CONTEXT
The overall Context Analysis for NAVITRANS is reported in QL-ML002-v3 - Navitrans Context analysis.
CRITERIA
• General risk ISO 9001
The criteria will allow to attribute the level of SEVERITY and PROBABILITY. Then, the Risk Index is obtained by multiplying t
priority of the actions to be taken.
In the tab "Risk Register", the risks associated to every department are identified, analysed, evaluated and mitigation mea
In the tab "Conclusions", the results of the risk assessment are summarised.
NAVITRANS S.A., NAVITRANS SENEGAL, CIAM IVORY COAST, NAVITRANS GABON, NAVITRANS FRANCE, CONGO ENERGY SE
CAMEROUN SA, ESA & CITA ANGOLA.
Switzerland, Senegal, Ivory Coast, Gabon, France, Congo, Benin, Cameroun, Angola.
SWITZERLAND
CONTEXT
Context Analysis for NAVITRANS is reported in QL-ML002-v3 - Navitrans Context analysis.
CRITERIA
will allow to attribute the level of SEVERITY and PROBABILITY. Then, the Risk Index is obtained by multiplying the levels of Severity and
he actions to be taken.
Risk Register", the risks associated to every department are identified, analysed, evaluated and mitigation measures recorded.
Name
by multiplying the levels of Severity and Probability. This Risk Index allows to define the
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Err:507
Err:507
Err:507
Err:507
Err:507
Err:507
Err:507
Err:507
Err:507
Err:507
Err:507
Err:507
Err:507
Err:507
Err:507
Err:507
2022-2023 Technology
2022-2023 Training
2022-2023 Audits
2022-2023 Audits
2022-2023 Developments
2022-2023 Commercial
2022-2023 Quality
LIST OF PARTICIPANTS
Name: Job title: Signature:
A reduction of productivity
and a temporary or Staff are unable to work;
No effect on the working permanent loss of or temporary or permanent
Impact on staff atmosphere or the worsening of the working loss of jobs caused by an
productivity of the workers. atmosphere with trade interruption of the process;
union disputes, loss of strikes, loss of human life.
working hours.
Finally, the risk index defines the priorities of the actions to be taken:
Risk index
1≤R≤2 Low L
3≤R≤5 Medium M
6≤R≤9 High H
Then to obtain the level of risk, multiply the severity and the probability (S x P):
Level of The event happened at least once during the past 10 years.
probability (P) 1 2 3 4 5
1 1 2 3 4 5
2 2 4 6 8 10
3 3 6 9 12 15
4 4 8 12 16 20
5 5 10 15 20 25
Finally, the risk index defines the priorities of the actions to be taken:
Risk index Actions to be undertaken
1≤R≤2 Negligible risks in respect of which no particular action is necessary.
Marginal risks in respect of which the proper implementation of the
3≤R≤4 Intermediate risks in respect of which constant attention and raising of
Integrated Management System controls the risks.
5 ≤ R ≤ 14 awareness is necessary to reduce the risks and actions are required if
Unacceptable risks, in respect of which technical-organizational
practicable.
15 ≤ R ≤ 25
solutions must be adopted to reduce their level.