مد مسح كمي + الحلول النموذجية

You might also like

Download as pdf
Download as pdf
You are on page 1of 7
QL: A: building consists of basement ground , 1" floors, The cost per m2 of ground P 1D/m2 , calculate the basement ratio from the other floors if the basement cost per m2 1D/m2. (te xt) B Calculate the estimated cost of a proposed building consists of a basement! , ground (25*20) m ,1" (10°10) m, 2" (19°25) m floors , located in ajcrowded area And its supposed to start the work at the end of 2002 that will be completed in 2004 , its wery good specification ay actual the contractor , the cost per m2 of basement 40% and roof 30% of the other floors costs. There is an old building located if crowded area with dimensions (27°55) m consists of basement, with ground ,1", 2 f the total cost 25 millon 10 that had been started at end of 1998 for two years (no contract 'i€§ to the contractor and (good specificat consideration: 1- Crowded or not 6% 2+ Specifications 7% 3- Structure simple to complicated 65% 4- Contractual facilities 3% 5- Annual prices increases 7% QL:C: Considered you as contractor offering on you contracting for road evaluate the following quantities for length 1m: 1-Exacvition foundation 2-Bedding with crashed brick 0.08m 3-Concrete foundation 4-Bricks works 5-Roof concrete 6-Gravel layer ape Bip get Piped § is fob abi OR sscs % SCTES KFS MAS Sm ce 2 SOS Sen & Fs 6 i 2 Ae coe Sam # FOXS- As ae a

You might also like