Footing Plan
Depth, D (m) 1.20
Footing Area, Af (m2) 14.44 f cu = 30 kN/mm
2