INDUS HOSPITAL QF, NST & SMP CAMPUS, JUBILEE TOWN, LAHORE Point of Contact: Farhan Wali & Muhammad Arshad
Co-ordination with RA regarding Generator, Sync Panel, Load R.A engineering team visited twice for pending work but still
1 Addition Panel Issues, And Staff Replacement 22-Dec-2022 7-Jan-2023 In Progress Farhan Wali/Arshad job is not done. E-mail was generated to send a competent
team for this job.
A few quotations have been received, and a few are
2 Quotations submission from all vendors 28-Dec-2022 7-Jan-2023 In Progress Farhan Wali/Arshad pending, taking continous follow up with vendors.
4 Catch up with Kone on minutes of meeting technical points 2-Jan-2023 7-Jan-2023 In Progress Farhan Wali/Arshad HOTO testing is in progress
6 LESCO Load Extension Case Progress - - In Progress Farhan Wali/Arshad Documentation pending from administration end.
Down Lights dressing and finishing work is pending at the Cable Dressing Done, Status of Lights is pending from
15 Ambulance Parking area. 9-Jan-2023 14-Jan-2023 In Progress Farhan Wali/Arshad project side as the DB is not yet enegised.
Mechanical Department Tasks Tracker Sheet
INDUS HOSPITAL QF, NST & SMP CAMPUS, JUBILEE TOWN, LAHORE Point of Contact: Aamir Mehmood
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
BMS Department Tasks Tracker Sheet
INDUS HOSPITAL QF, NST & SMP CAMPUS, JUBILEE TOWN, LAHORE Point of Contact: Abdul Samad
Pit 4 Camera Installation to be tracked with Rafaqat Sb Follow up email has been sent. Waiting
2 on email- Reminder 27-Dec-2022 12-Jan-2023 In Progress Abdul Samad for Mr. Rafaqat's response
8 Roof glass should always look clean 9-Jan-2023 14-Jan-2023 In Progress Abdul Samad To be discussed with Mr. Israr
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
ELV Department Tasks Tracker Sheet
INDUS HOSPITAL QF, NST & SMP CAMPUS, JUBILEE TOWN, LAHORE Point of Contact: Nasarullah
4 No camera coverage is available for atrium area. 9-Jan-2023 14-Jan-2023 In Progress Nasar Ullah To be coordinated with Project team.
6 All installed cameras should be properly cleaned. 9-Jan-2023 14-Jan-2023 In Progress Nasar Ullah Nasar Ullah to manage
7 QMS in OPD-1 is not working. 9-Jan-2023 14-Jan-2023 In Progress Nasar Ullah Nasar Ullah will coordinate
8 ACS of Electrical room OPD-1 is powered off. 9-Jan-2023 14-Jan-2023 In Progress Nasar Ullah Nasar Ullah will coordinate
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Medical Gases Department Tasks Tracker Sheet
INDUS HOSPITAL QF, NST & SMP CAMPUS, JUBILEE TOWN, LAHORE Point of Contact: Waqas Ahmad
1 Material List 1-Jan-2023 7-Jan-2023 Done Waqas Ahmad Already discussed with Sheraz sb
Code opening is still in process with Store management.
2 DR for X-Ray Rooms (Cabinets + Exposure Light + Mic) 27-Dec-2022 7-Jan-2023 In Progress Waqas Ahmad Follow up to be taken
Code generated but ERP error still needs to be resolved by
3 DR for Oxygen Regulator 2-Jan-2023 8-Jan-2023 In Progress Waqas Ahmad head office. Follow up to be taken
4 Quotation Submission 26-Dec-2022 8-Jan-2023 In Progress Waqas Ahmad Email sent. Waiting for the quotation from the supplier.
5 Drawer keys issue - management office. 9-Jan-2023 14-Jan-2023 In Progress Waqas Ahmad To be coordinated with project team.
6 Damaged Roof Glass is to be installed. 9-Jan-2023 14-Jan-2023 In Progress Waqas Ahmad To be coordinated with project team
7 Additional thread rods to be removed from lift lobby. 9-Jan-2023 14-Jan-2023 In Progress Waqas Ahmad To be coordinated with project team
8 Damaged terracotta tiles are to be replaced. 9-Jan-2023 14-Jan-2023 In Progress Waqas Ahmad To be coordinated with project team
9 Drywall screws required for Cardiac Monitor Stands 10-Jan-2023 14-Jan-2023 In Progress Waqas Ahmad DR Raised - Follow up to be taken from Arshad
Email already received from Tabish - To be discussed with
10 Budget of Fridge for Placental Disposal 10-Jan-2023 14-Jan-2023 In Progress Waqas Ahmad Sheraz sb
11 Installation of Sink pending at Cafeteria 10-Jan-2023 14-Jan-2023 In Progress Waqas Ahmad To be coordinated with project team
12 Pyodine Scrub stand sample required from Mr. Adeeb. 10-Jan-2023 14-Jan-2023 In Progress Waqas Ahmad To be coordinated with project team
13 Oven and Fridge's specifications required from facility end. 10-Jan-2023 14-Jan-2023 In Progress Waqas Ahmad Aamir will confirm about the requested specifications.