Summary of Rain Water Leakage Report - 07.11.2023
Summary of Rain Water Leakage Report - 07.11.2023
2 B6 Emergency staircase Rain water dripping from the B6 Emergency staircase RCC Water clogging to be cleaned Terrace end floor Cracks to 1. Periodical terrace cleaning Currently no ladder is
emergency staircase roof top Terrace rain water not passed and area cleaning to be done be rectified and water to be done available to reach the terrace
RCC Ceiling into the drain port due to proofing to be done 2.Roof/Terrace area point. Hence new ladder to be
drain point is clogged with preventive maintenance to be installed
foreign matters and cracks introduced
also observed the ceiling. Due
to more water stagnation in
the terrace and its dripped in
the downside through cracks
3 B4 Store room Rain water dripping from the Rain water entered in the Area cleanings has been done Duct insulation to be done 1. Periodical terrace cleaning NA
AHU duct AHU duct gap in the terrace and additional protection to to be done
be enhanced 2.Roof/Terrace area
preventive maintenance to be
introduced
Page 1 of 3
Classification: Internal Use
#
5 B3 AHU Room and near Rain water dripping from duct B9 Metal Roof top rain water Area Water stagnation has 1.Rain water gutter has been 1. Periodical rain water gutter 1. MS Monkey leader needs to
to Emergency Staircase shaft and its passed to GF gutter got clogged with dead been cleaned and Roof top cleaned and water cleaning to be done be converted to MS platform
GF emergency staircase and its pigeons and water back flow inspected for corrective chocking/clogged has been 2.Roof/terrace area ladder like staircase. Since
ceiling tiles got damaged happen into the below ceiling action cleared preventive maintenance to be usage of MS Monkey ladder
2.In Rain water gutter introduced is challenge to climb to reach
additional drain port to be the top of the area.
created
6 B2 Entry area towards Rain water dripping from the Rain water entered in the Area cleanings has been done Duct insulation to be done 1. Periodical terrace cleaning 1. MS Monkey leader needs to
rolling shutter AHU duct AHU duct gap in the terrace and additional protection to to be done be converted to MS platform
be enhanced by providing 2.Roof/Terrace area ladder like staircase. Since
the additional roof sheet with preventive maintenance to be usage of MS Monkey ladder
minor structure introduced is challenge to climb to reach
the top of the area.
Page 2 of 3
Classification: Internal Use
#
8 B4 duct Rain water dripping from the Rain water entered in the Area cleanings has been done Duct insulation to be done 1. Periodical terrace cleaning NA
AHU duct AHU duct gap in the terrace and additional protection to to be done
be enhanced by providing 2.Roof/Terrace area
the additional roof sheet with preventive maintenance to be
minor structure introduced
9 External area towards Rain water flooded heavily Rain water transferring pump Alternating pumping station Rectification of electrical Healthiness of pump and star Additional pumping system
incineration near rain water collection tank got tripped and not working along with fire hydrant reel panel to be done panel to be verified procurements
and water not pumped into due to heavy water hose pipe arranged and rain periodically and electrical
the lake stagnated and electrical panel water transferred to lake operating panel need to be
got wetted and tripped shift to road point and easy
to approachable
2.additioanl portable 2nos
pumping station to be
arranged and kept ready for
emergency use
Page 3 of 3