Operation and Routine Maintenance of NH-25 (New 27) from km 75.

500 to km
80.960 of Jajmau-Ramadevi Section in the state of Uttar Pradesh

BILL NO. DESCRIPTION AMOUNT (In Rs)


1 ROAD MAINTENANCE 2715349.00
ROAD PROPERTY MANAGEMENT AND OTHER
2 3618834.81
MAINTENANCE
SAFETY IMPROVEMENT & RENEWAL WORK
3 64224281.40
(ENGINEERING WORKS)
4 INCIDENT MANAGEMENT 5086224.00
5 BRIDGE WORK 661000.00
6 HORTICULTURE 158176.50
7 TOTAL AMOUNT (IN RS.) (1+2+3+4+5+6=7) 76463865.71
Say 7,64,63,866/-

ITEM NO. 1 ROAD MAINTENANCE


Item Rate Amount
Description of Items Unit Quantity
No. (Rs.) (Rs.)
1.1 Carrying out proper cleaning, and
removing of dust/silt/thrash
/plastic/rubbish/garbage/waste
from the main carriageway (BHS),
foothpaths, Spout Drains, verges
(including the verges of central
median) by mechanical means or
manually and from shoulders
upto Toe line of the embankment
including side slopes manually
and disposing of the waste
material at a suitable place
outside ROW as directed by the
Engineer. The job includes
cleaning of road studs and
delineators also. (Cleaning Work
by Mechanical Means and
sprinkiling water on the road
surface for mitigating dust
polution) Monthly Payment. To
be kept clean.
(a) Main Carriageway (BHS) Km./Month 65.52 12714.00 833021.28
(b) Service Road (BHS) Km./Month 48.00 12714.00 610272.00
1.2 Removal of rank
vegetation/weeds and
undesirable vegetation from Toe
line of embankment slopes to
ROW complete in all respects Sqm. 46896.00 6.00 281376.00
including breaking of clods rough
dressing and disposal of waste
material and vegetation at a
place outside ROW as per

- 108 -
direction of Engineer in charge.
(twice in year i.e. before and
after monsoon). (Rank
Vegetation)

Cleaning, clearing roadside


lined/pucca drains to revive
them to initial drainage capacity
including disposal of recovered
material with all leads and lifts
complete in all respect as
1.3 directed by the Engineer and as RM. 15400.00 62.00 954800.00
per Additional maintenance
Standard Clause no. 5.5.1 as
applicable. (Frequency of
cleaning will be twice in year i.e.
before and after monsoon).
(Drain Cleaning)
Carrying out proper cleaning of
Expansion joint manually as per
Rmt. Per
1.4 direction of Engineer-in-charge. 780.00 46.00 35880.00
month
(Old ,New Bridge & Elevated
portion Clearance per Month)
TOTAL 2715349.00

ITEM NO. 2 ROAD PROPERTY MANAGEMENT AND OTHER MAINTENANCE


Item Rate Amount
Description of Items Unit Quantity
No. (Rs.) (Rs.)
Painting with higloss synthetic enemal paint
two coats to give an even and smooth surface
for protection of exposed concrete/masonary
2.1
portion of Bridges/CD works/ parapet, kerb
painting and repairing wherever necessary,
complete as per approval of Engineer.
A Old existing surface 1 times in a year
(i) Kerb painting Sqm 5457.00 123.20 672302
(ii)Conc. crash barrier Sqm 15168.00 123.20 1868698
2.2 Painting two coats on steel structure to give
an even shade and smooth surface as per
direction of Engineer Incharge.
a) Old existing surface Sqm 8898 96.80 861326
Maintenance of existing single faced W-Beam
metal crash barrier damaged part of beams,
post ,spacer channels/brackets, fastners etc.
job includes repair of old damaged members
by straightening the members include cost of
nut boalt, fixing, concrete etc. and removing RMT/Per
2.3 600.00 360.85 216508
& and repairing all the existing dents as well Month
as other defects and neatly re-fixing the
repaired members complete in all respects to
restore of Technical Specification as per
clause 811 and as directed by Engineer in
charge.
TOTAL 3618835

- 109 -
ITEM NO.3 SAFETY IMPROVEMENT & RENEWAL WORK (ENGINEERING WORKS)
Item Rate Amount
Description Unit Quantity
No. (Rs.) (Rs.)
Cats Eye/Pavement Marker (NMC nail
Less):- Made out of Acrylic-strene-
Acrylonitril or Hi-Impect polysterene
3.1 fitted with Moulded of Methacrylate No. 2500.00 324.00 810000.00
(NMC) reflector cube corner reflector
design; Filled with tightly adhering
potting compound as per ASTM D788s
Providing and fixing retro-reflective
stickers (Engineering grade) of size
3.2 10cm X 5cm on MBCBs and other No. 1200.00 29.40 35280.00
structures as per MoST Cl No. 801 and
as per approval of Engineer in charge.
Providing and applying 2.5 mm thick
road marking strips (retroreflective) of
specified shade/ colour using hot
thermoplastic material by fully/ semi
automatic thermoplastic paint
applicator machine fitted with profile
shoe, glass beads dispenser, propane
tank heater and profile shoe heater,
3.3 sqm 7536.00 623.80 4700956.80
driven by experienced operator on road
surface including cost of material,
labour, T&P, cleaning the road surface
of all dirt, seals, oil, grease and foreign
material etc. complete as per direction
of Engineer-in-charge and accordance
with applicable
specifications.
Providing and fixing single faced W-
Beam metal crash barrier (W - profile
safety guard rails) made out of the
following members. Job includes
erection complete in all respect as per
MOST clause erection complete in all
respect as per MOST clause 810 and
using M:20 grade cement concrete
wherever required as directed by
Engineer. Beam made out of cold rolled
steel strip W profile double of 3mm
3.4 thick having a minimum yield strength Rmt 911.00 3107.00 2830477.00
of 2400 kg/sqcm having width of 313
mm and depth of corrugation as 83 mm
hot dip galvanised of zinc coating @
550gm /sqm.. Post consisting of cold
rolled channel 150 x 75 x 5 mm and
spaced 2 mtr centre to centre having
minimum yield strength of 2400
kg/sqcm. The length of post shall be
1900 mm and minimum height of post
above concrete foundation shall be
800mm. Spacer channels or brackets

- 110 -
made out of CRP steel channel section
150x75x5 mm having an yield strength
of 2400 kg/sqcm. The length of spacer
channel shall be 330mm and hot dip
galvanised having zinc coating @
550gm/Sqm. Fastners: Fastners, Button
head bolts 16x40mm long and 20x40
Hex Bolt, with nut and washer, hot
dipped galvanised including tack
welding to the bolt.
Providing, Laying and Compacting
Granular Sub Base coarse with
3.5 cum 280.00 3716.00 1040480.00
Approved materials complete as per
the Technical specifications of MoRT&H
Providing, Laying and Compacting
Dense Bound Macadam Approved
3.6 materials complete as per the cum 997.54 10480.00 10454219.20
Technical specifications of MoRT&H
(DBM Patch work)
Providing, Laying and Compacting WMM
coarse with Approved materials
3.7 Cum 120 4057.00 486840.00
complete as per the Technical
specifications of MoRT&H
Cast in situ Cement Concrete M20
Kerb : Construction of cement concrete
kerb with top and bottom width 115
and 165 mm respectively, 250 mm high
in M 20 grade PCC on M-10 grade
3.8 foundation 150 mm thick, foundation Rmt 368.00 420.00 154560.00
having 50 mm projection beyond kerb
stone, kerb stone laid with kerb laying
machine, foundation concrete laid
manually, all complete as per clause
408
Milling of distressed bituminous surface
to required depth using milling machine
fitted with loading conveyor for loading
3.9 the milled material directly on to the Sqm 86576 63.00 5454288
trucks for safe disposal with all leads
and lifts. Complete in all respect as
directed by Engineer.
Retro-Reflectorised Traffic Signs:
Providing and fixing of retro-
reflectorised cautionary, mandatory
and informatory sign as per IRC :67
made of high intensity grade sheeting
vide clause 801.3, fixed over aluminium
sheeting, 1.5 mm thick supported on a
3.10
mild steel angle iron post 75 mm x 75
mm x 6 mm firmly fixed to the ground
by means of properly designed
foundation with M15 grade cement
concrete 45 cm x 45 cm x 60 cm, 60 cm
below ground level as per approved
drawing

- 111 -
a) Sign Boards (Triangular, Rectangular
such as Give way, Pedestrian, Hazard Nos. 45.00 2311.00 103995
marker)
b) Gantry Sign Board (Partially Damage
Nos. 2.00 11274.90 22550
(2x2)
c) Delineators Nos. 30.00 828 24840
Providing and fixing of the MS fencing
with MS angle iron 75x75x6mm size for
frame with vertical space 2m &
Horizontal 1.8M. MS Square bar of
height bar of space 0.2mm center to
3.11 Rmt 800.00 2952.00 2361600
center 20mmx20mm height upto 1.2m
from the median level & 0.60m below
ground level fixing with M-15 Concrete
including red oxide and painting as per
direction of Engineer-in-charge.
Providing and laying Bituminous
Concrete (BC-VG-40) wearing course
bitumen (overlay) complete as per
3.12 drawing and Technical Specification
Clause 509 and 521. Total Km. overlay
on bituminous surface has been
considered.
A)- Providing and laying Tack Coat
complete as per Technical
Specifications Clause 503.
On normal bituminous surface @ 2 kg
Sqm. 734 12.00 8812.80
per 10 sqm.
B)- Providing and laying Bituminous
Concrete (BC-VG-40) wearing course
bitumen (overlay) complete as per Cum. 2203 11699.00 25775237
drawing and Technical Specification.
(BC Patch work)
3.13 Providing & laying of 3mm thick Mastic
Asphalt as per direction of Engineer In- Sqm. 5760 265.00 1526400
charge.
3.14 Dismantling reinforcement cement
concrete of reinforcement brick work,
including stacking of materials as per Cum. 374.40 950.00 355680
directed by Engineer In-charge with in
a distance of 60mt. (200 feet)
3.15 U-PVC pipes (working pressure 4 kg /
cm²) Single socketed pipe 110 mm dia
Rmt. 1000.00 143.00 143000
with fixing & fitting on surface of the
structure.
3.16 Drainage work Cast in situ.
Earth work in excavation in trenches Cum 1560.00 156.00 243360.00
for foundations pipes cable etc. in
ordinar soil (Loan clay or sand)
including lift upto 1.5m lead upto 50m
i)
and dressing of sides and ramming of
bottom and disposal of surplus
excavated earth as directed by the
Engineer i/c within a leaded of 50m

- 112 -
Providing & Laying Plain cement Cum 104.00 7213.00 750152.00
ii) concrete M-15 all complete as per
drawings and Technical Specifications
Providing & Laying RCC M-20 for drain Cum 596.00 8815.00 5253740.00
iii) all complete as per drawings and
Technical Specifications
iv) Providing & fixing in position HYDS in 534314.00
drain as per direction of Engineer-in Kg. 5960.00 89.65
charge.
Supplying and fixing of Strip Seal
Expansion Joint as per MoRTH
3.17 Guidelines and IRC norms including Rmt 50 15870.00 793500
removal and dismantling of old
expansion joints
Repair of edge of the footpath RCC Slab
expansion joints of the bridge including
dismantling the edge of slab upto
20mm for exposing the reinforcement,
providing additional reinforcement as
per requirement, providing and placing
3.18 RMt 120 3000 360000
of steel angle of 45x45x5mm size for
expansion joint for making gap of 20
mm and casting of concrete after
treating the surface of old concrete for
joint with new concrete as per the
directions of Engineer in charge
TOTAL 64224281

ITEM NO.4 INCIDENT MANAGEMENT


Item
BOQ BOQ
No. Description of Items Unit Rate
Quantity Amount
Incident Management Services :
4.1 Crane (As per NHAI policy Per Month 12 217800 2613600.00
Guidelines/IRC)
Incident Management Services
comprising route patrol (as per
NHAI Policy
Per
4.2 Guidelines/Strengthening 12 193552.00 2322624.00
Months
Incident Management Services
2018 Policy No. 12.19, dated
20.03.2018.
Providing MBIU alongwith
operators for inspection of
Bridge by the
each
4.3 Consultant/Bridge Expert to 2 75000.00 150000.00
inspection
carryout inspection as per IRC-
SP18 for 02 days each
inspection.
TOTAL 5086224

ITEM NO.5 BRIDGE WORK


Item Rate Amount
Description Unit Quantity
No. (Rs.) (Rs.)

- 113 -
Cleaning of existing Pin & Rolling metal
bearings by sand blasting after lifting the
deck slab system with jacks for
approaching all parts of the bearings
5.1 including oiling and greasing after each 12 10000 120000
cleaning of bearings including all
requirements of scaffolding, temporary
arrangements and for approaching the
site.
Installation of MS iron drainage spout on
old ganga bridge including fixing and
5.2 each 78 1500 117000
installation as per the direction of
Engineer In-charge
Replacement of MS Steel numbers of the
existing Railing of Bridge comprising,
5.3 bars, angles, flats etc alongwith welding Kg. 4000 106 424000
at place and Painting all complete
direction of engineer In-charge.
TOTAL 661000.00

ITEM NO.6 HORTICULTURE


Item Rate Amount
Description Unit Quantity
No. (Rs.) (Rs.)
Planting and Maintaining of Flowering Km 0.50 115676 57838
Plants and Shrubs, Planting flowering
plants and shrubs in central verge (Unit =
6.1 Running metres 200 plants and 800
shrubs in two rows in one km length of
road where width of verge is 3m and
above.)
Maintenance of flowering plants and Km 0.50 200677 100339
6.2
shrubs in central verge for one year
TOTAL 158177

- 114 -