11KV AUTOMATIC/MANUAL CHANGEOVER PANE:

Make12 SWG mild steel sheet fabricated, free standing, floor mounting, indoor type suitable for 11Kv 3-phase, 50Hz system,
Powder painted, complete in all respect including Electrolytic hard drawn Copper bus bars, Shutters, internal wiring and cable
termination arrangement as per WAPDA standard following specification P44:2018

01 11KV AUTOMATIC/MANUAL CHANGEOVER PANEL FOR LESCO FEEDER 1 & 2 01 Set.


Sr.# Description of each Component Make Quantity
01 630A TP 12KV VCB 25KA BILL 95KV draw Out Type With WAPDA Approved 02 Nos.
110VDC closing coil/Trip Coil 110VDC/MOM 230VAC, Complete
in all Respect.
02 Electronics IDMT Over Current/Short circuit & Earth Fault Protection WAPDA Approved 02 Nos.
Relay
03 11kV Current Transformers 400/5 for Metering FICO/Metalx 06 Nos.
(WAPDA Approved)
04 11kV Current Transformers 400/5 for Protection FICO/Metalx 06 Nos.
(WAPDA Approved)
05 Single Pole Potential Transformer Ratio 11000/110V, Cast Resin FICO/Metalx 06 Nos.
Type (WAPDA Approved)
06 Ampere Meter 0~400/5A Flush Mounted 96*96MM Lumel Poland 06 Nos.
07 Volt Meter 0~15KV Flush Mounted 96*96MM Lumel Poland 02 Nos.
08 Volt Selector Switch. GGT Italy 02 Nos.
09 Auto/Manual Selector Switch GGT Italy 01 No.
10 Under/Over & phase failure/reversal relay Klemsan 02 Nos.
11 Timer with base 02 Nos.
12 Push Button 25MM for VCB (Red ON/ Green OFF) WAPDA Approved 02 Nos.
13 Push Button 25MM FOR RESET WAPDA Approved 02 Nos.
14 Indication Lamp 25mm 110VAC/110VDC WAPDA Approved 02 Nos.
15 6A TP Control MCB 6KA WAPDA Approved 02 Nos.
16 6A DP Control MCB 6KA For Motor Drive & Control Circuit. WAPDA Approved 04 Nos.
17 Capacitor Trip Unit (110VDC) E-Lab 01 No.
18 Auxiliary Contactor 2NO+2NC ABB/Schneider 02 Nos.
19 Digital KWH/KVARH Meter 02 Nos.
20 11kv Insulator for Fitting Arrangement Bus Bar WAPDA Approved 01 Job
21 Control & CTs Terminal Block WAPDA Approved 01 Job
22 Cable Gland Arrangement WAPDA STANDARD 01 Job
23 Heat Shrink Sleeve for Copper Bus Bar as per Rating. WAPDA Approved. 01 Job
24 Cable chamber for out going cable arrangement on left side of Panel 01 Job

Note:
 11KV Automatic/Manual Change Over Panel for operation of duplicate source of supply. The proper installation &
testing of the same should be ensure by manager M & T (West) before the execution of work.
 It would be the responsibility of manufacturer to ensure that all the electrical system as per standards
and meets the condition/Requirement set by WAPDA.
 Interlocking scheme for automatic changeover would be the responsibility of manufacturer.
 Manufacturer to ensure that all required items are included in the panel for proper functioning of ATS as per requirement.