QL: A: building consists of basement ground , 1" floors, The cost per m2 of ground
P 1D/m2 , calculate the basement ratio from the other floors if the basement cost per m2
1D/m2.
(te xt)
B Calculate the estimated cost of a proposed building consists of a basement! , ground (25*20) m ,1"
(10°10) m, 2" (19°25) m floors , located in ajcrowded area And its supposed to start the work at the
end of 2002 that will be completed in 2004 , its wery good specification ay actual
the contractor , the cost per m2 of basement 40% and roof 30% of the other floors costs. There is an old
building located if crowded area with dimensions (27°55) m consists of basement, with
ground ,1", 2 f the total cost 25 millon 10 that had been started at end of 1998 for two years
(no contract 'iۤ to the contractor and (good specificat
consideration:
1- Crowded or not 6%
2+ Specifications 7%
3- Structure simple to complicated 65%
4- Contractual facilities 3%
5- Annual prices increases 7%
QL:C: Considered you as contractor offering on you contracting for road
evaluate the following quantities for length 1m:
1-Exacvition foundation
2-Bedding with crashed brick 0.08m
3-Concrete foundation
4-Bricks works
5-Roof concrete
6-Gravel layerape
Bip get Piped § is fob abiOR sscs % SCTES KFS MAS Sm