All Drawing Facility DAM Area.

dwg
11/22/2023 3:00:48 PM

ISOMETRIC 3D VIEW
BOTTOM INTAKE
EMBEDDED PARTS

DETAIL I

CUSTOM PED EYE


FOR WEIGHT 2.2 T.
20mm THK. 2Pcs

REV. DATE DESCRIPTION DRN CHK'D APP'D

DOC NO. REFERENCES DOCUMENTS

Front View Side View PT KERINCI MERANGIN HIDRO


Jl. Raya Bekasi - Cibinong km 19.5, Cileungsi, Bogor
Phone: (62-21) 8232323, Fax: (62-21) 8232626

PT BUKAKA TEKNIK UTAMA


HYDROPOWER ENGINEERING DIVISION
Engineering Center 2nd Floor
Jl. Raya Bekasi - Cibinong km 19.5, Cileungsi, Bogor
Phone: (62-21) 8232323, Fax: (62-21) 8232626

EXTERNAL USE INTERNAL USE PROJECT


- FOR REVIEW x FABRICATION
MERANGIN HYDROELECTRIC
x FOR CONSTRUCTION REFERENCE

- AS BUILT
POWER PLANT 350 MW
Sign Date AREA
Approved : M. Yusri Rauf INTAKE/DAM
Sign Date
Passed : Hari Suhartanto ENVIRONMENTAL RELEASE FACILITY
Sign Date
Checked : Bima P.F LIFITNG PLAN BOTTOM EMBEDDED
Sign Date
Drawn : Agus MKD. NO. M04-FD-3622 / 6
Projection Method: SCALE SHEET DRAWING NUMBER REV.
T. Appx. 420 Kg THIRD ANGLE
A1 1 : 15 1 of 1 FDRG LH41-M04-G00-GA-3620 0