Professional Documents
Culture Documents
SUMMARY
SUMMARY
SUMMARY
DEMAND
PROPOSED G+1 WAREHOUSE ON PLOT NO 597-1203 AT INVESTMENTS OWNER : M/S TURNKEY PLUSE CONTRACTING L.L.C
PARK,DUBAI.
CONSULTANT : Ecogreen Arch& Engg. LOCATIO COMPOUND WALL
DESIGNATION : LOAD SUMMARY FED FROM : DEWA PLOT: 597-1203
CIRCUIT RATING -AMPS FAULT PVC / CABLE SIZE ECC CONNECTED LOAD (kW) KWH METER
FEEDER SP TP ISO MCCB ACB DUTY XLPE 2/4 x 1C 2/3/4C SIZE 1C R-PHASE Y-PHASE B-PHASE TOTAL 1-F 3F 3-F CT REMARKS
DB NO. DOT kA SWA/PVC MM2 MM2 MM2 (kW) (kW) (kW) KW (1) (2) (3) (4)
OUTGOING:-
METER CABINET-01 TP 350 50 XLPE DEWA 1C,120 57.63 57.85 57.51 173.00 1
METER CABINET-02 TP 300 50 XLPE DEWA 1C,95 50.00 50.00 50.00 150.00 1
DEWA AND GENERATOR INCOMMING BREAKERS ARE ELECTRICALY AND MECHANICALY INTERLOCKED
NOTE:- TOTAL CONNECTED LOAD PER PHASE 107.63 107.85 107.51 323.00 2