Lab 03
Lab 03
The time taken by needle to penetrate 25mm from the time of mixing of water will be the
IST of the cement.
Determination of final setting time:
Replace the initial setting needle of the Vicat apparatus by vicat final needle.
Release the final needle on the cement paste after every 15-minute interval of time
The time when the vicat needle does not marks a complete circular impression on the
hard cement paste from the mixing of water will be FST of cement.
Use interpolation manually OR in excel to find the Elapsed time (min) corresponding to
penetration of 25 mm. (that will be IST). And Elapsed time corresponding to Zero mm
penetration will be the FST.
ASTM-STANDARD:
For an ordinary Portland cement, the initial setting time should not be less than 30 minutes while
the final setting time should not be more than 600 minutes.
Observations & Calculations:
S.No Description Time Elapsed Time Penetration(mm)
(min)
0 Time (Mixing of water with cement) 9:00 AM --- ---
1 1st Reading
2 2nd Reading
3 3rd Reading
4 4th Reading
5 5th Reading
6 6th Reading
7 7th Reading
8 8th Reading
9 9th Reading
10 10th Reading
11 11th Reading
UET Mardan CE-112L Civil Engineering Material Lab
12 12th Reading
13 13th Reading
14 14th Reading
15 15th Reading
16 16th Reading
Precautions:
Note down the penetration of the vicat needle after 15 minutes of releasing.
Make each penetration test at least 5 mm away from any previous penetration and at
Least 10 mm away from the inner side of the mold.
Comment on Result: