Sr.No. Title Remark
1__|Method Statement for Precast Factory Setup
2__|Method Statement forking Activities including Handling and Storage
‘3___[Method Statement for Material Handling and Storage
‘4 [Method Statement for Production of Prefabricated Track Slabs
'5__ [Method Statement for Survey Works (Precast Slab)
6
7
8
[Method Statement for Procedure for inspection and Barcode-System Track-Slab
[Method Statement for Installation of Siab Track System
[Method Statement for Flash Butt Welding
9 |Method Statement for Alumino Themic Welding
10 |Method Statement for Survey Works (Track)
1__|Method Statement for Installation of Embedded and Column Track in Depot
“12___|Method Statement for PIT Track Installation
13 |Method Statement for Ballasted Track Turnout & Scissors Crossovers Installation
14 [Method Statement for Installation of Ballasted Track in Depot and Test Track
15__ [Method Statement for Ling - lowering of Flash butt weld Machine in Tunnel & Viaduct
16 [Method Statement for Handling and Stacking of Rails in Underground & Viaduct,
17 __ [Method Statement for Main Line Ballast Less Track Installation
18 [Method Statement for Destressing